Q_&_A_B_7460.pdf

PDF 157 KB Posted

Attached to
Replace Door Seals Federal contract opportunity
Solicitation number
FA301618B0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

Questions & Answers dated 27 Mar 18.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Door Seals, newest first.
File Type Posted
FA301618B0001_Amendment_1.pdf PDF
Attachment_1_Revised_Specs_(26_Mar_18).pdf PDF
Attachment_2_Wage_Determination.pdf PDF
Attachment_1_Specs..pdf PDF
Attachment_3_Schedule_of_Materials_Submittal.pdf PDF
FA301618B0001_Door_Seals_7460.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

502D AIR BASE WING

JOINT BASE SAN ANTONIO

MEMORANDUM FOR RECORD 27 Mar 18

SUBJECT: Questions & Answers- FA3016-18-B-0001, Replace Door Seals, Bldg. 7460, JBSA

Lackland, TX. Project Number: MPLS 15-0053

Question 1: Attachment 1 –The top right hand corner of all pages has a different solicitation number on them? The number on the right hand corner is the project number.

Question 2: Attachment 1, Section 08 71 00, Page 3, Paragraph 2.2.1-Weatherstripping

Gasketing Talks about ASTM E283 testing at each door, is this correct? The project data sheet needs to meet ASTM E283 (material submittal).

Question 3: Is there an addendum issued? No.

Question 4: May I know the exact site location or address? Address is in SOW section 01 11 00 under 1.2.4 “Location”.

Question 5: Do you have an engineer or design team for this? No.

Question 6: Are there any fire doors? Yes.

Question 7: Are there any double doors? No.

Question 8: Is there a floor plan showing all doors? Yes, floor plan will be provided to awardee.

Question 9: Are the spring hinges strong enough to close the doors with new weather stripping?

Section 01 11 00 Pg. 1, 1.2.1 Project Description, the installation of no more than 30 self-closing spring hinges, to replace hinges that may not work with the new weather seals/gaskets.

Question 10: Are there any thresholds that need to be replaced? No.

Question 11: Will an air leakage testing be required for each door after weather stripping is installed (Section 08 71 00, Pg. 3, 2.2.1 Weather-stripping Gasketing)? No.

Question 12: Is there an incumbent? No.

Question 13: If so, who are they and what was the winning bid, contract number and SOW?

N/A.