FA3099-16-T-0010-A00003.pdf

PDF 88 KB Posted

Attached to
Upgrade Door Locks Federal contract opportunity
Solicitation number
FA3099-16-T-0010
Issued by
Department of the Air Force Air Education and Training Command

About this file

FA3099-16-T-0010-A0003

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Door Locks, newest first.
File Type Posted
Amendment_A00003_SOO.pdf PDF
Attachment_2 _Updated_SOO.pdf PDF
Amendment_A00002.pdf PDF
Attachment_1_Updated_Current_Door_Locks.pdf PDF
Attachment_1_Current_Door_Locks.pdf PDF
FA3099-16-T-0001-A00001.pdf PDF
Attachment_1 _SOO.pdf PDF
FA3099-16-T-0010 _Upgrade_Door_Locks.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3099-16-T-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT A00003

Amendment A00003

The purpose of this amendment is to:

a. Correct the total number of locks in the Statement of Objectives and Extended Description from 404 locks to 448 locks.

b. Specify the number of mortise/cylindrical locks, type of door, and length of backset currently in place per building as follows:

Building 256: 77 mortise locks, 31 cylindrical, metal door, 2 3/4” backset

Building 446: 56 mortise locks, 0 cylindrical, metal door, 2 3/4" backset

Building 449: 0 mortise, 120 cylindrical, metal door, 2 3/4" backset

Building 450: 0 mortise, 80 cylindrical, metal door, 2 3/4" backset

Buildings 9200A through 9220B: 0 mortise, 84 cylindrical, wooden door, 2 3/8” backset

c. Address some clarifying questions posed from different vendors as follows:

1. Laydown/assembly area will be provided to the contractor.

2. Programming/software and training the Government is the contractor’s responsibility.

3. Retrofitting/deadbolts is/are not required, the locks requested should cover any holes from existing locks/deadbolts upon installation.

4. A door handle is requested instead of a doorknob.

5. An override/master key is required.

d. Move the RFQ Close date to Thursday, 22 Sep 16 @ 1200 CST.

All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Sep-2016 12:00 PM to 22-Sep-2016 12:00 PM.

SUPPLIES OR SERVICES AND PRICES

FA3099-16-T-0010

CLIN 0001

The CLIN extended description has changed from:

Remove existing door locks (reference examples as shown in attachment 1) with hardware on Laughlin AFB's Dormitories and Unaccompanied Housing and install 404 new cypher locking hardware IAW the attached statement of objectives (SOO).

To:

Remove existing door locks (reference examples as shown in attachment 1) with hardware on Laughlin AFB's Dormitories and Unaccompanied Housing and install 448 new cypher locking hardware IAW the attached statement of objectives (SOO)..

(End of Summary of Changes)

File details come from the government source that posted it. Updated .