MAP-GatewayChapel-LAK.pdf

PDF 579 KB Posted

Attached to
Band Sound Components. Federal contract opportunity
Solicitation number
FA3016-16-N-0099
Issued by
Department of the Air Force Air Education and Training Command

About this file

Map of Lackland Air Force Base

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lackland Air Force Base

MAP

1.1.2 PERFORMANCE PERIOD The contractor shall schedule and complete within ninety (90) working days all requirements identified in this SOW unless a longer performance period is agreed to by the CO, who will maintain performance period oversight.
1.1.3 MEASUREMENT OF REQUIREMENTS The contractor will be responsible for the installation, fit and finish, as well as functional control and operation of the projector and related audio visual components.
1.1.4 PREPARATION The contractor will be responsible for site prep as well as the coordination with the program manager (PM) and the contracting officer (CO). This includes, but is not limited to site preparation, utilities, installation hardware, ...
2.1.1 INSTALLATION Installation will be scheduled with the PM to insure access to the site and minimal disruption to training activities. Contractor shall work in conjunction with organizational departments to ensure satisfactory implementation of ...
2.1.3 System Installation The Contractor shall furnish and install all required equipment and components. The Contractor shall connect, integrate, configure, program, and test controls for all new screens, speakers, projectors, lighting and video an...
1.4.2 Government Remedies. The contracting officer will follow the requirements of FAR 52.212-4, Contract Terms and Conditions for Commercial Items (May 2014), for contractor’s failure to correct nonconforming services.
1.4.3 Equipment Delivery. All equipment will be held the contractor and delivered at the start of the installation. Contractor shall provide itemized list of all equipment with make, model and serial number.
1.4.4 Commercial Warranty. The Contractor agrees that the supplies/equipment or services furnished under this contract shall be covered by the most favorable commercial warranties. The printed terms and conditions of such warranties will be provided t...
1.5 INSPECTION AND ACCEPTANCE. Inspection and acceptance will be at the project site by the Program Manager and Contracting Officer or his authorized representatives.
1.5.1 PRE-FINAL AND FINAL INSPECTION
1.5.1.1 Pre-Final Inspection: The Contracting Officer and PM or technical representatives shall conduct a pre-final inspection when the project is substantially completed prior to a final inspection of the facility.
Upon completion of the pre-final inspection, the PM will transmit a punch list report to the Contractor listing discrepancies requiring correction or completion and establishing a date for the final inspection. The Contractor has ten (10) days to comp...
1.5.1.2 Final Inspection: When all pre-final inspection discrepancies have been corrected, the CO will conduct the final inspection with the PM, Government representatives, the Contractor, and any needed subcontractors to determine whether the project...
1.5.1.3 Re-inspection: if, upon the final re-inspection, it is found that punch list items are not sufficiently completed that the project cannot be finally accepted, the Contractor may be responsible for the Government costs for the additional techni...
2.0 GOVERNMENT ACCEPTANCE:
IAW the terms of the contract, Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting ...
APPENDIX C
1.3.1 GOVERNMENT FURNISHED PROPERTY
All of the properties and service listed under this paragraph will be provided to the contractor.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time wil...
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
4. APPENDICES
A. Maps and/or Site Plans
B. Government Furnished Property/Services/Equipment
3.0 SERVICE SUMMARY: