Comments_From_Recycle_Site_Visit.doc
DOC document 28 KB Posted
- Attached to
- Recycling Services Federal contract opportunity
- Solicitation number
- FA4419-13-T-0104
About this file
Comments from site visit dated August 1 2013.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4419-13-T-0104-0002.pdf | ||
| FA4419-13-T-0104-P0001.pdf | ||
| QUESTIONS_from_Recycle_site_visit_II.doc | DOC document | |
| Signed_PWS_Recycle_1.pdf | ||
| Wage_Determination.pdf | ||
| Solicitation_FA4419_13_T_0104.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comments From Recycle Site Visit
Recycle Solicitation:
· Keys to building 400 are provided by the Government. Duplicate keys cannot be made by the contractor. Additional keys will be issued upon request to the Contracting Officer Representative (COR). (PWS paragraph 3.1.1.)
· Sources for recycling shall be given to the company awarded the contract. If the list is available prior to solicitation close out, it will be posted separately from this information.
· The Government provides equipment for use at the recycle center. Minor maintenance of vehicles (such as cleaning, lubricating, etc.) shall be the responsibility of the contractor. (PWS paragraph 1.4.3.) Oil changes and other maintenance shall be coordinated with the COR. Maintenance of recycle specific equipment is the responsibility of the Government. The contractor shall report all need repairs to the COR. The list of equipment provided by the Government is in Appendix E of the PWS.
· Bulk metal bins for recycling are located in the yard at building 400. They are also located out by aircraft maintenance buildings. They may also be requested for temporary use at other locations around base. The truck provided will not support transport of these bulk bins. The forklift may be driven on base by an employee with a Government driver’s license (GDL). Proof of forklift training will be needed to add this equipment to the GDL. (PWS paragraph 1.4. inclusive)
· Recycle contractor shall share the use of the office and yard area of building 400 with the refuse contractor. (PWS paragraph 3.1.)
File details come from the government source that posted it. Updated .