65859_Revised_Statement_of_Work.docx
DOCX document 39 KB Posted
- Attached to
- Replace Breeching Insulation Federal contract opportunity
- Solicitation number
- FA2835-15-R-0034
About this file
Revised Statement of Work Revised 07 July 2015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Breeching_Insulation_photo_1.jpg | JPG image | |
| QA_fbo.pdf | ||
| Breeching_Insulation_Photo_2.jpg | JPG image | |
| Solicitation_Amended_14_July_2015.pdf | ||
| Solicitation_Updated_14_July_2015.pdf | ||
| Statement_of_Work.pdf | ||
| Solicitation.pdf | ||
| Statement_of_Work.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For Replace Breeching Insulation Location Building: 1201 By: Roland Hartz
WORK ORDER NUMBER: 65859
DATED: 13 May 2015 REVISED: 07 July 2015
1. GENERAL INFORMATION:
This project is intended to replace breeching insulation accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.
2. SCOPE: Replace insulation on breeching from the boiler to the plant stack on roof of steam plant (Approximately 800 SF)
· Prepare surface as needed for new material
· Install new breeching insulation
· Clean area when job is complete
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. Provide warranty letter
4. ADMINISTRATION: