Attachment_2_-_Specifications.pdf
PDF 690 KB Posted
- Attached to
- Airfield Markings Federal contract opportunity
- Solicitation number
- FA301018R0017
About this file
Attachment 2 - Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_2.pdf | ||
| Attachment_9_-_Addendum_1.pdf | ||
| Attachment_10_-_Drawing_2_Re-Print.pdf | ||
| Amend_1.pdf | ||
| Sign_In_Sheet.pdf | ||
| Attachment_1_-_SOW.pdf | ||
| Attachment_7_-__Notice_of_Compliance.pdf | ||
| FA301018R0017.pdf | ||
| Attachment_6_-_Reference_List.pdf | ||
| Attachment_3_-_Drawings.pdf | ||
| Attachment_5_-_PPQ.pdf | ||
| Attachment_8_-_SF_1444.pdf | ||
| Attachment_4_-_Wage_Det_MS180237.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Keesler, AFB , Biloxi, MS Proj # MAHG 18 1016
Air Field Markings and Runway Rub Rem Section 240010 Markings
Pavement Markings – Sect 240010 Page 1 of 9
SECTION TABLE OF CONTENTS
SECTION 240010 PAVEMENT MARKINGS (04/08)
PART 1 GENERAL
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.3.1 Paint Application Equipment
1.3.1.1 Self-Propelled or Mobile-Drawn Pneumatic Spraying Machines
1.3.1.2 Hand-Operated, Push-Type Machines
1.3.3 Reflective Media Dispenser
1.3.5 Surface Preparation Equipment
1.3.5.1 Sandblasting Equipment
1.3.5.2 Waterblast Equipment
1.3.6 Marking Removal Equipment
1.3.6.1 Shotblasting Equipment
1.3.6.2 Chemical Equipment
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
1.5.2 Traffic Controls
1.5.3 Maintenance of Traffic
1.5.3.1 Airfield
1.5.3.2 Roads, Streets
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS
2.1 PAINT
2.5 REFLECTIVE MEDIA
2.6 SAMPLING AND TESTING
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Attachment 2
FA301018R0017
Pavement Markings – Sect 240010 Page 2 of 9
3.1.1 Pretreatment for Early Painting
3.1.2 Cleaning Existing Pavement Markings
3.1.3 Cleaning Concrete Curing Compounds
3.2 APPLICATION
3.2.1 Paint
3.2.1.1 Rate of Application
3.2.1.2 Drying
3.2.5 Reflective Media
3.3 MARKING REMOVAL N/A
-- End of Section Table of Contents --
Pavement Markings – Sect 240010 Page 3 of 9
PART 1. GENERAL
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS TT-B-1325 (Rev C) Beads (Glass Spheres) Retro-Reflective (Metric) FS TT-P-1952 (Rev D) Paint, Traffic and Airfield Markings, Waterborne
1.3 SYSTEM DESCRIPTION
All machines, tools and equipment used in the performance of the work shall be approved and maintained in satisfactory operating condition. Equipment operating on roads and runways shall display low speed traffic markings and traffic warning lights.
1.3.1 Paint Application Equipment
1.3.1.1 Self-Propelled or Mobile-Drawn Pneumatic Spraying Machines The equipment to apply paint to pavements shall be a self-propelled or mobile-drawn pneumatic spraying machine with suitable arrangements of atomizing nozzles and controls to obtain the specified results. The machine shall have a speed during application not less than 8 km/hour 5 mph, and shall be capable of applying the stripe widths indicated, at the paint coverage rate specified in paragraph APPLICATION, and of even uniform thickness with clear-cut edges.
The equipment used to apply the paint binder to airfield pavements shall be a self-propelled or mobile-drawn pneumatic spraying machine with an arrangement of atomizing nozzles capable of applying a line width at any one time in multiples of 150 mm 6 inches, from 150 mm 6 inches to 900 mm 36 inches. The paint applicator shall have paint reservoirs or tanks of sufficient capacity and suitable gauges to apply paint in accordance with requirements specified. Tanks shall be equipped with suitable air-driven mechanical agitators. The spray mechanism shall be equipped with quick-action valves conveniently located, and shall include necessary pressure regulators and gauges in full view and reach of the operator. Paint strainers shall be installed in paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator shall be readily adaptable for attachment of an air-actuated dispenser for the reflective media approved for use. Pneumatic spray guns shall be provided for hand application of paint in areas where the mobile paint applicator cannot be used.
