121174_SPEC_CONSTRUCT_RIG_FACILITY.pdf

PDF 1 MB Posted

Attached to
FA2823-15-R-4009* Construct RIG Facility, Site C-3, Eglin AFB Federal contract opportunity
Solicitation number
FA2823-15-R-4001
Issued by
Department of the Air Force Materiel Command Test Center

About this file

RIG Facility Specifications

View the file

Other files for this federal contract opportunity

Other files attached to FA2823-15-R-4009* Construct RIG Facility, Site C-3, Eglin AFB, newest first.
File Type Posted
Interested_Vendor_List.pdf PDF
RFI_Responses_for_RIG-19_March_2015_with_Pictures.pdf PDF
Interested_Vendor_List.pdf PDF
FA2823-15-R-4009-03_Amendment_3_CONFORM.pdf.doc.pdf PDF
FA2823-15-R-4009-03_Amendment_3.pdf.doc.pdf PDF
FA2823-15-R-4009-02_Amendment_2.pdf PDF
FA2823-15-R-4009-01_Amendment.pdf PDF
FA2823-15-R-4009-SOLICITATION.pdf PDF
ATTACHMENT_E_-_Drawings_ _Specs.pdf PDF
Attach_2 3_-_Drawings_ _Specs.pdf PDF
Attach_1_-_SOW_(15_Nov_13)-.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT RIG FACILITY

SITE C-3

FTFA 12 1174

SPEC.# 13AF

DRAWING# 13AF

CONTRACT NO. FA 2823-09-D-0003

PROJECT MANUAL

Eglin Air Force Base

Florida

EMI# 52812

15 November 2013

CONSTRUCT RIG FACILITY SITE C-3 FTFA 12-1174

SPEC NO. 13AF

TABLE OF CONTENTS 00 01 10-1

CONSTRUCT RIG FACILITY SITE C-3

FTFA 121174

EGLIN AIR FORCE BASE, FLORIDA

PROJECT MANUAL

EMI Project No. 52812 15 November 2013

Section # Section Title Pages

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 TABLE OF CONTENTS 00 01 10-1 thru 00 01 10-4

DIVISION 01 - GENERAL REQUIREMENTS

01 11 13 GENERAL PARAGRAPHS 01 11 13-1 thru 01 11 13-2 01 33 00 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 00-1 thru 01 33 00-3 AF FORM 66 SCHEDULE OF MATERIAL SUBMITTALS 7 Pages 01 35 43 GENERAL ENVIRONMENTAL PROTECTION 01 35 43-1 thru 01 35 43-3 01 35 44 ENVIRONMENTAL PROTECTION 01 35 44-1 thru 01 35 44-6 01 42 00 REFERENCES 01 42 00-1 thru 01 42 00-8 01 42 10 REFERENCE STANDARDS AND DEFINITIONS 01 42 10-1 thru 01 42 10-11 015719 EROSION CONTROL AND ENVIRONMENTAL PROTECTION 015719-1 thru 015719-6 01 73 00 EXECUTION 01 73 00-1 thru 01 73 00-10 01 74 23 CLEANING 01 74 23-1 thru 01 74 23-2

DIVISION 03 - CONCRETE

03 20 00 CONCRETE REINFORCEMENT 03 20 00-1 thru 03 20 00-3 03 30 00 CAST-IN-PLACE CONCRETE 03 30 00-1 thru 03 30 00-6 03 35 00 CONCRETE FLOOR FINISHING 03 35 00-1 thru 03 35 00-3 03 39 00 CONCRETE CURING 03 39 00-1 thru 03 39 00-2

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY 04 20 00-1 thru 04 20 00-10

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL 05 12 00-1 thru 05 12 00-4 05 31 00 METAL DECKING 05 31 00-1 thru 05 31 00-4 05 44 00 METAL TRUSSES AND FRAMING 05 44 00-1 thru 05 44 00-12 05 50 00 METAL FABRICATIONS 05 50 00-1 thru 05 50 00-7

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 ROUGH CARPENTRY 06 10 00-1 thru 06 10 00-6

TABLE OF CONTENTS 00 01 10-2

Section # Section Title Pages

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING 07 11 13-1 thru 07 11 13-4 07 21 00 THERMAL INSULATION 07 21 00-1 thru 07 21 00-2 07 41 13.13 STANDING-SEAM METAL ROOF PANELS 07 41 13.13-1 thru 07 41 13.13-9 07 62 00 SHEET METAL FLASHING AND TRIM 07 62 00-1 thru 07 62 00-3 07 71 00 ROOF SPECIALTIES 07 71 00-1 thru 07 71 00-6

07 84 13 PENETRATION FIRESTOPPING 07 84 13-1 thru 07 84 13-5 07 92 00 EXTERIOR JOINT SEALANTS 07 92 00-1 thru 07 92 00-6 07 92 10 INTERIOR JOINT CAULKING 07 92 10-1 thru 07 92 10-5

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES 08 11 13-1 thru 08 11 13-9 08 31 13 ACCESS DOORS AND FRAMES 08 31 13-1 thru 08 31 13-2 08 33 23 OVERHEAD COILING DOORS 08 33 23-1 thru 08 33 23-3 08 71 00 DOOR HARDWARE 08 71 00-14 thru 08 71 00-7

DIVISION 09 - FINISHES

09 29 10 GYPSUM BOARD & NON-STRUCTURAL METAL FRAMING 09 29 00-1 thru 09 29 00-10 09 30 13 CERAMIC TILING 09 30 13-1 thru 09 30 13-3 09 51 13 ACOUSTICAL PANEL CEILINGS 09 51 13-1 thru 09 51 13-6 09 65 13 RESILIENT BASE AND ACCESSORIES 09 65 13-1 thru 09 65 13-4 09 65 19 RESILIENT TILE FLOORING 09 65 19-1 thru 09 65 19-2 09 68 13 TILE CARPETING 09 68 13-1 thru 09 69 13-4 09 91 00 PAINTING 09 91 00-1 thru 09 91 00-8

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS 10 11 00-1 thru 10 11 00-5 10 14 23 PANEL SIGNAGE 10 14 23-1 thru 10 14 23-3 10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES 10 28 00-1 thru 10 28 00-

10 41 16 EMERGENCY KEY CABINETS 10 41 16-1

10 44 13 FIRE EXTINGUISHERS, CABINETS AND ACCESSORIES 10 44 13-1 thru 10 44 13-2

10 57 23 CLOSET & UTILITY SHELVING 10 57 23-1

DIVISION 12 - FURNISHINGS

12 36 23.13 PLASTIC-LAMNINATE-CLAD COUNTERTOPS 12 36 23.13 -1 thru 12 36 23.13-6

& BASE CABINETS

TABLE OF CONTENTS 00 01 10-3

DIVISION 21 – FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKER SYSTEM 21 13 13.00 10-1 thru 21 13 13.00 10-5

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE 22 00 00-1 thru 22 00 00-31

DIVISION 23 – MECHANICAL

23 03 00.00 20 MECHANICAL GENERAL REQUIREMENTS 23 03 00.00 20-1 thru 23 03 00.00 20-5 23 05 93 TESTING, ADJUSTING, AND BALANCING 23 05 93-1 thru 23 05 93-4 23 07 13 DUCTWORK INSULATION 23 07 13-1 thru 23 07 13-5 23 07 19 PIPIING INSULATION 23 07 19-1 thru 23 07 19-5 23 08 00 COMMISSIONING HVAC SYSTEM 23 08 00-1 thru 23 08 00-17 23 31 00 DUCTWORK 23 31 00-1 thru 23 21 00-5 23 33 00 DUCTWORK ACCESSORIES 23 33 00-1 thru 23 33 00-4 23 34 23 POWER VENTILATORS 23 34 23-1 thru 23 34 23-2 23 37 00 AIR OUTLETS AND INLETS 23 37 00-1 thru 23 37 00-3 23 81 26 SPLIT-SYSTEM HEAT PUMPS 23 81 26-1 thru 23 81 26-8

DIVISION 26 – ELECTRICAL

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS 26 12 19.10-1 thru 26 12 19.10-9 26 20 00 INTERIOR DISTRIBUTION SYSTEM 26 20 00-1 thru 26 20 00-13 26 51 00 INTERIOR LIGHTING 26 51 00-1 thru 26 51 00-7

DIVISION 27 – COMMUNICATIONS

27 10 00 COMMUNICATIONS DISTRIBUTION SYSTEM 27 10 00-1 thru 27 10 00-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM 28 31 76-1 thru 28 31 76-28

DIVISION 33 - UTILITIES

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND 33 70 02.00 10-1 thru 33 70 02.00 10-14 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION 33 71 01-1 thru 33 71 01-12

TABLE OF CONTENTS 00 01 10-4

DIVISION 31 – EARTHWORK

31 00 00 EXCAVATION, FILLING, AND COMPACTION FOR

STRUCTURES 31 00 00-1 thru 31 00 00-5 312000 EARTHWORK 312000-1 thru 312000-8 31 31 16 TERMITE CONTROL 31 31 16-1 thru 31 31 16-4

DIVISION 33 - UTILITIES

331000 WATER UTILITIES 331000-1 thru 331000-12 333000 SANITARY SEWERAGE FACILITIES 333000-1 thru 333000-12

END OF TOC

CONSTRUCT RIG FACILITY SITE C-3 FTFA 12 - 1174

GENERAL PARAGRAPHS 01 11 13-1

SECTION 01 11 13 - GENERAL PARAGRAPHS

PART 1 - GENERAL

1.1 GENERAL INTENTION

It is the declared and acknowledged intention and meaning to provide and secure the construction for the Construct Rig Facility Site C-3 FTFA 12-1174, Eglin Air Force Base, Florida.

