Atch_6_-_Government_Estimate_Breakdown-_Hanger_70_Basketball.pdf
PDF 106 KB Posted
- Attached to
- Renovate Hangar 70 Federal contract opportunity
- Solicitation number
- FA3016-17-R-0060
About this file
Attachment 6 - Government Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_1-_SOW_and__Specifications_-_20170509_Rev_2.pdf | ||
| FA3016-17-R-0060-0001_Signed.pdf | ||
| Atch_7-_Recovered_Material_Determination.pdf | ||
| FA3016-17-R-0060.pdf | ||
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document | |
| Atch_3_-_Base_Access_Request_Form.pdf | ||
| Atch_1-_SOW_and__Specifications_-_20170509_Rev_1.pdf | ||
| Atch_8_-_TYMX160173_09_HAZMAT_Letter_Atch8.pdf | ||
| Atch_2_Wage_Determination_2_June.pdf | ||
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITY UNIT TOTAL CREW
LABOR
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
1 01-11-31-30-0200 Engineering fees, electrical, minimum Contrct
2 01-11-31-30-1200 Engineering fees, structural, minimum Project
3 01-31-13-20-0100 Field personnel, field engineer, minimum Week
4 01-31-13-20-0180 Field personnel, project manager, minimum Week
5 01-54-33-40-0160-4 Rent per month for general equipment rental, without operators, aerial lift, scissor type, electric, to 25' high, 2000 lbs. capacity
Ea.
6 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemical
Ea.
7 01-74-13-20-0052 Cleaning up, cleanup of floor area, continuous, per day, during construction
M.S.F.
8 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job
M.S.F.
9 02-41-19-19-0725 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 20 C.Y.
capacity, 5 tons
Week
10 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes
Ea.
11 02-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizes
Ea.
12 02-82-13-39-0100 Asbestos remediation plans and methods, building survey commercial building
Ea.
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
RSMeans City, State CCI
General Construction Subtotal
General Construction Prime Contractor Overhead
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
General Construction Prime Contractor Bonding General Construction Contingency
TYMX160173
WORK LOCATION
CONTRACT FOR (Work to be performed) Remove Basketball Goal Supports & Replace Lighting
***ITEMS LISTED ARE NOT ALL INCLUSIVE****
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
RSMeans City, State CCI
General Construction Subtotal
General Construction Prime Contractor Overhead
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
General Construction Prime Contractor Bonding General Construction Contingency
13 02-82-13-39-0200 Asbestos remediation plans and methods, asbestos abatement remediation plan
Ea.
14 02-82-13-41-1750 Asbestos abatement equipment, equipment and supplies, buy, vacuum cleaner, HEPA, stainless steel, wet and dry, 16 gallon
Ea.
15 02-82-13-45-0100 OSHA testing, certified technician, minimum Day
16 02-82-13-45-0120 OSHA testing, industrial hygienist, minimum Day
17 02-82-13-45-0200 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, minimum Ea.
18 02-82-13-45-1100 OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400, minimum
Ea.
19 02-85-16-50-0560 Preparation of mold containment area, cover surfaces with polyethylene sheeting, including glue and tape, walls, each layer, 6 mil
S.F.
20 02-85-16-50-0900 Preparation of mold containment area, set up negative air machine, 1,000 to 2,000 CFM per 25 MCF volume
Ea.
21 02-85-33-50-0250 Demolition in mold contaminated area, ceiling, gypsum board S.F.
22 02-85-33-50-0410 Demolition in mold contaminated area, partitions, non load bearing, plaster, lath, and studs
S.F.
23 02-85-33-50-0450 Demolition in mold contaminated area, partitions, gypsum board and studs S.F.
24 02-85-33-50-0465 Demolition in mold contaminated area, partitions, carpet and pad Covers main floor and 2 offices
S.F.
25 02-85-33-50-0600 Demolition in mold contaminated area, pipe insulation, air cell type, up to 4" diameter pipe Covers insulation on existing HVAC tubing from Condenser to Air Handler.
L.F.
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
RSMeans City, State CCI
General Construction Subtotal
General Construction Prime Contractor Overhead
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
General Construction Prime Contractor Bonding General Construction Contingency
26 09-05-05-10-0200 Selective demolition, ceilings, ceiling, drywall, furred and nailed or screwed
S.F.
27 09-05-05-10-0240 Selective demolition, ceilings, ceiling, drywall, on suspension system, including system
S.F.
28 09-51-53-10-0900 Ceiling tile, stapled or cemented, 12" x 12" or 12" x 24", excluding furring, mineral fiber, fire rated, 3/4" thick, plain faced
S.F.
29 09-51-53-10-0900-4000 Ceiling tile, for ceiling cement, add (Modified using 09-51-53-10- 4000)
S.F.
30 09-91-23-74-0440 Walls and ceilings, interior, zero voc latex, concrete, dry wall or plaster, latex, paint one coat, smooth finish, roller
S.F.
31 09-91-23-74-0440-1800 Walls and ceilings, interior, zero VOC latex, for ceiling installations, add (Modified using 09-91-23-74-1800)
S.F.
32 09-91-23-74-0840 Walls and ceilings, interior, zero VOC latex, concrete, dry wall or plaster, latex, paint two coats, smooth finish, roller
S.F.
33 09-91-23-74-0840 Walls and ceilings, interior, zero VOC latex, concrete, dry wall or plaster, latex, paint two coats, smooth finish, roller
S.F.
34 09-91-23-74-0840-1800 Walls and ceilings, interior, zero VOC latex, for ceiling installations, add (Modified using 09-91-23-74-1800)
S.F.
35 09-91-23-74-0840-1800 Walls and ceilings, interior, zero VOC latex, for ceiling installations, add (Modified using 09-91-23-74-1800)
S.F.
36 13-05-05-35-0030 Selective demolition, hangars, circular type, prefabricated, steel frame, plastic skin, including foundation, 80' diameter
Total
37 23-05-05-10-0350 HVAC demolition, boilers, gas or oil, 160 thru 2000 MBH Ea.
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
RSMeans City, State CCI
General Construction Subtotal
General Construction Prime Contractor Overhead
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
General Construction Prime Contractor Bonding General Construction Contingency
38 23-05-05-10-0350-1200 Labor adjustment factors, add to labor for elevated installation, above floor level, 40' and higher (Modified using 22-01-02-20-1200)
Ea.
39 23-82-27-10-1090 Infrared type heating units, gas fired, vented, electric ignition, tubular, excluding piping and wiring, 20' to 80' lengths, single stage, input, 200 MBH
Ea.
40 23-82-27-10-1090-1200 Labor adjustment factors, add to labor for elevated installation, above floor level, 40' and higher (Modified using 22-01-02-20-1200)
Ea.
41 26-05-05-10-0200 Electrical demolition, conduit to 15' high, including fittings and hangers, electric metallic tubing (EMT), 1/2" to 1"
L.F.
42 26-05-05-10-0200-9960 Electrical demolition, add to labor for higher elevated installation, over 40' high, add (Modified using 26-05-05-10-9960)
L.F.
43 26-05-05-10-1640 Electrical demolition, pull boxes and cabinets, sheet metal, including removal of supports and conduit terminations, 6" x 6" x 4"
Ea.
44 26-05-05-10-1640-9960 Electrical demolition, add to labor for higher elevated installation, over 40' high, add (Modified using 26-05-05-10-9960)
Ea.
45 26-05-05-10-1840 Electrical demolition, wire, THW-THWN-THHN, removed from in place conduit, to 15' high, #12
C.L.F.
46 26-05-05-10-1840-9960 Electrical demolition, add to labor for higher elevated installation, over 40' high, add (Modified using 26-05-05-10-9960)
C.L.F.
47 26-05-05-50-4030 Electrical demolition, lighting, explosionproof, metal halide, 400 W Ea.
48 26-05-05-50-6030 Electrical demolition, lighting, ballast, lamps, high intensity discharge lamp, up to 400 W
Ea.
49 26-05-19-90-0960 Wire, 600 volt, copper type THWN-THHN, solid, #10 C.L.F.
50 26-05-33-14-0520 Conduit to 15' high, includes 11 couplings per 100', rigid galvanized steel, 3/4" diameter
L.F.
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
RSMeans City, State CCI
General Construction Subtotal
General Construction Prime Contractor Overhead
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
General Construction Prime Contractor Bonding General Construction Contingency
51 26-09-23-10-0250 Energy saving lighting devices, photoelectric control, single pole, single throw, (SPST) 120 volt
Ea.
52 26-27-26-20-0500 Wiring devices elements, toggle switch, quiet type, 1 pole, 20 amp Ea.
53 26-51-13-55-4000 Interior LED fixtures, including lamps, mounting hardware, and connections, high bay, surface mounted, round, 150 watts
Ea.