Questions and Answers.doc

DOC document 23 KB Posted

Attached to
Data Center Power Audit Federal contract opportunity
Solicitation number
FA3030-11-T-0049
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Data Center Power Audit, newest first.
File Type Posted
Questions and Answers.doc DOC document
Mantenance Schedule.xlsx XLSX spreadsheet
one-line 523.PDF PDF
one-line 519.PDF PDF
01 Amendment.pdf PDF
FA3030-11-T-0049.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for FA3030-11-T-0049 Q1- What is the gross area of building (sq. ft.)?

A1- 519= 108,379sq ft & 523= 75,882sq ft Q2- Is the building multi-function, or critical space/data center operation only?

A2-Both 519 & 523 buildings are multi-functional, however, the electrical audit is only required for the critical area and the equipment only services the critical area.

Q3-Number and size(s) of UPS(s) serving the building (or critical space)?

A3-Please see the attached Maintenance Schedule for the number and size of all equipment including the UPS Q4- What are the quantities of cabinets?

A4-IT load cabinets for 519= 20 & 523= 60

Q5-What is the size of the generator serving the building?

A5-519= 300KW & 523= 750KW

Q6-SCOPE OF WORK: Does the Base have Items 4.b.i., ii. and iii, and will these documents and studies be available to WTA?

A6-See the attached on-line diagram for 4.b.i but ii, and iii are unavailable at this time.

Q7-Do current record drawings for the building exist and will these drawings be available to WTA?

A7-Current records do not exist