Attachment 2 - Basic Course Trainer Evaluation Criteria.pdf
PDF 327 KB Posted
- Attached to
- Hazmat Trainer Federal contract opportunity
- Solicitation number
- FA3030-F1Z503005AW02
About this file
This document outlines requirements for the construction of a two-story modular HAZMAT trainer for the Department of the Air Force Air Education and Training Command. The contractor shall provide all personnel, equipment, materials, transportation, and supervision to build and install the trainer attached to an existing concrete pad. The contractor must submit proof of completing similar projects, a detailed floor plan, and drawings showing electrical work, HVAC systems, stairs, windows, doors, standpipe connections, drains, and safety railings. The narrative must include details on construction materials, electrical components, doors and windows, structure anchoring, and applicable NFPA codes. The solicitation number is FA3030-F1Z503005AW02 and bids are due by the date specified in the opportunity description.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Basic Course HazMat SOW Rev 1 29 July 2020.pdf | ||
| Questions and Answers 2.pdf | ||
| Questions and Answers 1.pdf | ||
| Attachment 3 - Basic HazMat Trainer Concept Drawing.pdf | ||
| Combo Conformed Amendment 0001.pdf | ||
| Attachment 1 - Basic Course HazMat SOW.pdf | ||
| Combo.pdf | ||
| Attachment 3 - Facility Drawing B.XLSX | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Competency
Provide proof of completion of projects of this magnitude
Floor Plan
Detailed drawing of the proposed trainer to include but not limited to;
Electrical work to include power extension.
Electrical panel
Grounding
Light switches
Light locations
Electrical Outlets
HVAC system
Stairway
Windows, all exterior windows will be weatherproof
Doors (include swing), all exterior doors will be weatherproof
Standpipe connection
Drains
Safety railings/kick plates
Basic Course HazMat Trainer Evaluation Criteria
Narrative
Narrative shall include but not be limited to;
Type of construction
Wall coverings
Floor coverings
Electrical including type of light fixtures, outlets, electrical panel, how power will be extended to the structure.
Doors, including hardware and type of seals
Windows including hardware and type of seals
Structure anchoring solution.
Stairway type and length of run
Standpipe connection
Drainage
Applicable NFPA Codes
NFPA 70 – National Electrical Codes
NFPA 1001 Life Safety
File details come from the government source that posted it. Updated .