This document is a solicitation amendment for prefabricated storage buildings at Brooke Army Medical Center in San Antonio, Texas. The Air Force is seeking quotes by June 9, 2023 for the design, fabrication, delivery and installation of two prefabricated buildings to replace existing storage units, one to house radioactive waste and the other hazardous materials. The buildings must each maintain interior temperatures between 68-76 degrees Fahrenheit with HVAC systems. The radioactive storage building requires a steel floor with R8.4 insulation and roll up door access, while the hazardous materials building consists of four bays with grating and spill containment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 3 - SOW BAMC Prefabricated Bldgs Official Release 30 May 23.pdf | ||
| SF30 Amendment 001 - FA301623U0055 BAMC Prefabricated Bldgs Official Release.pdf | ||
| Atch 4 - FA301623U0055 - Site Visit Sign-in Sheet.pdf | ||
| Atch 3 - SOW BAMC Prefabricated Bldgs Official Release 23 May 23.pdf | ||
| Atch 2 - Schedule of Supplies BAMC Prefabricated Bldgs Official Release.xlsx | XLSX spreadsheet | |
| Atch 3 - SOW BAMC Prefabricated Bldgs Official Release 16 Feb 23.pdf | ||
| Atch 1 - Clauses and Provisions Official Release.pdf | ||
| FA301623U0055_BAMC Prefabricated Bldg Official Release.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
002 31 May 2023
1 10
FA3016
502 CONS / JBKBA
395 B STREET WEST, SUITE 2, BLDG 224
JBSA RANDOLPH AFB TX 78150-4525
SEE BLOCK 6
FA3016
RFQ FA301623U0055
9B. DATED (SEE ITEM 11)
9 May 2023
X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to make the following changes:
(1) Extend the RFQ closing date to 9 June 2023 at 4PM Central Time (CT).
(2) Address industry generated questions. See continuation page for further details.
(3) Incorporate revised Statement of Work dated 30 May 2023 (Atch 3).
POC: Nicole Harden, 706-829-9459, nicole.harden.1@us.af.mil
X
RFQ No. FA301623U0055 Amendment No. 002 Block 14 Continuation Page
Industry Generated Questions and Answers (2) BAMC Prefabricated Buildings
Question 6
The SOW states that the “Contractor shall. . . remove two (2) existing prefabricated storage units.” Our understanding is that these existing storage units have been used to store hazardous and possibly radioactive materials. At the site visit, the Government indicated that they would “remove the contents and decontaminate” the buildings prior to Contractor removal. Please confirm that the Government will remove all hazardous/radioactive contents from existing storage units prior to Contractor removal.
Answer 6
Yes. Reference revised SOW dated 30 May 23, page 1 number 2 Description of Requirement.
Question 7
Please confirm that the Government will decontaminate the existing storage units prior to Contractor removal.
Answer 7
Reference Answer 6.
Question 8
Please confirm that the Government will perform necessary testing of the existing storage units after content removal and decontamination AND provide test results to the Contractor prior to removal.
Answer 8
Reference Answer 6.
Question 9
Please confirm that the disposal of the existing storage units will not be treated as hazardous material disposal.
Answer 9
Yes.
Question 10
Will the Government (environmental) require the Contractor to dispose of the existing containers at a TCEQ licensed landfill?
Answer 10
Disposal shall be IAW 32 CFR 273.7 Excess DoD property and scrap disposal processing.
(Updated as of May 2023). Reference revised SOW dated 30 May 23, page 1 number 2 Description of Requirement.
Question 11
SOW paragraph 2 states that the Contractor shall provide a “Certificate of Destruction” after disposal. Is this a Government process or standard form? Please provide clarification of what a “Certificate of Destruction” is and where to obtain.
Answer 11
Reference Answer 10.
Question 12
Are the new storage facilities required to be National Recognized Testing Laboratory (NRTL) certified?
Answer 12
All devices, systems, and components shall meet/ exceed OSHA NRTL standards as applicable.
Question 13
Are the new storage facilities required to be FM Global approved?
Answer 13
Reference Answer 12.
Question 14
This work is highly specialized. Is there a list of approved design and fabrication vendors the Government can provide?
Answer 14
No.
Question 15
This work is highly specialized. Is there a list of approved installers the Government can provide, or is this dependent on the designer/fabricator?
Answer 15
No.
Question 16
In discussing this project with the design and fabrication vendor familiar with this project, they indicated that they require the new units to be installed by a “certified” installer. Please confirm.