1.2 GENERAL DESCRIPTION

In general, the work consists of the following:

Construct new conditioned concrete masonry building with metal roof, interior galvanized metal stud walls with gypsum board painted finish, acoustical and gypsum board ceilings, floor and wall finishes, toilet facilities, server room, training room, workroom, offices and storage. Miscellaneous specialties include signage, fire extinguishers, shelving, etc). Support utilities include lighting, security, plumbing and HVAC systems. Refer to the Table of Contents (TOC) for work to be done.

*********************ATTENTION************************

IN THE FOLLOWING DOCUMENT, REFERENCES TO “OPTION 1” ARE TO BE

CHANGED TO READ: “ADDITIVE 2”.

AND, THE FOLLOWING BRIEF SUMMARY NOTES ARE ADDED:

ADDITIVE 1: USE INTEGRALLY COLORED SPLIT FACE CMU IN LIEU OF PAINTED

SMOOTH FACE CMU.

ADDITVE 2: CONSTRUCTION OF BUILDING WITH LARGER SQUARE FOOTAGE IN

LIEU OF SMALLER BUILDING CALLED FOR IN BASE BID.

The above general description of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, materials, and equipment complete in accordance with the plans and specifications.

1.3 LOCATION

The work shall be located at Site C-3, Eglin Air Force Base, Florida. The exact location of the facility is indicated on the drawings.

1.4 RECORD DRAWINGS

The Contractor shall maintain at the job site two sets of full size contract drawings, marking them in red to show all variations between the construction actually provided and that indicated or specified in the contract documents, including buried or concealed construction. Where a choice of materials or method is permitted herein, or where variations in scope or character of work from that of the original contract are authorized, the drawings shall be marked to define the construction actually provided.

The representations of such changes shall conform to standard drafting practice and shall include such supplementary notes, legends, and details as necessary to clearly portray the as-built construction. On completion of work, this as-built information shall be electronically posted to create an “as-built” electronic set of drawings in AutoCad 2011 an one full size mylar copy of the electronic

GENERAL PARAGRAPHS 01 11 13-2

drawings and both sets of marked-up drawings shall be delivered to the Contracting Officer, and shall be subject to his approval before acceptance.

1.5 STORM PROTECTION

Should warnings of wind of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize danger to persons, to the work, and to adjacent property. These precautions shall include closing all openings, removing all loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work.

1.6 INTERFERENCE WITH STATION OPERATIONS

Permission to interrupt any station utility, communication, operational or traffic service or pattern shall be requested in writing at least 10 days prior to the date of the desired interruption. The Contractor shall receive approval in writing from the Contracting Officer before the requested interruption may be put into effect.

1.7 SUBMITTALS

Submission of all AF form 3000, Material Approval Submittals, shall be completed within 10 days or sooner after issuance of notice to proceed unless specified differently on the AF Form 66, Schedule of Material Submittals.

1.8 CHEMICAL LATRINE

The Contractor shall provide, at no additional cost to the government, a minimum of one chemical latrine per 12 workmen. The latrine(s) will be at the job site for the duration of the contract performance period. The latrine(s) shall be serviced as often as required for sanitary conditions but in no case shall servicing be less than once per week. Servicing shall comply with all applicable federal, state and local laws, ordinances and regulations. The latrine waste shall be disposed of legally off government lands.

1.9 APPLICABLE PUBLICATIONS/REGULATIONS

Publications referred to in the statement of work may include reference dates that do not reflect the current status of the publication. Unless otherwise stated in the statement of work (this will be accomplished by stating, “compliance is required with this publication versus any other version”), the current publication is the applicable publication. Where the statement of work further refers to deviations from these publications, these deviations will be applied to the current publication.

1.10 DRAWINGS AND SPECIFICATIONS

The drawings and specifications shall be considered as supplementary, one to the other, so that materials and labor indicated, called for or implied by the one and not by the other, shall be supplied and installed as though specifically called for by both.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

END OF SECTION 01 11 13

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 33 00-1

SECTION 01 33 00 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

PART 1 GENERAL

a. The Contractor shall submit certain items, information, and tests for approval on an AF 3000, Material Approval Submittal Form. Shop drawings and certificates shall be submitted prior to fabrication and commencement of work insofar as possible. All items requiring approval shall be submitted in a timely manner and conform to work schedule.

