Repair Boilers Bldg 2001 Federal contract opportunity
Solicitation number
FA301017R0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Repair Boilers Bldg 2001, newest first.
File Type Posted
Attachment_9,_Addendum__1.pdf PDF
Attachment_4_-_PPQ.doc DOC document
Attachment_3_-_DWG.pdf PDF
Attachment_1_-_SoW.pdf PDF
Attachment_8_-_Wage_Determination.pdf PDF
Attachment_5_-_Reference_List.docx DOCX document
Attachment_2_-_Specifications.pdf PDF
Attachment_7_-__Notice_of_Compliance.pdf PDF
FA3010-17-R-0018_-_Repair_boilers_BLDG_2001.pdf PDF
Attachment_6_-_SF_1444.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J31D7143AW02 MAHG171008

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to notify offerors of the Questions & Answ ers from the site visit conducted on 10 July. Also, addendum #1 has been added to the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301017R0018

X 9B. DATED (SEE ITEM 11)

30-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2017

CODE

81ST CONTRACTING SQUADRON

TSGT THOMAS HUTCHINS

310 M STREET, RM 102

KEESLER AFB MS 39534-2701

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301017R0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

MAHG17-1008 Replace Domestic Water Heaters Questions & Answers

1. Could you clarify the sequence of operation for the two water heaters please? Will they be set up lead/lag, split time, etc.?

Answer: "The water heater control system shall be a Masterless Cascading design with no master-slave designation. The entire system shall have built-in usage optimization routine."

This, and more information, can be found in the project specifications.

REPLACE DOMESTIC WATER HEATERS BLDG. 2001 MAHG-1008

SECTION 22 52 16 HIGH EFFICIENCY GAS DOMESTIC WATER HEATERS

PART 3 CONTROLS

2. Item 11 on the Solicitation page states that the Contractor will have 120 days to complete the project after receiving the Notice to Proceed. However, on the General Conditions. the item 1.3 COMPLETION TIME states that the Contractor will have 180 days to complete the project after receiving the Notice to Proceed. Please advise the correct length for the project completion.

Answer: The contractor will have 120 days to complete the project after Notice to Proceed. Please refer to addendum #1.

3. The Specifications do not include DIVISION 1. Please clarify about the requirements of a Superintendent for the project.

Answer: At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

4. General Conditions item 1.16 Temporary Sanitary Facilities. Are temporary sanitary facilities required for the project or is the Contractor allowed to use the existing Government facilities?

Answer: The contractor will be allowed to use the existing Government facilities.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

List of Attachments:

Document Name Pages Dated

Attachment 1 Statement of Work 14 25‐May‐17

Attachment 2 Specifications 94 26‐Jun‐17

FA301017R0018

Attachment 3 Drawings 4 23‐Dec‐16

Attachment 4 PPQ 3 ND

Attachment 5 Reference List 1 ND

Attachment 6 SF 1444 3 ND

Attachment 7 Notice of Compliance 2 ND

Attachment 8 Wage Determination 5 10‐Mar‐17

Attachment 9 Addendum 1 1 26‐Jul‐17