Answer 16
The Government cannot confirm that particular fabrication vendor’s requirement.
Question 17
Vendors have indicated that pricing for these types of storage units can only be held for 30 days.
The solicitation does not identify how long contractors are required to hold price after submission of bid. Please advise on how long Contractors will be required to hold their bid price.
Answer 17
Under this Request for Quotation (RFQ), the Government is requesting vendors to hold pricing for at least 30-60 days.
Question 18
Can the Government provide a Rough Order of Magnitude (ROM) for this solicitation?
Answer 18
No.
Question 19
Can the Government provide a Period of Performance (POP) for this solicitation?
Answer 19
Reference Atch 2 – Schedule of Supplies. Vendors are required to input the number of calendar days in order to complete the project after receipt of order (ARO).
Question 20
The SOW indicates that the “contractor shall ready old storage units for removal - disarm fire suppression system, disable power, and remove connections, remove overhanging AC, lights, or other components for transport, unbolt and separate modular units, and remove anchors.” During the site visit the Government indicated that they would be responsible for “disarming the fire suppression system, disable power.” Please clarify what items listed above will be the Government responsibility to “ready old storage units for removal” and what will be the Contractor’s responsibility.
Answer 20
Reference revised SOW dated 30 May 23, page 1 number 2 Description of Requirement.
Question 21
SOW Appendix B states that “The facilities must be no less than 960 square feet of usable floor space.” The SOW goes on to state that the interior space for Building 1 is 38’-2” x 24’-2” and Building to is 38’-2” x 8’-2”. These dimensions result in square footages of 922.4 sf for Building 1 and 311.7 sf for Building 2. Please clarify what is meant by “no less than 960 square feet” and how this corresponds to the required interior dimensions of the buildings.
Answer 21
Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for unit size and allowable variance.
Question 22
Appendix B states Building 2 should have a leak proof spill containment sump. In the existing building, the spill containment sump was just a depression in the floor space with grating installed as the actual floor. Please confirm this is the requirement and not some type of sump pump type system.
Answer 22
Yes. Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit II.
Question 23
SOW Appendix B indicates a specific list of structural, electrical, fire suppression, life safety, architectural, and mechanical design requirements (no communications, plumbing, or fire alarm requirements are indicated). The SOW makes no mention of licensed, professional design services; however, our experience indicates that governing laws require professional design responsibility to ensure code compliance and life safety concerns are addressed. Please confirm that the design of the new storage buildings require licensed professional design drawings and/or calculations to meet the listed Government design requirements.
Answer 23
Yes.
Question 24
SOW Appendix B states “Facilities will be using in-house contractors to provide an electrical disconnect switch at the site for the storage units. Once the new units arrive, our contractors will make the connection to the units.” Based on this, it appears that the Contractor will not be responsible for any electrical work on site. Please confirm that the Contractor is not responsible for any electrical scope of work on site.
Answer 24
Contractor shall disconnect all electrical. Reference revised SOW dated 30 May 23, page 1 number 2 Description of Requirement.
Question 25
SOW Appendix B provides dimensions of “Radioactive Waste” that differ from the exterior and interior dimensions required for each building. Please clarify what the “Radioactive Waste” dimensions are and how they relate to the “interior” and “exterior” dimensions provided.
Answer 25
Reference Answer 21.
Question 26
SOW Appendix B states Building 1 requires a “manual roll-up garage door that is accessible by forklift or other pallet convenience devices.” Earlier in Appendix B, the SOW states Building 1 interior dimension (assumed to be ceiling height” is to be 8-foot. Please clarify the minimum required size of the “manual roll-up garage door” to accommodate expected fork-lift or pallet jack usage.
Answer 26
Reference Answer 21.
Question 27
It appears that the new storage units finish floor elevation will be higher than the existing concrete slab. The height of the required floor structure is not listed in the SOW. Will the Government require ramps into all doors? If so, are these required to be concrete or steel?
Answer 27
Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit I – Radioactive Decay-In-Storage, and Unit II – 90-Day Hazardous Waste.
Question 28
SOW Appendix B states that Building 2 must be a 4-bay storage facility. Please indicate the minimum width and height of storage bay doors.
Answer 28
Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit II.
Question 29
SOW Appendix B states that Building 2 must have “grating and leak proof spill-containment sump.” Please provide minimum required layout and square footage of grating (width, length, location).
Answer 29
Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit II.