Submit all related items of a section or items that are dependent on each other at the same time for coordination. In lieu of the Underwriter's inspection label, the Contractor may submit a certified test report from any nationally recognized testing agency acceptable to the Contracting Officer and adequately equipped and competent to perform such services. Unless otherwise specified, costs of all items requiring approval shall be at the Contractor's expense. Where tests by an independent testing laboratory are required, the original copies of test reports shall be sent by the testing laboratory directly to the Contracting Officer. Manufacturing cut sheets, technical data, etc. to indicate material meets or exceed specification requirements.

b. The items to be submitted have been summarized for convenience on the attached Air

Force Form 66. Additional submittals may be required if stated in specifications.

1.1 SCHEDULE OF SUBMITTAL DESCRIPTIONS (SD)

SD-02, Manufacturer's Catalog Data

Data composed of catalog cuts, brochures, circulars, specifications and product data, and printed information in sufficient detail and scope to verify compliance with requirements of the contract documents. A type of product data.

SD-03, Manufacturer's Standard Color Charts

Preprinted illustrations displaying choices of color and finish for a material or product. A type of product data.

SD-04, Drawings

Submittals which graphically show relationship of various components of the work, schematic diagrams of systems, detail of fabrications, layout of particular elements, connections, and other relational aspects of the work. A type of shop drawing.

SD-05, Design Data

Design calculations, mix designs, analyses, or other data, written in nature and pertaining to a part of the work. A type of shop drawing.

SD-06, Instructions

Preprinted material describing installation of a product, system, or material, including special notices and Material Safety Data Sheets, if any, concerning impedances, hazards, and safety precautions. A type of product data.

SD-07, Schedules

A tabular list of data or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work. A type of shop drawing.

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 33 00-2

SD-08, Statements

A document, required of the Contractor, or through the Contractor by way of a supplier, installer, manufacturer, or other lower tier contractor, the purpose of which is to further the quality or orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel, qualifications, or other verification of quality. A type of shop drawing.

SD-10, Test Reports

A report signed by an authorized official of a testing laboratory that a material, product, or system identical to the material, product or system to be provided has been tested in accordance with requirements specified by naming the test method and material. The test report must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test. Testing must have been within three years of the date of award of this Contract. A type of product data.

SD-11, Factory Test Reports

A written report which includes the findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for this project before it is shipped to the job site. The report must be signed by an authorized official of a testing laboratory and must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test. A type of shop drawing.

SD-12, Field Test Reports

A written report which includes the findings of a test made at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation. The report must be signed by an authorized official of a testing laboratory or agency and must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test. A type of shop drawing.

SD-13, Certificates

Statements signed by responsible officials of a manufacturer of a product, system, or material attesting that the product, system, or material meet specified requirements. The statements must be dated after the award of this contract, name the project, and list the specific requirements which it is intended to address. A type of shop drawing.

SD-14, Samples

Samples, including both fabricated and unfabricated physical examples of materials, products, and units of work as complete units or as portions of units of work. A type of sample.

SD-15, Color Selection Samples

Samples of the available choice of colors, textures, and finishes of a product or material, presented over substrates identical in texture to that proposed for the work. A type of sample.

SD-18, Records

Documentation to ensure compliance with an administrative requirement or to establish an administrative mechanism. A type of administrative submittal.

SD-19, Operation and Maintenance Manuals

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 33 00-3

Data intended to be incorporated in an Operations and Maintenance Manual. A type of administrative submittal.

PART 2 PRODUCTS

PART 3 EXECUTION

END OF SECTION

PROJECT NUMBER PROJECT TITLE SOLICITATION CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS FTFA 11-3904 Repair & Renovate Bldg 1325

TO BE COMPLETED BY THE ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

IT

E

M O

R D

E S

C R

IP

T

IO

N

O F

I T

E M

C O

N T

R A

C T

R E

F E

R E

N C

E

T Y

P E

O F

S U

B M

IT

T

A L

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C E

R T

IF

IC

A T

IO

N

O F

F

IN

A L

C O

M P

LE

T

IO

N

C O

LO

R

S E

LE

C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

LO

G

D A

T A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

R E

P O

R T

S

C A

LC

U

LA

T

IO

N

S A

N D

R E

C O

R D

S

S T

A T

E M

E N

T S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D A

T E

D A

T E

R E

C E

IV

E

D I

N

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

D A

T E

C O

N T

R A

C T

O R

N O

T

IF

IE

D

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

Section 01010, Para 1.4 Prior to

1 Record Drawings 1 Final com

Section 01010, Para 1.7 10 days

2 Submittals - AF Form 66 5 after ntp

Section 01045, Para 1.3

4 Submittals 5 5

Section 01421, Para 1.6

5 Submittals 2

Section 01560, Para 1.3.1

6 Statements 5

Section 01732, Para 1.4

7 Submittals 5 5

Section 02282, Para 1.3B

8 Certification 5

Section 04 20 00, Para 1.2

9 Action Submittals 5 5

Section 051010, Para 1.02

10 Submittals 5

Section 06100, Para 1.04

11 Submittals 5 5

* -- Submit to government no later than 10 working days after NOTICE TO PROCEED (NTP).

