This document contains questions and answers regarding a solicitation for flip top tables. The solicitation seeks to procure mobile flip top tables for installation on the second floor of an Air Force facility that does not have a loading dock or forklift. Access to the building is available from 6am to 4pm CDT through standard double doors or via elevator. The elevator dimensions are provided. Stairs may be required to transport the tables to the second floor, as there are 25 to 30 stairs. Color options for laminate surfaces should be provided for selection after award. A 3mm PVC edge is acceptable. Installation will not require compliance with prevailing wage standards. Progress payments will not be allowed. The contractor will provide a proposed delivery timeframe. The related solicitation is identified as FA301023QMB06 for the Department of the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to Flip Top Tables, newest first.
File Type Posted
QA - Flip Top Tables.pdf PDF
Attachment 1 - Flip Top Tables Salient Characteristics.pdf PDF
Combo Synopsis Solicitation - Flip Top.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flip Top Tables Q&A Version 2

24 August 2023

Question # Date Received Question Response 1 21 Aug 2023 Do the legs need to be mobile? (casters) Per Salient Characteristics, Yes 2 21 Aug 2023 Does this item need to be on a GSA contract or open Market?

See Combo Synopsis/Solicitation‐ Evaluation Criteria This particular requirement is for open market quotes.

3 21 Aug 2023 Does the building have a loading dock? No 4 21 Aug 2023 Are there restrictions on installation hours?

Access to buildings will be from 6:00 am to 4:00 pm CDT

5 21 Aug 2023 Does the access to rooms require stairs carry or elevator?

Yes, buildings have both stairs and elevator

6 21 Aug 2023 Please advise on laminate colors if available

Please provide color options and one will be chosen after award.

7 21 Aug 2023 Is 3 mm PVC edge acceptable? Yes 8 21 Aug 2023 Is the installation wage‐based (Davis

Bacon Act)?

No

9 21 Aug 2023 Will progress payments be allowed for this order?

No

10 21 Aug 2023 What is the delivery target timeframe? Contractor provides delivery target timeframe. See Combo Synopsis/Solicitation‐ Notice to Offeror(s)/Supplier(s)

11 22 Aug 2023 Do you have a forklift? No 12 22 Aug 2023 Do you have workers/custodians that are able to move the pallets/crates/boxes to the designated room or staging area?

No

13 22 Aug 2023 What type/size of entranceway do you have?

Standard Double Door entrance – Dimensions: 5ft 8in wide 87” H

14 22 Aug 2023 What floor level will Inside service and/or assembly take place on?

See Salient Characteristics – 2nd floor

15 22 Aug 2023 Is ANY sort of stair carry required? See Question #5 Response 16 22 Aug 2023 Is an elevator available? Elevator dimensions are required.

Elevator Dimensions: W‐81” L‐69.5” H‐87”

17 22 Aug 2023 If no elevator – How many stairs are there if the product needs to be carried up the stairs?

See Question #5 Response – Number of stairs: 25‐30