Attachment_8_-_Addendum_1.pdf

PDF 575 KB Posted

Attached to
Build Warehouse/Offices Federal contract opportunity
Solicitation number
FA301018R0013
Issued by
Department of the Air Force Air Education and Training Command

About this file

Addendum 1

View the file

Other files for this federal contract opportunity

Other files attached to Build Warehouse/Offices, newest first.
File Type Posted
Attachment_9_-_Addendum_2.pdf PDF
Amend_5.pdf PDF
Amend__4.pdf PDF
Amend_3.pdf PDF
Amend_2.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Amend_1.pdf PDF
Attachment_7_-_SF_1444.pdf PDF
Attachment_1_-_Specifications.pdf PDF
FA301018R0013.pdf PDF
Attachment_4_-_PPQ.pdf PDF
Attachment_3_-_Wage_Det_MS180141.pdf PDF
Attachment_5_-_Reference_List.pdf PDF
Attachment_2_-_Drawings.pdf PDF
Attachment_6_-__Notice_of_Compliance.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 19, 2018

ADDENDUM #1

The following sheet has been changed in the construction documents for the following project:

MAHG17-9002 36 AES Warehouse

KEESLER AFB, MISSISSIPPI

Any information found within these documents shall take precedent over the information contained within the original construction documents. It is the responsibility of the contractor to review the documents and to include any revised or additional information in their proposal.

Changes to the specifications:

Section 28 31 74.00 20: Delete all references to providing a laptop. Change deliverable location from Eglin AFB to Keesler AFB.

Section 01 33 29; Delete all references to this section and to LEED in all sections.

Changes to the drawings:

C101- Add note “Contractor to coordinate with sheet E101 to remove sufficient concrete to install the ground loop and transformer pad.”

A101- Revise note at Mechanical pad to read: “Conc. Mech. Equip. Pad See Detail 6/M-501”

E001- Add note: Outlets and lights in the same room that are on occupancy sensors shall have separate sensors for each.

E001- Add “Exit” Lighting to the luminaire Schedule- Equal to Lithonia TLE-1-R-EL N.

E101- Revise General Note 7 to say Power Logic ION8650 to be located on the MDP.

E102- Light switches by the 3 exterior 3’ doors should be 4 way.

-Each office should receive 1 fixture with an emergency ballast.

E-103 - WAP drops were identified as 4D it should be 2D

- Mech Room drops ID as 4D it should be 2D

- Communications Rack Elevation, Needs to reflect one switch type CISCO 4510- OFOI

E501- Detail 7: Delete note 4 and second sentence of note 1.

General Notes: Delete note 3.

E701- Delete detail 2.

FA101- Replace “Class B” wiring with “Class A” wiring in note 13.