FA301018R0011A5.pdf

PDF 24 KB Posted

Attached to
Keesler AFB SABER Federal contract opportunity
Solicitation number
FA301018R0011
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Keesler AFB SABER, newest first.
File Type Posted
MAHG161002_Recycle_Center_Phase_2_SOW_revD.pdf PDF
MAHG161002_Addendum_2.pdf PDF
MAHG161002_ADDENDUM_1.pdf PDF
Atch5_MAHG161002_sow_RevC.pdf PDF
FA301018R0011A0004.pdf PDF
FA301018R0011A0003.pdf PDF
FA301018R0011A0002.pdf PDF
FA301018R0011A0001.pdf PDF
18R0011_SV_SignIn.pdf PDF
FA301018R0011.pdf PDF
Attachment_11_PPQ.pdf PDF
Atch4_MS180237_Highway.pdf PDF
Atch2_MS180141_Building.pdf PDF
Atch7_MAHG161002_ALT1_Dwgs.pdf PDF
Attachment_1__SGSOW.pdf PDF
Atch6_MAHG161002__Dwgs.pdf PDF
Atch8_MAHG161002_Mechanical_Specs.pdf PDF
Atch5__MAHG161002_SOW.pdf PDF
Atch3_MS180155_Heavy.pdf PDF
Attachment_10_PP_Reference_List.pdf PDF
Atch_9_AF_Form_66.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To answ er f inal offeror questions, add Addendum 2, and incorporate a revised statement of w ork for sample project MAHG16-1002 Renovate Recycle Center.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301018R0011

X 9B. DATED (SEE ITEM 11)

08-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Apr-2018

CODE

81ST CONTRACTING SQUADRON

DONALD KINSMAN

500 FISHER ST, BLDG 0701, RM 202G

KEESLER AFB MS 39534

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301018R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONSAND ANSWERS

Question:

The SOW is calling for removing the existing conduit from transformer T35-4004 to Bldg 4004. There is no way to figure how the conduit has been installed or the depth. Can the existing conduit from the transformer to building 4004 be capped and abandoned in place? With a new conduit 2 ½’’ conduit To be install from the transformer to the building 4004.

Answer:

Remove the conductors and abandon the conduit in place. See Addendum 2.

Question:

The revised SOW page 2 refers to Fencing / Curb (Exterior); * Dock 7(NW Dock); See drawing A3.0. There is no A3.0 drawing.

Answer:

The correct reference should be Detail 1 on page A1.0. See Addendum 2.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Apr-2018 02:00 PM to 23-Apr-2018 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Document Type Description Pages Date Attachment 1 General Statement of Work (SGSOW) 48 12 Feb 18

FA301018R0011

Attachment 2 Wage Determination MS180141 5 5 Jan 18 Attachment 3 Wage Determination MS180155 4 5 Jan 18 Attachment 4 Wage Determination MS180237 5 5 Jan 18 Attachment 5 Sample Project MAHG16-1002 SOW (RevD) 23 17 Apr 18 Attachment 6 Sample Project MAHG16-1002 Drawings 2 22 Dec 17 Attachment 7 Sample Project MAHG16-1002 Drawings 2 28 Dec 17 (Alt I) Attachment 8 Sample Project MAHG16-1002 129 4 Aug 17 Mechanical Specifications Attachment 9 Sample Project MAHG16-1002 AF Form 1 Undated 66 Schedule of Material Submittals Attachment 10 Past Performance Reference List 1 Undated Attachment 11 Past Performance Questionnaire 2 Undated Attachment 12 Addendum 1 1 6 Apr 18 Attachment 13 Addendum 2 1 17 Apr 18

(End of Summary of Changes)