Att 2 Statement of Work.pdf
PDF 112 KB Posted
- Attached to
- Heavy Equipment Rentals Federal contract opportunity
- Solicitation number
- FA282322Q4016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and Anwser.pdf | ||
| FA282322Q4016 Solicitation.pdf | ||
| Att 1 Clauses and Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – Heavy Equipment Rental
Project Title: Construct New Parking and Repair Drainage at Jackson Guard Date: 25 Feb 2022
SUMMARY OF WORK
1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above-mentioned project. The Contractor shall follow the guidelines provided herein. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.
2. SCOPE: The project is located at the Natural Resources Office - Jackson Guard, 107 Highway 85N, Niceville, Florida. The work consists of demolition, grading, stormwater collection system construction (including new inlets and RCP pipework), stormwater retention pond construction, expanded parking lots and new aggregate surfacing for portions of the heavy trafficked work area. The Contractor is required to provide heavy equipment specified herein.
This will include equipment delivery when the rental period starts and pick up at the end of rental period.
A. Two (2) Track Mounted Long Boom hydraulic excavator:
The excavator shall meet the requirements specified herein:
Boom: equal/greater than 32’ Stick: equal/greater 22” Bucket: equal/greater 1 cubic yard Red dye off-road diesel capable ROPS (Roll-over Protection System) Signaling / warning horn Working lights
Duration: One Month delivered NLT 4 April 2022
B. One (1) Steel-wheeled Tandem Drum Vibratory Roller:
The roller shall meet the requirements specified herein:
Double drum 1.7 tons-3 tons Roller Width: minimum of 35” Water system w/30 gal tank or greater for both drums Red dye off-road diesel l capable ROPS (Roll-Over Protection system) Signaling / warning horn Working lights
Duration: Two Months delivered 4 May 2022
3. SPECIAL INSTRUCTIONS:
a. Equipment shall be delivered to the project site, 107 Highway 85N, Niceville, Florida, by the contractor.
b. At the end of the rental period, equipment shall be picked up at the project site, 107 Highway 85N, Niceville, Florida, by the contractor.
c. Equipment delivered to the project site shall have a full tank of gas.
File details come from the government source that posted it. Updated .