Amendment_1.docx
DOCX document 30 KB Posted
- Attached to
- Repair Switchboard Federal contract opportunity
- Solicitation number
- FA301618R0014
About this file
FA301618R00140001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA301618R0014_Amendment_4.docx | DOCX document | |
| RFI_Questions_and_Answers_-_11_Dec_17.pdf | ||
| Amendment_3.docx | DOCX document | |
| Attachment_2_SOW_Specification_29_NOV__17_-_REVISED.doc | DOC document | |
| Attachment_2_SOW_Specification_20_NOV__17_-_REVISED.DOCX | DOCX document | |
| Attachment_8_Drawings_20_NOV_17_-_REVISED.pdf | ||
| Amendment_2.docx | DOCX document | |
| Site_Visit_Sign_In_Sheet_(21_Nov_17).pdf | ||
| Site_Visit_Switchboard_U_SWB-U_Pictures.pdf | ||
| Attachment_2_Revised_SOW_Specification_15_NOV__17_-_REVISED.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301618R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Contractor shall furnish all materials, labor, and equipment required to Repair ISR COMM Switchboard in Substation 9, in Bldg. 2000 IAW the terms and conditions set forth in the attached SOW (dated 26 Oct 2017) and other attachments to this contract.
To:
Contractor shall furnish all materials, labor, and equipment required to Repair ISR COMM Switchboard in Substation 9, in Bldg. 2000 IAW the terms and conditions set forth in the attached SOW (Rev. 15 Nov 2017) and other attachments to this contract.
CLIN 0002
The CLIN extended description has changed from:
Design efforts to repair ISR Switchboard of Subsatation 9 at building 2000 on JBSA - Lackland IAW attached SOW (26 dated Oct 2017). Contractor shall complete and deliver 65%, 95% and 100% signed and sealed drawings.
To:
Design efforts to repair ISR Switchboard of Subsatation 9 at building 2000 on JBSA - Lackland IAW attached SOW (Rev. 15 Nov 2017). Contractor shall complete and deliver 65%, 95% and 100% signed and sealed drawings.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
TABLE OF CONTENTS
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 1 |
| Wage Determination |
| 8 |
| 08-SEP-2017 |
| Attachment 2 |
| Statement of Work Specs (SOW) |
| 128 |
| 15-NOV-2017 |
| Attachment 3 |
| DD 1354 |
| 3 |
| AUG-2013 |
| Attachment 4 |
| DD 1354 Checklist |
| 7 |
| N/A |
| Attachment 5 |
| Submittal Register |
| 5 |
| JAN 1996 |
| Attachment 6 |
| Project Signage Standard |
| 2 |
| SEP 2017 |
| Attachment 7 |
| JBSA Lackland Base Map |
| 2 |
| N/A |
| Attachment 8 |
| Drawings |
| 8 |
| N/A |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it.