MAHG101026C_Repair_Larcher_Paving_ADDENDUM1.pdf

PDF 36 KB Posted

Attached to
Repave Larcher Paving Federal contract opportunity
Solicitation number
FA3010-18-R-0022
Issued by
Department of the Air Force Air Education and Training Command

About this file

Please see attached. All proposals will be sent to TSgt Marcos Morales at marcos.morales.2@us.af.mil1

View the file

Other files for this federal contract opportunity

Other files attached to Repave Larcher Paving, newest first.
File Type Posted
Amend_1.pdf PDF
Site_Visit_Sign_in.pdf PDF
Attachment_6_-_Reference_List.pdf PDF
Attachment_5_-_PPQ.pdf PDF
Attachment_8_-_SF_1444.pdf PDF
FA3010-18-R-0022.pdf PDF
Attachment_4-MAHG101026C_Repair_Larcher_Paving_DWG.pdf PDF
Attachment_1-_MAHG101026C_Repair_Larcher_Paving_SPEC.pdf PDF
Attachment_3-_WDOL_Highway_Repair_Larcher_Paving.pdf PDF
Attachment_2-MAHG101026C_Repair_Larcher_Paving_SOW.pdf PDF
Attachment_7_-__Notice_of_Compliance.pdf PDF
Synopsis.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 3, 2018

ADDENDUM #1

The following (1) sheet have been changed in the construction documents for the following project:

MAHG101026C REPAIR LARCHER PAVING

KEESLER AFB, MISSISSIPPI

Any information found within these documents shall take precedent over the information contained within the original construction documents. It is the responsibility of the contractor to review the documents and to include any revised or additional information in their proposal.

Changes to Scope of Work/ Drawing:

Phase 4 Traffic Plan is missing from the design set. Include the following for Phase 4 Traffic Plan requirments:

North Bound Larcher: Turn right (east) on Meadows, Left (north) on Fifth, left (west) on Fisher.

Detour signs will be needed at Larcher and Meadows, meadows and Fifth, and Fifth and Fisher.

Barricades will be required at Larcher and Meadows, Larcher and Fisher, Larcher and G, and Larcher and H..

Traffic Light at Larcher and Meadows will remain as programmed.

South Bound Larcher: From Fisher, Left (south) on Third, left (east) on Meadows, and right (south) on Larcher.

Detour Signs will be needed at Larcher and Fisher, Fisher and Third, Third and Meadows, and Meadows and Larcher.

Barricades will be required at Larcher and Meadows, Larcher and Fisher, Larcher and G, and Larcher and H.

Stop Signs will be needed at Fisher and Third (2), and Meadows and Third (2) to make a 4 way stops. Add “4 Way” signs at each stop sign for duration of Phase 4.

Traffic Light at Larcher and Meadows will remain as programmed.