Government_Statement_of_Work.pdf
PDF 31 KB Posted
- Attached to
- 1ST FLOOR CARPET REPLACEMENT BLDG 1612 Federal contract opportunity
- Solicitation number
- FA283519RA068
About this file
STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Government_Statement_of_Work.pdf | ||
| Solicitation_-_FA283519RA068.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Replace Carpet 1st Floor Location Building: 1612
By: Lenore Gerossie
WORK ORDER NUMBER:
DATED: 01 July 2019
1. GENERAL INFORMATION:
This project is intended to replace carpet 1st floor in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, Unified Facilities Criteria (UFC) state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB is prohibited for the purpose of entry and egress is prohibited. An alternative means is authorized (i.e. appropriate portable ladder/personnel lowering device).
2. SCOPE: Replace Carpet 1st Floor
• Remove approximately 21000 sq. ft. of carpet on 1st floor
• Remove cove base approximately 500 linear feet
• See attached drawing for reference
• Prepare the floors according to manufacturer’s instructions
• Contractor shall remove furniture and equipment in offices
• Install approximately 2333 square yds. of carpet tiles 24” x 24” 24 oz. multi-color nylon tufted, loop pile, level loop, needle bonded or fusion bonded.
• Install approximately 500 linear feet of cove base
• Reinstall furniture and equipment in offices
• Contractor will order carpet from one of the four following distributors below
• Contractor is responsible for the delivery charges
Company Contract Number POC Phone Web Site Shaw FA8057-1-C-0002 Farrah Finley 888-393-2830
Pin 2273 Base www.shawcontractgroup.com
J&J Flooring FA8057-17-C-0003 Kay Henderson 800-241-4586 x www.jjflooringgroup.com
Mohawk FA8057-17-C-0004 Anna.eigh Warmack
800-622-6228 x 46554 www.mohawkgroup.com
CMA-
Mililken
FA8057-17-C-0005 Paul Snyder/Betty King
888-669-9772 www.cma-gsa.com http://www.shawcontractgroup.com/ http://www.mohawkgroup.com/ http://www.cma-gsa.com/
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Any modifications and addition on a facility that contains Lightning Protections System (LPS) This includes paint projects, roofing projects, projects requiring roof penetrations, installation of new HVAC or other metallic equipment, antenna installation, or other work.
Additions and modifications to the facility envelope require re-evaluation of the LPS for the completed facility as a whole. The LPS required by the addition or modification shall not be a simple addition to the LPS. The LPS must be considered a single entity and must comply with requirements of a single LPS upon completion. The LPS shall be inspected by a commercial, third-party inspector whose sole work is lightning protection, and shall be certified by this third-party inspector as compliant with AFI 32-1065 and NFPA 780, in that priority order. Projects calling for an LPS addition to an existing LPS project shall consider the configuration of the final LPS in the initial design. Projects of this type shall ensure the final LPS as a whole is compliant with AFI 32-1065 and NFPA 780, in that priority order. The same third-party inspector requirements shall apply.
f. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form
g. Provide three (3) copies of O & M manuals and warranty letter
h. Period of Performance 90 days after award of contract
4. ADMINISTRATION:
Points of Contact (POC):
POC: Lenore Gerossie Phone Number. (781) 225-2960 Alternate POC: Roland Hartz Phone Number. (781) 225-5924
File details come from the government source that posted it.