Combo Q and A.pdf
PDF 79 KB Posted
- Attached to
- Gym Equipment Federal contract opportunity
- Solicitation number
- FA286023Q4038
About this file
This document contains questions and answers regarding solicitation number FA286023Q4038 for gym equipment by the Department of the Air Force Headquarters District Washington. The questions and answers indicate that for the powerlifting rack package, the mounted cable cannot be in the middle of the rack, and there is no loading dock at the facility where the equipment will be installed, though there is one nearby on base. Additionally, no installation or removal of existing gym equipment, carting, etc. will be required, and there is no preference on whether the machines are branded or unbranded. The document also confirms that the rack will not be fixed in place on the floor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - 121 FS Gym Equipment.pdf | ||
| Salient Characteristics.pdf | ||
| 121 FS Logo.jpg | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
121 FS Gym Equipment – Q&A
Q: For the powerlifting rack package, can the mounted cable be in the middle of rack?
A: No
Q: Do you have a loading dock?
A: Not at the facility where the equipment will be installed, but nearby on base
Q: Any kind of installation or removal of existing gym equipment, carting etc. required?
Q: Do you prefer the machines branded or unbranded?
A: No preference
Q: Will the rack be fixed in place on the floor?
File details come from the government source that posted it. Updated .