** -- Submit to government no later than 20 working days after NTP. A BLANK SPACE indicates submission to the gov't AS WORK PROGRESSES.

All submittals of samples of materials (exterior and/or interior finishes) shall be submitted in one package, at one time, by the applicable required submittal date indicated.

AF Form 66 PREVIOUS EDITION WILL BE USED 1

SCHEDULE OF MATERIAL SUBMITTALS 093964B Renovate Bldg 1312 Phase II

TO BE COMPLETED BY THE ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

IT

E

M O

R D

E S

C R

IP

T

IO

N

O F

I T

E M

C O

N T

R A

C T

R E

F E

R E

N C

E

T Y

P E

O F

S U

B M

IT

T

A L

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C E

R T

IF

IC

A T

IO

N

O F

F

IN

A L

C O

M P

LE

T

IO

N

C O

LO

R

S E

LE

C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

LO

G

D A

T A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

R E

P O

R T

S

C A

LC

U

LA

T

IO

N

S A

N D

R E

C O

R D

S

S T

A T

E M

E N

T S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D A

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

D A

T E

C O

N T

R A

C T

O R

N O

T

IF

IE

D

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

Section 07210, Para 10.5

11 Submittals 5 3 5

Section 07615, Para 1.04

12 Submittals 3

Section 07901, Para 1.04

13 Submittals 5 3 3 5 5 5

Section 07902 Para 1.03

14 Submittals 5 3 5 5 5

Section 08110 Para 1.3

15 Information Submittals 5

Section 08110 Para 1.4

16 Action Submittals 5 5

Seciton 08305, Para 1.03

17 Submittals 5 5

Section 08520, Para 1.03

18 Submittals 5 5 5 5

Section 08710, Para 1.3

19 Submittals 5 5

Section 08800, Para 1.05

20 Submittals 5 3 5 5

* -- Submit to government no later than 10 working days after NOTICE TO PROCEED (NTP).

** -- Submit to government no later than 20 working days after NTP. A BLANK SPACE indicates submission to the gov't AS WORK PROGRESSES.

All submittals of samples of materials (exterior and/or interior finishes) shall be submitted

AF Form 66 PREVIOUS EDITION WILL BE USED 2

TO BE COMPLETED BY THE ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

IT

E

M O

R D

E S

C R

IP

T

IO

N

O F

I T

E M

C O

N T

R A

C T

R E

F E

R E

N C

E

T Y

P E

O F

S U

B M

IT

T

A L

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C E

R T

IF

IC

A T

IO

N

O F

F

IN

A L

C O

M P

LE

T

IO

N

C O

LO

R

S E

LE

C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

LO

G

D A

T A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

R E

P O

R T

S

C A

LC

U

LA

T

IO

N

S A

N D

R E

C O

R D

S

S T

A T

E M

E N

T S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D A

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

D A

T E

C O

N T

R A

C T

O R

N O

T

IF

IE

D

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

Section 0830, Para 1.3

21 Submittals 5 3 3 5

Section 09255, Para 1.3.

22 Submittals 5 5 5

Section 09300 Para 1.5

24 Action Submittals 5 3 5

Section 09511, Para 1.3

25 Submittals 3 5 5

Section 09652, Para 1.4

26 Submittals 3 5 5

Section 09660, Para 1.02

27 Submittals 3 5

Section 09678,B116 Para 1.5

28 Submittals 5 3 5

Section 09800, Para 1.02

29 Submittals 3 5

* -- Submit to government no later than 10 working days after NOTICE TO PROCEED (NTP).

** -- Submit to government no later than 20 working days after NTP. A BLANK SPACE indicates submission to the gov't AS WORK PROGRESSES.

