Attachment_1_SOW_BeaverFit_Medina_Training_Outdoor_Custom_Project.pdf
PDF 110 KB Posted
- Attached to
- BeaverFit Medina Outdoor Training Project Federal contract opportunity
- Solicitation number
- FA301619U0226
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ__FA301619U0226_BeaverFit_Lockers_Medina_Base_Outdoor_Project_-_Amendment_1.pdf | ||
| Attachment_1_SOW_BeaverFit_Medina_Training_Outdoor_Custom_Project_Amendment_1.pdf | ||
| Q&As_for_RFQ_FA301619U0226.pdf | ||
| RFQ__FA301619U0226_BeaverFit_Lockers_Medina_Base_Outdoor_Project.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
BeaverFit Training Outdoor Custom Project
Medina Base Gym Joint Base San Antonio – Lackland
1. PROJECT SCOPE: The contractor shall furnish all supervision; labor, transportation materials, tools, incidentals, equipment, and quality assurance for the set up and installation of BeaverFit Training Outdoor Custom Project at the Medina Base Gym, located at 115 Medina Base Road, Bldg 199, JBSA Lackland, TX 78227.
2. PROJECT DESCRIPTION: The requirements of this project are but not limited to the following: The immediate perimeter surrounding the installation site shall be cordoned off to prevent patron traffic during the install. The Contractor shall provide barriers and signs to prevent unauthorized personnel from entering the installation area while the contractors are installing the BeaverFit Training Outdoor Custom Project.
Coordination for this effort shall be implemented with the Government Representative, Mr. Doug Price 210-671-2632.
3. GENERAL: All required tools, parts, materials and any other associated supplies required to fully implement the installation shall be supplied by the Contractor and should be on hand before beginning work. The Contractor shall furnish and maintain adequate barricades, and warning signs on the installation site (refer to paragraph 2).
4. HOURS OF WORK: Normal duty hours are from 7:00 a.m. to 5:00 p.m. Monday thru Friday, excluding weekends and observed Federal holidays and AETC observed family days. Contractor should coordinate work schedule with the Government Representative prior to implementation. No work shall be performed until this coordination has been implemented and coordinated.
5. PERIOD OF PERFORMANCE: Project should be completed within 180 calendar days of agreed upon start date.
6. INSTALLATION: The Contractor shall set up and install the BeaverFit Training Outdoor Custom Project in accordance to manufactures specifications.
7. CLEAN-UP: At the end of the work day, the Contractor shall clean up the work site by removing of all debris. Clean up of the work site shall include the installation area(s), stage area(s), parking and eating area(s) and any other area(s), affected by the installation process. All Contractor generated refuse and waste shall be stored in a waste container provided by the Government. Refuse disposal shall comply with the current disposal environmental requirements. The installation site shall be kept neat, orderly and safe for workmen at all times.
8. GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity), emergency, fire, and security police response if needed.
9. TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks.
Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX.
10. CONTRACTOR’S WARRANTY: The contractor shall provide a minimum of a 10-year warranty on the functional training rigging and a minimum of one year warranty on the accessories.
11. INSPECTION AND ACCEPTANCE: A representative from the Fitness and Sports staff will have oversight on this project and conduct a final inspection of completed work. All discrepancies identified during inspections shall be corrected prior to final payment.
12. LOCKER SPECIFICATIONS:
The BeaverFit Training Medina Outdoor Custom Project is 2 x standard CONEX shipping containers, custom-‐fabricated to anchor a BeaverFit training rig and store the equipment necessary to create a world class, multi-‐‐ modality training center for up to 100 people. Each container will feature 2 x garage-style roll-up doors.
External Rig Characteristics.
• 40+ x external pull-‐up stations
• 8 x squat stations
• 4 x dip bar attachment
• 4 x jump platform
• 4 x grappler attachment
• 8 x wall ball target
• 4 x safety squat arm set
• 8 x j-cups set
• 1 x SunPro Shade Structure spanning between containers. Approx. 50’L x 40’W.
