Questions and Answers (11 May 21).pdf

PDF 210 KB Posted

Attached to
Spherical Near Field System Federal contract opportunity
Solicitation number
FA2823-21-Q-0018
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Spherical Near Field System, newest first.
File Type Posted
Attachment 1 - Solicitation - FA282321Q0018 (17 May 21).pdf PDF
Attachment 2 - TRD (17 May 21).pdf PDF
Attachment 1 - Solicitation - FA282321Q0018.pdf PDF
Attachment 2 - TRD (15 Apr 21).pdf PDF
Attachment 3 - Fillable Reps and Certs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In reference to Attachment 2 of solicitation FA2823-21-Q-0018, I would like some clarification on item 1.e.: Must support antenna measurements from 500 MHz to 50 GHz in coax and up to 110 GHz using waveguide extensions

Does the quote need to include the equipment required to support measurements up to 110 GHz or have the ability with future upgrades to support up to 110 GHz?

Asked in another way, what is the maximum operational frequency of the system at initial purchase?

The quote does not need to include the equipment required to support up to 110 GHz measurements.

Up to 50 GHz Maximum Operational Frequency at initial purchase is fine.

File details come from the government source that posted it. Updated .