All submittals of samples of materials (exterior and/or interior finishes) shall be submitted

AF Form 66 PREVIOUS EDITION WILL BE USED 3

TO BE COMPLETED BY THE ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

IT

E

M O

R D

E S

C R

IP

T

IO

N

O F

I T

E M

C O

N T

R A

C T

R E

F E

R E

N C

E

T Y

P E

O F

S U

B M

IT

T

A L

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C E

R T

IF

IC

A T

IO

N

O F

F

IN

A L

C O

M P

LE

T

IO

N

C O

LO

R

S E

LE

C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

LO

G

D A

T A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

R E

P O

R T

S

C A

LC

U

LA

T

IO

N

S A

N D

R E

C O

R D

S

S T

A T

E M

E N

T S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D A

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

D A

T E

C O

N T

R A

C T

O R

N O

T

IF

IE

D

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

Section 09900, Para 1.3

31 Submittals 3 5

Section 10001 Para 1.C

32 Product Data, Shop Dwgs 5 5

Section 10 21 13, Para 1.2

33 Information Submittals 5 5

Section 10 21 13, Para 1.3

34 Action Submittals 3

Section 10425, Para 2.1C

35 Action Submittals 5 3 5

Section 10505, Para 1.3

36 Action Submittals 5

Section 10522, Para 1D

Submittals 5

Section 10 73 13, Para 1.04

38 Submit ttals 5 3

* -- Submit to government no later than 10 working days after NOTICE TO PROCEED (NTP).

** -- Submit to government no later than 20 working days after NTP. A BLANK SPACE indicates submission to the gov't AS WORK PROGRESSES.

All submittals of samples of materials (exterior and/or interior finishes) shall be submitted

AF Form 66 PREVIOUS EDITION WILL BE USED 4

TO BE COMPLETED BY THE ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B E

R

IT

E

M O

R D

E S

C R

IP

T

IO

N

O F

I T

E M

C O

N T

R A

C T

R E

F E

R E

N C

E

T Y

P E

O F

S U

B M

IT

T

A L

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C E

R T

IF

IC

A T

IO

N

O F

F

IN

A L

C O

M P

LE

T

IO

N

C O

LO

R

S E

LE

C

T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

LO

G

D A

T A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

R E

P O

R T

S

C A

LC

U

LA

T

IO

N

S A

N D

R E

C O

R D

S

S T

A T

E M

E N

T S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D A

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

D A

T E

C O

N T

R A

C T

O R

N O

T

IF

IE

D

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

Section 10800, Para 1.03

41 Submittals 5

Section 11484, Para 1.2

42 Submittals 5 3 5

Section 13 34 19, Para 1.2

43 Submittals 5 5 3 5

* -- Submit to government no later than 10 working days after NOTICE TO PROCEED (NTP).

** -- Submit to government no later than 20 working days after NTP. A BLANK SPACE indicates submission to the gov't AS WORK PROGRESSES.

All submittals of samples of materials (exterior and/or interior finishes) shall be submitted

AF Form 66 PREVIOUS EDITION WILL BE USED 5

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS FTFA 11-3904 REPAIR & RENOVATE BUILDING 1325

