QA - Flip Top Tables.pdf

PDF 105 KB Posted

Attached to
Flip Top Tables Federal contract opportunity
Solicitation number
FA301023QMB06
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains questions and answers regarding flip top tables for the Department of the Air Force Air Education and Training Command. The questions cover topics such as table leg mobility, laminate colors, edge types, installation requirements, delivery timeframes, building access and loading dock availability. Responses indicate that casters are not required, 3mm PVC edges are acceptable, Davis Bacon wage rates do not apply, progress payments will not be allowed, and the contractor will provide the delivery timeframe. Installation can occur between 6am and 5pm CDT and buildings have stairs and elevators for access. No loading dock, forklift or custodial assistance is available for deliveries. Standard double door entrances and multiple floor levels may be involved, requiring stair carries as needed.

View the file

Other files for this federal contract opportunity

Other files attached to Flip Top Tables, newest first.
File Type Posted
Updated QA - Flip Top Tables.pdf PDF
Combo Synopsis Solicitation - Flip Top.pdf PDF
Attachment 1 - Flip Top Tables Salient Characteristics.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flip Top Tables Q&A Version 1

22 August 2023

Question # Date Received Question Response 1 21 Aug 2023 Do the legs need to be mobile? (casters) See Salient Characteristics 2 21 Aug 2023 Does this item need to be on a GSA contract or open Market?

See Combo Synopsis/Solicitation‐ Evaluation Criteria

3 21 Aug 2023 Does the building have a loading dock? No 4 21 Aug 2023 Are there restrictions on installation hours?

Access to buildings will be from 6:00 am to 5:00 pm CDT

5 21 Aug 2023 Does the access to rooms require stairs carry or elevator?

Yes, buildings have both stairs and elevator

6 21 Aug 2023 Please advise on laminate colors if available

White

7 21 Aug 2023 Is 3 mm PVC edge acceptable? Yes 8 21 Aug 2023 Is the installation wage‐based (Davis

Bacon Act)?

No

9 21 Aug 2023 Will progress payments be allowed for this order?

No

10 21 Aug 2023 What is the delivery target timeframe? Contractor provides delivery target timeframe. See Combo Synopsis/Solicitation‐ Notice to Offeror(s)/Supplier(s)

11 22 Aug 2023 Do you have a forklift? No 12 22 Aug 2023 Do you have workers/custodians that are able to move the pallets/crates/boxes to the designated room or staging area?

See Salient Characteristics

13 22 Aug 2023 What type/size of entranceway do you have?

Standard Double Door entrance

14 22 Aug 2023 What floor level will Inside service and/or assembly take place on?

See Salient Characteristics

15 22 Aug 2023 Is ANY sort of stair carry required? See Question #5 Response 16 22 Aug 2023 Is an elevator available? Elevator dimensions are required.

See Question #5 Response

17 22 Aug 2023 If no elevator – How many stairs are there if the product needs to be carried up the stairs?

See Question #5 Response