Questions and Answers 1.pdf

PDF 46 KB Posted

Attached to
Hazmat Trainer Federal contract opportunity
Solicitation number
FA3030-F1Z503005AW02
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains questions and answers regarding a federal contract solicitation for a modular HAZMAT trainer. The solicitation requires a contractor to provide all personnel, equipment, tools, materials, transportation, labor, and supervision necessary to build and install a two-story modular HAZMAT trainer, including attaching it to an existing concrete pad. The questions clarify that the original conceptual drawings included with Attachment 1 were incorrect, and have been replaced with a new conceptual drawing provided as Attachment 3. Dimensions and room layouts differed between the original Attachment 1 and Attachment 3. The responses indicate the contractor should refer to Attachment 3 for accurate specifications. The solicitation was issued by the Department of the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to Hazmat Trainer, newest first.
File Type Posted
Attachment 1 - Basic Course HazMat SOW Rev 1 29 July 2020.pdf PDF
Questions and Answers 2.pdf PDF
Attachment 3 - Basic HazMat Trainer Concept Drawing.pdf PDF
Combo Conformed Amendment 0001.pdf PDF
Attachment 2 - Basic Course Trainer Evaluation Criteria.pdf PDF
Attachment 1 - Basic Course HazMat SOW.pdf PDF
Combo.pdf PDF
Attachment 3 - Facility Drawing B.XLSX XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers #1 17 July 2020

FA3030-F1Z503005AW02

Q1. Attachment 1, item 11 b. states that the trainer is to be 40’ long by 24’ wide. Attachment 3 shows the trainer as 60’ long x 24’ wide A1. The original attachment 1 was included in error. A new conceptual drawing has been posted as attachment 3

Q2. Attachment 1, item 11 b. states that the trainer is to be a single story, with a partial second floor.

Attachment 3 shows a 3-level unit.

A1. The original attachment 1 was included in error. A new conceptual drawing has been posted as attachment 3

Q3. Attachment 1, item 11 b (1) states that Room 1 is to be a 24’ x 20’ open area. Attachment 3 does not show any room with those dimensions.

Q4. Attachment 1, item 11 b (2) states that Room 2 is to be a 10’ x 20’ area. Attachment 3 does not show any room with those dimensions.

Q5. Attachment 1, item 11 b (3) states that Room 3 is to be a 10’ x 20’ area. Attachment 3 does not show any room with those dimensions.

Q6. Attachment 1, item 11 b (4) states that the Observation Deck is to be a 40’ x 24’ area.

Attachment 3 does not show any space with those dimensions.

A1. These dimensions are incorrect the correct dimensions for the Observation Deck should be 20’ x 24’