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D

IN

N

T R

A C

T

IN

G

D A

T E

T O

C

IV

IL

E

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S

A T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

R

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

INTERIOR FA/MN SYSTEM

SEC 13859 PAR 1.2 5 5 5 5 5 5 5

MATERIALS & EQUIPMENT

SEC 15010 PAR 1.8 5 5 5

COMMISSIONING HVAC

SEC 15056 PAR 2 & 5 5 5 5 5

PIPING INSULATION

SEC 15261 PAR 1.4 5 5

JACKETS & ACCESSORIES

SEC 15261 PAR 1.4 5 5

DUCTWORK INSULATION

SEC 15291 PAR 1.4 5 5

INSULATION JACKETS

SEC 15291 PAR 1.4 5 5

WET PIPE SPRINK SYS

SEC 15325 PAR 1.5 AND 1.6 5 5 5

5 5 5 5

DESIGN, INSTALL AND CERT

SEC 15325 PAR 1.5 AND 1.6 5 5 5

5 5 5 5

FIRE DEPARTMENT CONNECT

SEC 15325 PAR 1.5 AND 1.6 5 5 5

5 5 5 5

PLUMBING

SEC 15400 PAR 1.4 5 5

HEAT PUMP UNIT

SEC 15671 PAR 1.4 5 5 5

REFRIGERANT PIPING

SEC 15671 PAR 1.4 5 5 5

S D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED 01340 - 2

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

CEILING EXHAUST FANS

SEC 15870 PAR 1.4 5 5

AIR COILS

SEC 15790 PAR 1.4 5 5

AIR HANDLING UNITS

SEC 15855 PAR 1.3 5 5 5

POWER VENTILATORS

SEC 15870 PAR 1.4 5 5

INSULATED FLEXIBLE DUCT

SEC 15890 PAR 1.4 5

GAL STEEL DUCT MATERIAL

SEC 15890 PAR 1.4 5

SINGLE WALL SPIRAL

SEC 15890 PAR 1.4 5

DUCT SEALER

SEC 15890 PAR 1.4 5

AIR TURNING DEVICES

SEC 15910 PAR 1.4 5 5 5

BACKDRAFT DAMPERS

SEC 15910 PAR 1.4 5 5 5

DUCT ACCESS DOORS

SEC 15910 PAR 1.4 5 5 5

DUCT TEST HOLES

SEC 15910 PAR 1.4 5 5 5

FLEXIBLE DUCT CONNECT

SEC 15910 PAR 1.4 5 5 5

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED 01340 - 3

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

VOLUME CONTROL DAMPERS

SEC 15910 PAR 1.4 5 5 5

SUPPLY REGISTERS

SEC 15940 PAR 1.4 5

RETURN REGISTERS

SEC 15940 PAR 1.4 5

RETURN GRILLES

SEC 15940 PAR 1.4 5

TEST, ADJUST, BALANCE

SEC 15990 PAR 1.4 5

3 PHASE PAD MOUNT TRANS

SEC 16272 PAR 1.3 5

UNDERGRD TRANS DIST

SEC 16302 PAR 1.4 5

INTERIOR DIST SYSTEM

SEC 16402 PAR 1.3 5

INTERIOR LIGHTING

SEC 16510 PAR 1.4 5

COMMUNICATIONS SYS

SEC 16710 PAR 1.5

5 5

LIGHTINING PROT SYSTEM

SEC 16750 PAR 1.2 5 5

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED 01340 - 4

AF FORM 66 Page 1

AF FORM 66 – SCHEDULE OF MATERIAL SUBMITTALS

The following pages contain listing of material submittals represented by the specifications.