1.3.1.2 Hand-Operated, Push-Type Machines
All machines, tools, and equipment used in performance of the work shall be approved and maintained in satisfactory operating condition. Hand-operated push-type machines of a type commonly used for application of paint to pavement surfaces will be acceptable for marking small streets and parking
Pavement Markings – Sect 240010 Page 4 of 9 areas. Applicator machine shall be equipped with the necessary paint tanks and spraying nozzles, and shall be capable of applying paint uniformly at coverage specified. Sandblasting equipment shall be provided as required for cleaning surfaces to be painted. Hand-operated spray guns shall be provided for use in areas where push-type machines cannot be used.
1.3.3 Reflective Media Dispenser
The dispenser for applying the reflective media shall be attached to the paint dispenser and shall operate automatically and simultaneously with the applicator through the same control mechanism. The dispenser shall be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION, at all operating speeds of the applicator to which it is attached.
1.3.5 Surface Preparation Equipment
1.3.5.1 Sandblasting Equipment
Sandblasting equipment shall include an air compressor, hoses, and nozzles of proper size and capacity as required for cleaning surfaces to be painted. The compressor shall be capable of furnishing not less than 70.8 L/sec 150 cfm of air at a pressure of not less than 620 kPa 90 psi at each nozzle used, and shall be equipped with traps that will maintain the compressed air free of oil and water.
1.3.5.2 Waterblast Equipment
The water pressure shall be specified at 17.9 MPa 2600 psi at 60 degrees C 140 degrees F in order to adequately clean the surfaces to be marked.
1.3.6 Marking Removal Equipment
Equipment shall be mounted on rubber tires and shall be capable of removing markings from the pavement without damaging the pavement surface or joint sealant. Waterblasting equipment shall be capable of producing an adjustable, pressurized stream of water. Sandblasting equipment shall include an air compressor, hoses, and nozzles. The compressor shall be equipped with traps to maintain the air free of oil and water.
1.3.6.1 Shotblasting Equipment
Shotblasting equipment shall be capable of producing an adjustable depth of removal of marking and pavement. Each unit shall be self-cleaning and self-contained, shall be able to confine dust and debris from the operation, and shall be capable of recycling the abrasive for reuse.
1.3.6.2 Chemical Equipment
Chemical equipment shall be capable of application and removal of chemicals from the pavement surface, and shall leave only non-toxic biodegradable residue.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval, information only.
Submit the following in accordance with Section 01 33 00
Pavement Markings – Sect 240010 Page 5 of 9
SUBMITTAL PROCEDURES:
SD-03 Product Data
Equipment Lists of proposed equipment, including descriptive data, and notifications of proposed Contractor actions as specified in this section. List of removal equipment shall include descriptive data indicating area of coverage per pass, pressure adjustment range, tank and flow capacities, and safety precautions required for the equipment operation.
Composition Requirements Manufacturer's current printed product description and Material Safety Data Sheets (MSDS) for each type paint/color proposed for use.
Qualifications Documentation on personnel qualifications, as specified.
SD-06 Test Reports
Sampling and Testing Certified copies of the test reports, prior to the use of the materials at the jobsite. Testing shall be performed in an approved independent laboratory.
SD-07 Certificates
Volatile Organic Compound (VOC) Certificate stating that the proposed pavement marking paint meets the VOC regulations of the local Air Pollution Control District having jurisdiction over the geographical area in which the project is located.
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of chemicals.
1.5.2 Traffic Controls
Suitable warning signs shall be placed near the beginning of the worksite and well ahead of the worksite for alerting approaching traffic from both directions. Small markers shall be placed along newly painted lines or freshly placed raised markers to control traffic and prevent damage to newly painted surfaces or displacement of raised pavement markers.
Painting equipment shall be marked with large warning signs indicating slow-moving painting equipment in operation.
Pavement Markings – Sect 240010 Page 6 of 9
1.5.3 Maintenance of Traffic
1.5.3.1 Airfield
The performance of work in the controlled zones of airfields shall be coordinated with the Contracting Officer and with the Air Field Manager.
