Statement_of_Work.pdf

PDF 18 KB Posted

Attached to
Replace Breeching Insulation Federal contract opportunity
Solicitation number
FA2835-15-R-0034
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replace Breeching Insulation, newest first.
File Type Posted
Breeching_Insulation_photo_1.jpg JPG image
QA_fbo.pdf PDF
Breeching_Insulation_Photo_2.jpg JPG image
Solicitation_Amended_14_July_2015.pdf PDF
Solicitation_Updated_14_July_2015.pdf PDF
65859_Revised_Statement_of_Work.docx DOCX document
Solicitation.pdf PDF
Statement_of_Work.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

Replace Breeching Insulation Location Building: 1201

By: Roland Hartz

WORK ORDER NUMBER: 65859

DATED: 13 May 2015

1. GENERAL INFORMATION:

This project is intended to replace breeching insulation accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.

2. SCOPE: Replace insulation on breeching from the boiler to the plant stack on roof of steam plant (Approximately 200 SF)

• Prepare surface as needed for new material

• Install new breeching insulation

• Clean area when job is complete

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

d. Provide warranty letter

4. ADMINISTRATION:

Points of Contact (POC):

Lead: Roland Hartz Phone Number. (781) 225-2951 Alternate POC: William Neice Phone Number. (781) 225-6157

File details come from the government source that posted it. Updated .