Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_Number_2.docx | DOCX document | |
| Picture_1.jpg | JPG image | |
| Q A_Number_1.docx | DOCX document | |
| Picture_2.jpg | JPG image | |
| Bldg_10904.PDF | ||
| Bldg_3885.PDF | ||
| Bldg_150.PDF | ||
| Bldg_5425.PDF | ||
| Bldg_950.PDF | ||
| Bldg_10902.PDF | ||
| Bldg_954.PDF | ||
| Bldg_10215.PDF | ||
| Bldg_10900.PDF | ||
| A15-_RFQ__FBO.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Purchase/Installation of LED Televisions in Buildings 150, 950, 954, 3885, 5425, 10215, 10900, 10902, and 10904
JBSA-Lackland AFB, TX.
25 Nov 2015
PERFROMANCE WORK STATEMENT
1 DESCRIPTION OF WORK
Work to be done: The work to be performed under this contract and in accordance with these contract documents shall consist of furnishing all necessary plant, labor and materials; and constructing, installing and performing all work shown and described in the contract documents, all of which are made a part thereof.
Project Location(s):
Rooms 103, 107, 108, 113, 115, 116, 118, 119, 121, 122, 123, 127, 128, and 129 (1 TV each room) in Bldg #150. (Total of 14 TVs)
Rooms 201A, 201B, 207A, 207B, 213, 212A, 212B (2 TVs each) and rooms 212A and 212B (1 TV each room) in Bldg #950 (see attachment for approximate location.) (Total of 16 TVs)
Classroom in Bldg #954 (2 TVs/see attachment for approximate location). (Total of 2 TVs)
Classrooms 118(1 TV) in Bldg #3885 (see attachment for approximate location). (Total of 1 TV)
Rooms SFAC 1, 2 and 3, BOC, CLC and the conference room (1 TV each room) in Bldg #5425 (see attachment for approximate location). (Total of 6 TVs)
Rooms 120, 122, 125, 127, 134, 225 and 227 of Bldg 10215 (1 TV ea/see attachment for approximate location). (Total of 7 TVs)
Rooms C112, C115, C122, C124, C126, C147, C149, C154, C156, C177, C180, S211, C217, C221, C232, C236, C245, C247, C264, C280, C285 (1 TV each room) in Bldg 10900 (see attachment for approximate location). (Total of 21 TVs)
Room T104 of Bldg 10902 (1 TV/see attachment for approximate location). (Total of 1 TV)
Rooms S017, S020, S021, S023, S025, S027, S030, S036, S038, S044, S068, S070, S080, S085, S090, S092, S097, S129, S134, S137, S142, S145, S163, S164, S168, S172, S185, S187 of Bldg 10904 (TV in each room/see attachment for approximate location). (Total of 28 TVs)
2 PRINCIPAL FEATURES
Work shall be done with the buildings occupied and the work areas unoccupied. The contractor shall coordinate all work with the occupants, the Project Manager/Inspector, the Contracting Officer Representative and/or Contracting Officer.
Description of Work: Provide design documents no later than five days after the award of the contract for all equipment associated with the installation and turnkey usage of all televisions in the aforementioned rooms. Installation will consist of providing services as described below:
a. Installation of 96 articulating brackets for the televisions to be mounted on the walls at a height for entire room to see. See attachment for desired locations of the televisions. Removal of existing Smartboards will be required. After existing Smartboards are removed, they are to be turned over to the applicable Facility Manager for Air Force disposition.
· Specifications of brackets will be as follows:
· All weather wall mount that features a rust-resistant coating and stainless steel hardware.
· Arm assembly shifts left and right on the wall plate for perfect positioning.
· Cable channels to conceal and protect cables, even through elbow – without inhibiting movement.
· Strong dual arms allow even the largest TVs to extend, retract, tilt, and swivel up to 20” from the wall with ease
· Universal mounting brackets.
· Effortless tilting
b. Install LED televisions (see attachment) and the specifications of the televisions will be as follows:
· 80" (79-1/2” Diagonal) Screen Size
· Ability to turn off wifi
· 120 Hz
· 1920 x 1080 (x4 sub-pixels) Pixel Resolution
· Viewing Angles 176º H / 176º V
· Dynamic Contrast Ratio: 4,000,000:1
· Aspect Ratio: 16:9
· Smart TV
· Surround Sound
· Digital Still Picture Display
· USB Input: 2
· HD Component
· Composite Video: 2
· Audio Inputs (L/R): 2
· PC: 1
· Ethernet Input: 1
· Digital Audio: Optical
· Power Consumption AC (watts) 200W
· Power Source: 120V
c. Install all required mechanisms, wiring/cabling, and products required for full employment of the aforementioned television as a classroom monitor. Cabling should be installed neatly, out of view when possible, and not produce any avoidable safety hazards. Work will include a three year warranty on parts, labor, and workmanship.
d. All Outside Plant (OSP) and Inside Plant (ISP) cabling projects installed on Lackland AFB, Medina Annex, or Camp Bullis as part of any MILCON, SABER, or other project must meet commercial industry and Telecommunications Systems Cabling Standards.
e. Televisions will be installed at a height that allows optimized viewing for students in the back row equally as those in the front row.
Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage of materials shall be coordinated with the customer.
3 WORK HOURS AND SPECIAL CONDITIONS
Work hours shall begin at 7:30 p.m. through 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the option of the government and with approval of the Contracting Officer, work may be permitted on Federal holidays, weekends, or after 4:30 p.m. at no additional cost to the government.
4 BASE FIRE REGULATIONS
The contractor shall comply with all JBSA-Lackland AFB Post Fire Regulations.
5 SITE MAINTENANCE AND CLEANUP
Site Maintenance: The contractor shall maintain work areas in a neat, clean, and safe condition. The contractor shall be responsible for providing, installing, and the removal of any temporary signage, barriers, barricade tape, etc. which may be required to control pedestrian in the work area.
Dust Control: The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the building or construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
Cleanup: The contractor shall collect all trash, debris, refuse, garbage, etc., which is. The aforementioned materials shall be removed from the site by appropriate means daily. Disposal shall be outside the limits of government property.
6 ENERGY CONSERVATION
The contractor shall use good judgment in the conservation of government utilities. The contractor shall adhere to and enforce prevailing energy conservation practices.
7 STORAGE AND PARKING
The contractor shall keep all customer approved storage areas free of debris, refuse, spills, leaks, stains, splashes and excessive materials. All storage areas shall be maintained in a neat, clean, and safe condition.
8 SAFETY
All Contractor/Subcontractor employees working under this contract shall comply with the Installation Traffic Regulations.
9 CONTRACT MANAGEMENT
No changes in or deviation from the scope of service shall be effected without a modification executed by the Contracting Officer authorizing such changes.
10 INSPECTION AND ACCEPTANCE
The government, 37 TRSS, will conduct the final inspection with the Contractor and the Contracting Office to determine whether the project can be accepted or corrections required prior to acceptance.