Question 30
SOW Appendix B states that “Building 1 shall have R8.4 insulation in the floor, protected by a steel liner.” Is the steel liner required to be installed below the insulation or above the insulation?
Answer 30
Yes. Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit I.
Question 31
SOW Appendix B states that “Building 1 shall have 8.4 insulation in the floor, protected by a steel liner.” Please provide minimum requirements of the steel liner including thickness and grade.
Answer 31
Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit I. The Contractor shall be responsible to ensure that the steel floor is structurally sound and suitable for normal storage operations of medical waste.
Question 32
SOW Appendix B states that “Buildings need to be insulated specified to IEC standards to at least R value R-12 (mineral fiber in wall cavity).” Does the minimum R-12 insulation requirement apply to the floor and roof or just the walls of both buildings?
Answer 32
The walls of both buildings.
Question 33
SOW Appendix B states that “Building 1 must have a steel and skid proof floor made of the highest-grade American steel.” Please confirm if A36 steel is sufficient.
Answer 33
Yes. Reference revised SOW dated 30 May 23, Appendix B Salient Characteristics for Unit I.
Question 34
SOW Appendix B states that each storage unit must maintain “an internal temperature of 68-76 degrees Fahrenheit.” This infers that an HVAC system must be included with each building.
Please confirm that the Government is requiring an HVAC system for each building and clarify required type of system.
Answer 34
Yes. An HVAC system is required for each unit. A system of the type that is able to sustainably maintain the temperatures so listed and one which prevents extreme cold/ freezing during the winter. The system brand and specifics would depend on the contractor’s choice of design given the layout and square footage.
Question 35
SOW Appendix B indicates a requirement for power for “a freezer for waste that may contain food or bodily fluids.” Does the Government have a requirement for emergency power, or a source of emergency power, in case power for this freezer is lost?
Answer 35
No.
Question 36
SOW Appendix B indicates each facility should have “task lighting for administrative duties such as hand entering information into logbooks, typing on computer keyboard, and reading instrumentation displays.” It goes on to state facilities must have suitable entry and egress paths/openings. Will the Government provide expected occupancy of each building and the hours in which those occupants are expected to be within the buildings?
Answer 36
No.
Question 37
Due to the quantity of questions and the coordination that will be necessary with building suppliers we are requesting a minimum of five (5) business days for bid submission after the date that Q&A are answered so that responses can be coordinated into our proposal. Please advise on a bid extension.
Answer 37
Yes, reference Amendment 002, the RFQ will be extended until 9 Jun 2023 at 4PM CT.
Question 38
What specific hazardous materials will be stored in each facility?
Answer 38
Unit I – Various Radioisotopes Unit II- alcohols, phenols, alkaloids, nitrates, formalin, and other toxic, flammable and volatile mixes/ combinations typical with large medical center operations.
Question 39
What is the hazard class of each of the hazardous materials to be stored in the units?
Answer 39
Health Hazard Classes range from Acute toxicity- Aspiration toxicity; Physical Hazard Classes range from Flammable liquids to Corrosive substances, and Health Hazards range from Acute to Aspiration toxicity. Detailed Material Data Sheets are available if required.
Question 40
What is the method of store of the hazardous materials? (55 gallon drums, 5 gallon pails, boxes, bottles, cylinders, pallets, etc.)
Answer 40
All mentioned (Variable containment methods).
Question 41
What quantity of each hazardous material will be stored in each unit?
Answer 41
Unknown.
Question 42
Please confirm if prefabricated chemical storage buildings are required for code compliance and that modified shipping containers would not acceptable since they are not NRTL (Nationally Recognized Testing Lab) Certified as required for chemical storage code compliance specifically to store radioactive and hazardous waste, as described in the SOW provided in the solicitation. A shipping container cannot be modified to meet a FM Approval label as required for DOD projects.
Answer 42
Reference Answer 12.
Question 43
Please confirm the temperature required to maintain for both building since HVAC was not discussed and will be required for code compliance.
Answer 43
Reference Answer 34.
Question 44
Is it possible for the bid to be extended if the questions are not answered prior to the deadline as it greatly impacts the scope and cost of the project?
Answer 44
Reference Answer 37.
| RFQ FA301623U0055 BAMC Prefab Bldgs_Industry Generated Questions and Answers (2) Amend 002 |
| SF30 Amendment 002 |
| SF30 Amendment 002 - FA301623U0055 BAMC Prefabricated Bldgs Official Release |
File details come from the government source that posted it. Updated .