Verbal communications shall be maintained with the control tower before and during work in the controlled zones of the airfield. The control tower shall be advised when the work is completed. A radio for this purpose will be provided by the Government.
1.5.3.2 Roads, Streets, When traffic must be rerouted or controlled to accomplish the work, the necessary warning signs, flagpersons, and related equipment for the safe passage of vehicles shall be provided.
1.6 DELIVERY, STORAGE, AND HANDLING
All materials shall be delivered and stored in sealed containers that plainly show the designated name, formula or specification number, batch number, color, date of manufacture, manufacturer's name, and directions, all of which shall be plainly legible at time of use.
1.7 ENVIRONMENTAL REQUIREMENTS
Pavement surface shall be free of snow, ice, or slush. Surface temperature shall be at least 5 degrees C 40 degrees F and rising at the beginning of operations, except those involving shot or sand blasting. Operation shall cease during thunderstorms. Operation shall cease during rainfall, except for waterblasting and removal of previously applied chemicals.
Waterblasting shall cease where surface water accumulation alters the effectiveness of material removal.
PART 2 PRODUCTS
2.1 PAINT
The paint shall be homogeneous, easily stirred to smooth consistency, and shall show no hard settlement or other objectionable characteristics during a storage period of 6 months. Paints for airfields, roads, parking areas, and streets shall conform to FS TT-P-1952, color as indicated.
Pavement marking paints shall comply with applicable state and local laws enacted to ensure compliance with Federal Clean Air Standards.
Paint materials shall conform to the restrictions of the local Air Pollution Control District.
2.5 REFLECTIVE MEDIA
Reflective media for airfields shall conform to FS TT-B-1325, Type I, Gradation A. Reflective media for roads and streets shall conform to FS TT-B-1325, Type I, Gradation A or AASHTO M 247, Type I.
2.6 SAMPLING AND TESTING
Materials proposed for use shall be stored on the project site in sealed and labeled containers, or segregated at source of supply, sufficiently in advance of needs to allow 60 days for testing. Upon notification by the
Pavement Markings – Sect 240010 Page 7 of 9
Contractor that the material is at the site or source of supply, a sample shall be taken by random selection from sealed containers in the presence of the Contracting Officer. Samples shall be clearly identified by designated name, specification number, batch number, manufacturer's formulation number, project contract number, intended use, and quantity involved.
If materials are approved based on reports furnished by the Contractor, samples will be retained by the Government for possible future testing should the material appear defective during or after application.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Thoroughly clean surfaces to be marked before application of the pavement marking material. Dust, dirt, and other granular surface deposits shall be removed by sweeping, blowing with compressed air, rinsing with water or a combination of these methods as required. Rubber deposits, surface laitance, existing paint markings, and other coatings adhering to the pavement shall be completely removed with scrapers, wire brushes, sandblasting, approved chemicals, or mechanical abrasion as directed.
Areas of old pavement affected with oil or grease shall be scrubbed with several applications of trisodium phosphate solution or other approved detergent or degreaser, and rinsed thoroughly after each application.
After cleaning, oil-soaked areas shall be sealed with cut shellac to prevent bleeding through the new paint. Pavement surfaces shall be allowed to dry, when water is used for cleaning, prior to striping or marking.
Surfaces shall be recleaned, when work has been stopped due to rain.
3.1.1 Pretreatment for Early Painting
Where early painting is required on rigid pavements, apply a pretreatment with an aqueous solution, containing 3 percent phosphoric acid and 2 percent zinc chloride, to prepared pavement areas prior to painting.
3.1.2 Cleaning Existing Pavement Markings
In general, markings shall not be placed over existing pavement marking patterns. Remove existing pavement markings, which are in good condition but interfere or conflict with the newly applied marking patterns.
Deteriorated or obscured markings that are not misleading or confusing or interfere with the adhesion of the new marking material do not require removal. New preformed and thermoplastic pavement markings shall not be applied over existing preformed or thermoplastic markings. Whenever grinding, scraping, sandblasting or other operations are performed the work must be conducted in such a manner that the finished pavement surface is not damaged or left in a pattern that is misleading or confusing. When these operations are completed the pavement surface shall be blown off with compressed air to remove residue and debris resulting from the cleaning work.
