Attach_1_-_SOW_(15_Nov_13)-.pdf
PDF 121 KB Posted
- Attached to
- FA2823-15-R-4009* Construct RIG Facility, Site C-3, Eglin AFB Federal contract opportunity
- Solicitation number
- FA2823-15-R-4001
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Interested_Vendor_List.pdf | ||
| RFI_Responses_for_RIG-19_March_2015_with_Pictures.pdf | ||
| Interested_Vendor_List.pdf | ||
| FA2823-15-R-4009-03_Amendment_3_CONFORM.pdf.doc.pdf | ||
| FA2823-15-R-4009-03_Amendment_3.pdf.doc.pdf | ||
| FA2823-15-R-4009-02_Amendment_2.pdf | ||
| FA2823-15-R-4009-01_Amendment.pdf | ||
| FA2823-15-R-4009-SOLICITATION.pdf | ||
| ATTACHMENT_E_-_Drawings_ _Specs.pdf | ||
| 121174_SPEC_CONSTRUCT_RIG_FACILITY.pdf | ||
| Attach_2 3_-_Drawings_ _Specs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
CONSTRUCT RIG FACILITY
SITE C-3
FTFA 12 1174
SPEC. # 13AF
DRAWING # 13AF
Statement of Work
Eglin Air Force Base
Florida
15 November 2013
Attachment 1
STATEMENT OF WORK
FTFA121174, CONSTRUCT RIG FACILITY SITE C-3
1.1 GENERAL INTENTION
It is the declared and acknowledged intention and meaning to provide and secure the construction for the Construct Rig Facility Site C-3 FTFA 12-1174, Eglin Air Force Base, Florida.
1.2 GENERAL DESCRIPTION
In general, the work consists of the following:
Construct new conditioned concrete masonry building with metal roof, interior galvanized metal stud walls with gypsum board painted finish, acoustical and gypsum board ceilings, floor and wall finishes, toilet facilities, server room, training room, workroom, offices and storage. Miscellaneous specialties include signage, fire extinguishers, shelving, etc). Support utilities include lighting, security, plumbing and HVAC systems.
The above general description of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, materials, and equipment complete in accordance with the plans and specifications.
1.3 NOTICE OF CHANGE TO DRAWING AND SPECIFICATIONS
In the Drawings and Specifications, references to “Option 1” are to be changed to read “Additive 2”.
1.4 ADDITIVES
ADDITIVE 1: Use integrally colored split face cmu in lieu of painted smooth face cmu.
ADDITIVE 2: Construction of building with larger square footage in lieu of smaller building called for in Base Bid.
1.5 LOCATION
The work shall be located at Site C-3, Eglin Air Force Base, Florida. The exact location of the facility is indicated on the drawings.
1.6 PERIOD OF PERFROMANCE
The Period of Performance will be 300 calendar days.