Excavator_Rental_at_Columbus_Air_Force_Base_Q&A.pdf

PDF 9 KB Posted

Attached to
Excavator Rental_Columbus Air Force Base, MS Federal contract opportunity
Solicitation number
FA3022-18-R-0016
Issued by
Department of the Air Force Air Education and Training Command

About this file

Questions and answers, dated 27 July 2018.

View the file

Other files for this federal contract opportunity

Other files attached to Excavator Rental_Columbus Air Force Base, MS, newest first.
File Type Posted
Attachment_2_-_Clauses_IBR.pdf PDF
Attachment_3_-_Statement_of_Need_27_June_2018.pdf PDF
COMBO.pdf PDF
Attachment_4_-_Wage_Determination.pdf PDF
Attachment_1_-_Pricing_Schedule.pdf PDF
Combo_FBO.pdf PDF
3_Statement_of_Need_29_May_18.pdf PDF
2_Clauses_IBR.pdf PDF
1_Pricing_Schedule.pdf PDF
4_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Excavator Rental at Columbus Air Force Base, MS

FA3022-18-R-0016

Questions and Answers 27 July 2018

1. Are pictures of the two building available?

- No, pictures are not available

2. Are the buildings on a slab?

- Yes

2a. If so, will the slab be part of the disposal?

- Yes, the slabs will be broken apart and placed into the appropriate piles.

2b. Do you know how thick the slab is?

- Both are 6". One contains steel reinforcement, but do not know what type. (either mesh or rebar)

3. What is the roof type?

- One roof is standing metal seam, the other is reinforced lightweight concrete.

3a. Metal or shingles?

- One is metal, the other is concrete as stated above.

3b. What is the exterior of the building, brick, wood, block?

- Exterior of both buildings are block.

3. Will the debris be separated into separate piles or all just one big pile?

- The debris will be sorted prior to it being pick up and disposed of. To the greatest extent possible, the government will be disposing of the metal via on-site recycling, which will not be a part of the contractor's scope here. The contractor shall have no part in the metal recycling portion.