3.1.3 Cleaning Concrete Curing Compounds
On new portland cement concrete pavements, cleaning operations shall not begin until a minimum of 30 days after the placement of concrete. All new
Pavement Markings – Sect 240010 Page 8 of 9 concrete pavements shall be cleaned by either sandblasting or water blasting. When water blasting is performed, thermoplastic and preformed markings shall be applied no sooner than 24 hours after the blasting has been completed. The extent of the blasting work shall be to clean and prepare the concrete surface as follows:
a. There is no visible evidence of curing compound on the peaks of the textured concrete surface.
b. There are no heavy puddled deposits of curing compound in the valleys of the textured concrete surface.
c. All remaining curing compound is intact; all loose and flaking material is removed.
d. The peaks of the textured pavement surface are rounded in profile and free of sharp edges and irregularities.
e. The surface to be marked is dry.
3.2 APPLICATION
All pavement markings and patterns shall be placed as shown on the plans.
3.2.1 Paint
Paint shall be applied to clean, dry surfaces, and only when air and pavement temperatures are above 5 degrees C 40 degrees F and less than 35 degrees C 95 degrees F. Paint temperature shall be maintained within these same limits. New asphalt pavement surfaces and new Portland concrete cement shall be allowed to cure for a period of not less than 30 days before applications of paint. Paint shall be applied pneumatically with approved equipment at rate of coverage specified . Provide guide lines and templates as necessary to control paint application. Special precautions shall be taken in marking numbers, letters, and symbols. Edges of markings shall be sharply outlined.
3.2.1.1 Rate of Application
a. Reflective Markings: Pigmented binder shall be applied evenly to the pavement area to be coated at a rate of 2.9 plus or minus 0.5 square meter/L 105 plus or minus 5 square feet/gallon. Glass spheres shall be applied uniformly to the wet paint [on airfield pavement at a rate of 1.0 8] [on road and street pavement at a rate of 0.7 6] plus or minus 0.06 kg 0.5 pounds of glass spheres per L gallon of paint.
b. Nonreflective Markings: Paint shall be applied evenly to the pavement surface to be coated at a rate of 2.9 plus or minus 0.5 square meter/L 105 plus or minus 5 square feet/gallon.
3.2.1.2 Drying
The maximum drying time requirements of the paint specifications will be strictly enforced to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic. If there is a delay in drying of the markings, painting operations shall be discontinued until cause of the slow drying is determined and corrected.
3.2.5 Reflective Media
Application of reflective media shall immediately follow application of pigmented binder. Drop-on application of glass spheres shall be accomplished to insure that reflective media is evenly distributed at the specified rate of coverage. Should there be malfunction of either paint
Pavement Markings – Sect 240010 Page 9 of 9 applicator or reflective media dispenser, operations shall be discontinued immediately until deficiency is corrected.
-- End of Section --
Keesler, AFB, Biloxi, MS Proj No. MAHG 18 1016
Air Field Markings and RunwayRubRem Section 011152 Rubber Removal
Rubber Removal - Section 011152 Page 1 of 4
SECTION TABLE OF CONTENTS
SECTION 011152 RUNWAY RUBBER REMOVAL 08/08
PART 1 GENERAL
1.2 SYSTEM DESCRIPTION
1.2.1 RUBBER REMOVAL EQUIPMENT
1.2.1.1 Waterblasting Equipment
1.2.1.2 Shotblasting Equipment
1.2.1.3 Sandblasting Equipment
1.2.2 Chemical Rubber Removal Equipment
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Maintenance of Traffic
1.4.2 Landing and Take-Offs
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 RUBBER REMOVAL
3.2 CLEANUP AND WASTE DISPOSAL
-- End of Section Table of Contents --
Air Field Markings and RunwayRubRem Section 011152 Rubber Removal
Rubber Removal - Section 011152 Page 2 of 4
PART 1 GENERAL
1.2 SYSTEM DESCRIPTION
1.2.1 RUBBER REMOVAL EQUIPMENT
Mechanical rubber removal equipment includes waterblasting, shotblasting, sandblasting, or other approved nonchemical systems. Control equipment to be used on asphalt or tar concrete to remove rubber accumulations and minimize disturbance to asphalt or tar mixtures. Equipment to be used on portland cement concretes shall be controlled to remove rubber accumulations and prevent removal of hardened paste from the concrete.
Basic hand tools and the following major types of mechanical equipment will be considered acceptable for this project.