Included Equipment. The BeaverFit Training Locker 40’ includes the following items:
• 6 x Battling Rope
• 4 x Climbing Ropes
• 11 x medicine balls (4 x 14lb, 2 x 16lb, 5 x 20lb)
• 24 x Kettlebells (4 x 12kg, 6 x 16kg, 4 x 20kg, 6 x 24kg
• 4 x Utility Bench
• 3 x Gymnastic Ring Sets
• 8 x Foam Roller
• 8 x Lacrosse Ball
• 1 x Toolbox
• 12 x Olympic Lifting Bar (8 x 20kg and 4 x 15kg)
• 12 x Olympic Warm-up Bar
• 10 x Olympic Bumper Set (200lb per set)
• 12 x Collar Set
• 16 x Mobility Band (8 x Light and 8 x Heavy)
• 8 x Sand Bag
• 12 x Jump Rope
• 2 x Set of Agility Cones (20 per set)
• 6 x Chalk Bags
• 2 x Training Program Board
Critical Salient Characteristics:
• Thick Steel: Steel thickness of at least 3” x 3”, 11 gauge, with a minimum grade of S235 or A283C.
• Powder-Coated: Treated and powder coated via American standard ASTM D7803.
Primary color will be RAL 1016, with a secondary color of RAL 5005
• Waterproof
• Hot-‐‐dip galvanized to American Standard ASTM A 123/A 123M.
• Customized Internal Storage: The inside of the containers must have custom-‐ fabricated storage racks for the included multi-‐modality fitness equipment.
• (1) 50’L x 40’W SunPro Structure: Engineered to IBC standards and rated to meet
UFC 3-301-01 requirements for a 115mph wind load (Risk Cat II), 5psf Ground Snow Load. Hot Dip Galvanized Frame, Open Ended and Container mounted
END OF STATEMENT OF WORK
| STATEMENT OF WORK |
| BeaverFit Training Outdoor Custom Project |
| Medina Base Gym |
| Joint Base San Antonio – Lackland |
| 6. INSTALLATION: The Contractor shall set up and install the BeaverFit Training Outdoor Custom Project in accordance to manufactures specifications. |
| 10. CONTRACTOR’S WARRANTY: The contractor shall provide a minimum of a 10-year warranty on the functional training rigging and a minimum of one year warranty on the accessories. |
| 11. INSPECTION AND ACCEPTANCE: A representative from the Fitness and Sports staff will have oversight on this project and conduct a final inspection of completed work. All discrepancies identified during inspections shall be corrected prior to final p... |
| 12. LOCKER SPECIFICATIONS: |
| The BeaverFit Training Medina Outdoor Custom Project is 2 x standard CONEX shipping containers, custom-‐fabricated to anchor a BeaverFit training rig and store the equipment necessary to create a world class, multi-‐‐ modality training center for up t... |
| External Rig Characteristics. |
| 40+ x external pull-‐up stations |
| 8 x squat stations |
| 4 x dip bar attachment |
| 4 x jump platform |
| 4 x grappler attachment |
| 8 x wall ball target |
| 4 x safety squat arm set |
| 8 x j-cups set |
| 1 x SunPro Shade Structure spanning between containers. Approx. 50’L x 40’W. |
| Included Equipment. The BeaverFit Training Locker 40’ includes the following items: |
| 6 x Battling Rope |
| 4 x Climbing Ropes |
| 11 x medicine balls (4 x 14lb, 2 x 16lb, 5 x 20lb) |
| 24 x Kettlebells (4 x 12kg, 6 x 16kg, 4 x 20kg, 6 x 24kg |
| 4 x Utility Bench |
| 3 x Gymnastic Ring Sets |
| 8 x Foam Roller |
| 8 x Lacrosse Ball |
| 1 x Toolbox |
| 12 x Olympic Lifting Bar (8 x 20kg and 4 x 15kg) |
| 12 x Olympic Warm-up Bar |
| 10 x Olympic Bumper Set (200lb per set) |
| 12 x Collar Set |
| 16 x Mobility Band (8 x Light and 8 x Heavy) |
| 8 x Sand Bag |
| 12 x Jump Rope |
| 2 x Set of Agility Cones (20 per set) |
| 6 x Chalk Bags |
| 2 x Training Program Board |
| Critical Salient Characteristics: |
| Thick Steel: Steel thickness of at least 3” x 3”, 11 gauge, with a minimum grade of S235 or A283C. |
| Powder-Coated: Treated and powder coated via American standard ASTM D7803. Primary color will be RAL 1016, with a secondary color of RAL 5005 |
| Waterproof |
| Hot-‐‐dip galvanized to American Standard ASTM A 123/A 123M. |
| Customized Internal Storage: The inside of the containers must have custom-‐fabricated storage racks for the included multi-‐modality fitness equipment. |
| (1) 50’L x 40’W SunPro Structure: Engineered to IBC standards and rated to meet UFC 3-301-01 requirements for a 115mph wind load (Risk Cat II), 5psf Ground Snow Load. Hot Dip Galvanized Frame, Open Ended and Container mounted |