MAHG151029_ADDENDUM_updated.pdf
PDF 66 KB Posted
- Attached to
- Renovate Connor Manor Bldg 6950 Federal contract opportunity
- Solicitation number
- FA3010-16-R-0007
About this file
Attachment 8 Addendum 001 dated 29 Apr 2016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3010-16-R-0007_Amendment_3.pdf | ||
| MAHG151029_ADDENDUM.pdf | ||
| Amendment_0002_Connor.pdf | ||
| Q_ _A_(2).pdf | ||
| Q_ _A.pdf | ||
| Site_Visit_Sign_In.pdf | ||
| Attachment_3_WD_MS160119.pdf | ||
| Amendment_No._1_FA3010-16-R-0007.pdf.pdf | ||
| Attachment_1_MAHG15-1029_SOW-SPECIFICATION_02.24.2016.pdf | ||
| FA3010-16-R-0007.pdf | ||
| Attachment_3_WD_MS160119.doc | DOC document | |
| Attachment_7_Notice_of_Compliance.doc | DOC document | |
| Attachment_6_SF_1444_instructions.doc | DOC document | |
| Attachment_2_MAHG15-1029_DRAWING_SET.pdf | ||
| Attachment_5_Past_Performance_Reference_List.rtf | RTF text file | |
| Attachment_4_Performance_Questionnaire.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAHG15-1029
April 29, 2016
ADDENDUM 001
The following (1) sheets have been changed in the construction documents for the following project:
MAHG15-1029 Repair Student Dorm B6950 Conner Manor
KEESLER AFB, MISSISSIPPI
Any information found within these documents shall take precedent over the information contained within the original construction documents. It is the responsibility of the contractor to review the documents and to include any revised or additional information in their bid.
I. Changes to Scope of Work:
A. SECTION 00 00 00 1.1 Scope. General- In addition to packing and moving the furniture, the Contractor will now be responsible for providing storage space for all removed furniture during the period of performance. Storage space will be clean, dry, and secure. Contractor to provide the Government the location of and accessibility to the proposed storage space during the period of performance. THE
STORAGE IS REQUIRED TO BE CLIMATE CONTROLLED, BONDED, AND INSURED
B. SECTION 16 50 00 LIGHTING, PART 2
Products, Paragraph B. line 2 and line 3 delete both light fixtures by Progress Lighting model Numbers P7378-30 and P7376.31 and add Lithonia FMLR14 2 18DTT or approved equal for fixtures L-2 and L-3.
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
File details come from the government source that posted it. Updated .