1.2.1.1 Waterblasting Equipment
Provide mobile waterblasting equipment capable of producing a pressurized stream of water that will effectively remove rubber from the pavement surface without significantly damaging the pavement. Regulate water pressure so that substantially all rubber accumulations are removed during execution of the work.
1.2.1.2 Shotblasting Equipment
Provide mobile self propelled shotblasting equipment capable of producing an adjustable depth of rubber removal and of propelling abrasive particles at high velocities on the rubber for effective removal. Each unit shall be self cleaning and self contained. Provide equipment able to confine the abrasive, any dust that is produced, and removed rubber; and capable of recycling the abrasive for reuse.
1.2.1.3 Sandblasting Equipment
Provide mobile sandblasting equipment capable of producing a pressurized stream of sand and air that will effectively remove rubber from the pavement surface without filling voids with debris in asphalt or tar pavements or removing joint sealants in portland cement concrete pavements. Include with the equipment an air compressor, hoses, and nozzles of adequate size and capacity for removing all rubber. Equip the compressor with traps that will maintain the compressed air free of oil and water, and capable of furnishing a flow rate of at least 0.071 cubic meters/second 150 cubic feet/minute of air at a pressure of at least 621 kPa 90 psi at each nozzle.
1.2.2 Chemical Rubber Removal Equipment
Chemical equipment shall be capable of application and removal of chemicals from the pavement surface and shall leave only non-toxic biodegradable residue.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control approval.][information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the
Air Field Markings and RunwayRubRem Section 011152 Rubber Removal
Rubber Removal - Section 011152 Page 3 of 4
Government.] Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Rubber Removal Equipment A list of construction equipment including item names and descriptions.
Rubber Removal Statements regarding the suitability of materials, personnel, and methods proposed to accomplish the work.
1.4 QUALITY ASSURANCE
1.4.1 Maintenance of Traffic
Coordinate the operation of equipment and the performance of work upon and in the vicinity of airfields with the Contracting Officer and with the Flight Operations Officer. Neither equipment nor personnel shall use any portion of an airfield without permission of these officers unless the runway is closed. In all cases, maintain verbal communication with the control tower before and during work in the vicinity of the airfield. The control tower shall be advised when work is completed. Runways will be closed during the following times:
1.4.2 Landing and Take-Offs
Emergency landings and take-offs shall take precedence over all Contractor operations. When notified of an emergency situation, cease all rubber removal operations and immediately clear the runway of all equipment and personnel for a distance of at least 60 meters 200 feet from the edge of the runway.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver materials, that are required in the approved rubber removal process, in original manufacturer's containers labeled with appropriate EPA, OSHA, or other agency warnings, if applicable. Protect materials from the environment until their use is required during execution of the work.
1.6 ENVIRONMENTAL REQUIREMENTS
Pavement surface shall be free of snow, ice or slush. Surface temperature shall be at least 5 degrees C 40 degrees F and rising at the beginning of operations except those involving shotblasting or sandblasting for which a lower surface temperature may be approved. Cease operation during thunderstorms. Cease operation during rainfall except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.
Air Field Markings and RunwayRubRem Section 011152 Rubber Removal
Rubber Removal - Section 011152 Page 4 of 4
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 RUBBER REMOVAL
The pavement surface may be of portland cement, tar or asphalt mixtures.
Only use chemical methods which are compatible with pavement materials, the environment and working personnel. Exercise close control of water pressure and blasting time/duration to prevent disintegration damage to asphalt and tar concretes. Exercise extremely good control for porous friction courses. Demonstrate the ability to remove rubber at a touchdown area of the runway selected by the Contracting Officer; at least one site per runway will be chosen. Rubber removal shall be as complete as possible without damage to the pavement surface. The surface texture of the cleaned demonstration area will be compared to that of nonrubber traffic areas to determine satisfactory completion of the removal operation. After approval of the Contractor's operations the cleaned area will become the standard for rubber removal and final surface texture for the remainder of work.
Keep the worksite clean of debris and waste from rubber removal operations. Cleanup operations shall be continuous. Debris and waste materials shall be accumulated and disposed at approved sites.
-- End of Section --
| Specs Airfield Markings Jan17 |
| Specs Airfield RubberRemoval Jan2018 |
File details come from the government source that posted it.