Rubber Flooring Questions and Answers.pdf

PDF 51 KB Posted

Attached to
Rubber Flooring Coating Federal contract opportunity
Solicitation number
FA441820Q0015
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Rubber Flooring Coating, newest first.
File Type Posted
Floor Plan for Rubber Flooring.pdf PDF
RFQ Rubber Flooring REV 22 Jun 20.pdf PDF
SOW rubber flooring 22 June 20.pdf PDF
FA441820Q0015 Amendment 01.docx DOCX document
Rubber Flooring Q and A.pdf PDF
RFQ Rubber Flooring Installation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Quote

Rubber Flooring Installation Solicitation FA441820Q0015

Contractor Questions 03 June 2020

1. What is the facility currently being used for/what will it be used for when complete?

Building was just renovated. The space the flooring is going into will be a wheel and tire shop.

2. What is the age of the subfloor?

Unknown.

3. What type of floor covering is on the floor now?

There is no floor covering currently.

4. Will contractor be responsible for moving any items (furniture/machinery/refuse) off of the floor prior to beginning demo/prep work?

No.

5. Are there any access restrictions for the building where work will be done?

No.

6. On the quotation form that was in the attachments on the beta sam website under supplies/services it says Prepare and Coat 6400 sq ft of floor with 1/3-inch-thick polyurethane (Rubber Floor Coating) (IAW Specification Sheet). I was not able to find a separate attachment identified as a specification sheet. Will this document (specification sheet) be provided so that all contractors are aware of what type of product the Government is requesting (there are many types of polyurethane floor coverings)?

Only requirement we have is that the floor be solid 1/3in min rubber flooring.

7. Are there any known moisture issues with the subfloor? Will any moisture testing be required prior to installing polyurethane coating?

No issues currently known at this time. No moisture test required by us.

8. Is there a site visit scheduled for this project for all contractors to verify existing conditions?

Not at this time.