schedule of material submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| Attachment_4_-_Davis_Bacon_Wage_Determination_TX150280_21_Aug_2015.pdf | ||
| Attachment_1_-_SOW _10_Aug_2015.pdf | ||
| pd_RFP.pdf | ||
| Attachment_5_-_AETC_Form_47 _16_Apr_2015.pdf | ||
| Attachment_2_-_Bid_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66
| PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NUMBER: | |
| SCHEDULE OF MATERIAL SUBMITTALS |
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||
| NUMBER OF COPIES REQUIRED | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, |
CONTRACT REFERENCE, TYPE OF
| SUBMITTAL | CERTIFICATION OF | |||
| COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S |
| RECOMMENDATIONS | MANUFACTURER'S | |||
| WARRANTY | CATALOG DATA | OPERATING | ||
| INSTRUCTIONS | DOCUMENT | REQUIRED SUBMISSION | ||
| DATE | DATE RECEIVED IN | |||
| CONTRACTING | DATE TO CIVIL | |||
| ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE |
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DIS- |
APPROVED
| 1 | Design Submittals - Hard Copies 95% (SOW Ref) | 3 | ||||||
| 2 | Design Submittals -CD/DVD 95% (SOW Ref) | 3 | ||||||
| 3 | Design Submittals - Hard Copies 100% (SOW Ref) | 3 | ||||||
| 4 | Design Submittals -CD/DVD 100% (SOW Ref) | 3 | ||||||
| 5 | Hazardous Material Inventory & Monthly Usage Report | 3 | ||||||
| 6 | Inventory of the chemicals that will be used and corresponding Safety Data Sheets | 3 | ||||||
| 7 | Permits | 3 | ||||||
| 8 | Activity Hazard Analysis (AHA) | 3 | ||||||
| 9 | Safety Plan (SOW Ref) | 3 | ||||||
| 10 | Quality Control Plan | 3 | ||||||
| 11 | Material Listing | 3 | ||||||
| 12 | Operation and Maintenance Data (including closeout material submittals warranty) | 3 | ||||||
| 13 | Construction Site Maintenance | 3 | ||||||
| 14 | Noise Control | 3 | ||||||
| 15 | Accident Prevention Plan (APP) | 3 | ||||||
| 16 | Hot Work Permit | 3 | ||||||
| 17 | Shop Drawings | 3 | ||||||
| 18 | Product Data | 3 | ||||||
| 19 | Test Reports | 3 | ||||||
| 20 | SWPPP (SOW Ref) | 3 | ||||||
| 21 | DD 1354 (SOW Ref) | 3 | ||||||
| 22 | Warranty Letters (SOW Ref) | 3 | ||||||
| 23 | As-Built Drawings (SOW Ref) | 3 | ||||||
| 24 | Demolition Plan (SOW Ref) | 3 | ||||||
| 25 | Waste Manifests (SOW Ref) | 3 | ||||||
| 26 | Lead Based Paint Abatement Plan (SOW Ref) | 3 | ||||||
| 27 | Division 1 (SOW Ref) | 3 | ||||||
| 28 | Division 3 Concrete (SOW Ref) | 3 | ||||||
| 29 | Division 5 Metals (SOW Ref) | 3 | ||||||
| 30 | ||||||||
| 31 | ||||||||
| 32 | ||||||||
| 33 | ||||||||
| 34 | ||||||||
| 35 | ||||||||
| 36 | ||||||||
| 37 | ||||||||
| 38 | ||||||||
| 39 | ||||||||
| 40 | ||||||||
| 41 | ||||||||
| 42 | ||||||||
| 43 | ||||||||
| 44 | ||||||||
| 45 | ||||||||
| 46 | ||||||||
| 47 | ||||||||
| 48 | ||||||||
| 49 | ||||||||
| 50 | ||||||||
| 51 | ||||||||
| 52 | ||||||||
| 53 | ||||||||
| 54 | ||||||||
| 55 |
&"Times New Roman,Regular"&8Attachment 3 - Schedule of Material Submittals &"Times New Roman,Regular"&8FA3047-15-R-0076 &"Times New Roman,Regular"&8 14 Jun 2015
&"Times New Roman,Regular"&8ITEMS LISTED ARE NOT ALL INCLUSIVE