Responses to RFIs.pdf
PDF 44 KB Posted
- Attached to
- Security Cages Amendment 2 Federal contract opportunity
- Solicitation number
- FA442720Q0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Security Cages Amendment 2.pdf | ||
| SOW Security Cages.pdf | ||
| Contract Security Clause.pdf | ||
| Combo Solicitation Security Cages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to RFIs:
1. Will the cages be set on a concrete pad that the cage can be mounted to?
The cage will be mounted on the concrete slab of the building.
2. Where will power be located and at what voltage?
There is a standard 115V wall power source that can be tapped into using an extension cord.
The area the cage will be sitting on will not have an electrical outlet.
3. What is the width of the overhead door?
The width of the main buildings overhead door is 12 foot.
4. Is there a forklift or pallet jack that can be used on base?
The SOW states “The contractor is responsible for providing all materials and equipment necessary to install the security cages.”
5. Will access be granted from 6AM – 8PM?
The expected hours of work for performance is 7:30am – 4:30pm, however more time can be provided on an as needed basis with sufficient justification for doing so.