SCHEDULE OF MATERIAL SUBMITTALS FTFA 12-1174 CONSTRUCT RIG FACILITY SITE C-3

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

ENVIRONMENTAL PROTECTION

SEC 01 35 44 PAR 1.3 5

EROSION CONTROL SEC

015719 PAR 1.4 5

EXECUTION SEC 01 73 00 PAR

1.4 5 5

CONCRETE REINFORCEMENT

SEC 03 20 00 PAR 1.04 & 1.05 5 5 5

CAST-IN-PLACE CONCRETE SEC

03 30 00 PAR 1.04 & 1.05 5 5

CONCRETE FLOOR FINISHING

SEC 03 35 00 PAR 1.04 & 1.05 5 5

UNIT MASONRY SEC 04 20 00 PAR

1.2 5 5 5 5

STRUCTURAL STEEL SEC 05

12 00 PAR 1.04 & 1.05 5 5 5

METAL DECKING SEC 05 31 00

PAR 1.05 & 1.06 5 5 5

METAL TRUSSES AND FRAMING

SEC 05 44 00 PAR 1.4 5 5 5 5 5

METAL FABRICATIONS

SEC 05 50 00 1.4 & 1.5 5 5

ROUGH CARPENTRY

SEC 06 10 00 PAR 1.4 & 1.5 5 5 5

BITUMINOUS DAMPPROOFING

SEC 07 11 13 PAR 1.3 5

S D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

AF Form 66, OCT 89 Page 2

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

STANDING-SEAM METAL ROOF

PANELS SEC 07 41 13.13

PAR 1.0 & 1.04 5 5 5 5 5 5

ROOF SPECIALTIES

SEC 07 71 00 PAR 1.3 & 1.4 5 5 5 5

PENETRATION FIRESTOPPING

SEC 07 84 13 PAR 1.3 & 1.4 5 5 5

EXTERIOR JOINT SEALANTS

SEC 07 92 00 PAR 1.04 5 5 5 5 5 5 5

INTERIOR JOINT CAULKING SEC

07 92 10 PAR 1.03 5 5 5 5 5 5 5

HOLLOW METAL DOORS AND

FRAMES SEC 08 11 13 PAR 1.6 &

1.7 5 5 5 5 5

ACCESS DOORS SEC 08 31 13

PAR 1.03 5 5

OVERHEAD COILING DOORS SEC

08 33 23 PAR 1.3 5 5 5 5

DOOR HARDWARE

SEC 08 71 00 PAR 1.02 5 5 5 5 5 5

GYPSUM BOARD & NON-

STRUCTURAL METAL FRAMING

SEC 09 29 10 PAR 1.3 5 5 5

CERAMIC TILING SEC 09 30 13

PAR 1.4 5 5 5

ACOUSTICAL PANEL CEILINGS

SEC 09 51 13 PAR 1.3 5 5 5

AF Form 66, OCT 89 Page 3

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

RESILIENT BASE & ACCESSOR

SEC 06 65 13 PAR 1.5 5 5 5

RESILIENT TILE FLOORING SEC

09 65 19 PAR 1.02 5 5 5

TILE CARPETING SEC 09 68 13

PAR 1.3 & 1.8 5 5 5 5 5

29 PAINTING SEC 09 91 00 PAR 1.3 5 5

VISUAL DISPLAY UNITS SEC

10 11 00 PAR 1.3 & 1.4 5 5 5 5

PANEL SIGNAGE SEC 10 14 23

PAR 1.1C 5 5 5

TOILET, BATH & LAUNDRY

ACCESSORIES SEC 10 28 00

PAR1.3 & 1.4 5 5

EMERGENCY KEY CABINET SEC

10 41 16 PAR 1.03 5 5

FIRE EXTINGUISHERS, CABINETS

& ACCESSORIES SEC 10 43 13

PAR PART 1.D 5

CLOSET & UTILITY SHELVING

SEC 10 57 23 PAR PART 1C 5 5

36 Not Used

AF Form 66, OCT 89 Page 4

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

PLASTIC-LAMINATE-CLAD

COUNTERTOPS & BASE

CABINETS SEC 12 36 23.13 PAR

1.5 5 5

WET PIPE SPRINK SYS

SEC 211313.0010 PAR 1.5 & 1.6 5 5 5

5 5 5 5

PLUMBING

SEC 220000 PAR 1.2 5 5 5 5 5

MECHANICAL GEN REQUIRE

SEC 230300.0020 PAR 1.8 5 5 5

TEST, ADJUST, BALANCE

SEC 230593 PAR 1.4 5

DUCTWORK INSULATION

SEC 230713 PAR 1.4 5 5

PIPING INSULATION

SEC 23071915261 PAR 1.4 5 5

COMMISSIONING HVAC

SEC 230800 PAR 2 & 5 5 5 5 5

DUCTWORK

SEC 233100 PAR 1,4 5

DUCTWORK ACCESSORIES

SEC 233300 PAR 1.4 5 5 5

POWER VENTILATORS

SEC 233423 PAR 1.4 5 5

AIR OUTLETS AND INLETS

SEC 233700 PAR 1.4 5

AF Form 66, OCT 89 Page 5

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

A

SPLIT-SYSTEM HEAT PUMPS

SEC 238126 PAR 1.3 5 5 5 5 5 5

3 PHASE PAD MOUNT TRANS

SEC 261219.10 PAR 1.3 5 5 5

INTERIOR DIST SYSTEM

SEC 262000 PAR 1.3 5 5 5

INTERIOR LIGHTING

SEC 265100 PAR 1.4 5 5 5

COMMUNICATIONS DIST SYS

SEC 271000 PAR 1.5 5 5 5

INTERIOR FIRE ALARM/MNS

SEC 283176 PAR 1.2 5 5 5 5 5 5

EARTHWORK SEC 312000

PAR 1.6 5

TERMITE CONTROL

SEC 31 31 16 PAR 1.3 & 1.4 5

WATER UTILITIES

SEC 331000 PAR 1.4 5 5 5

SANITARY SEWERAGE

FACILITIES SEC 333000

PAR 1.4 5 5 5

ELECT DIST SYS UNDERGRD

SEC 337002.0010 PAR 1.3 5 5 5

OVERHEAD TRANS/DIST

SEC 337101 PAR 1,3 5

5 5 5

AF Form 66, OCT 89 Page 6

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

N

T R

A C

T

IN

G

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVEDS

D

-0

S A

M P

L E

S

S D

-0

M F

R 'S

F

IE

L D

R E

P O

R T

S

S D

-1

O P

E R

A T

IO

N

M

A

IN

T

D A

T A

S D

-1

C L

O S

E O

U T

S U

B M

IT

T

A L

S

S D

-0

M F

R 'S

IN

S

T R

U C

T

IO

N S

S D

-0

P R

E C

O N

S T

R U

C T

IO

N

S U

B

S D

-0

D E

S

IG

N D

A T

A

S D

-0

T E

S T

R E

P O

R T

S

S D

-0

C E

R T

IC

IA

T E

S

S D

-0

S H

O P

D R

A W

IN

G

S

S D

-0

P R

O D

U C

T D

A T

AF Form 66, OCT 89 Page 7

GENERAL ENVIRONMENTAL PROTECTION 01 35 43-1

SECTION 01 35 43 - GENERAL ENVIRONMENTAL PROTECTION

1.1 GENERAL

This section covers environmental protection in general. Specific environmental requirements are included in other appropriate sections of the specifications. Additional general environmental requirements are included in the General Provisions of the contract. The provisions of this section are in addition to the aforementioned requirements. Where the general provisions of this section conflict with specific requirements elsewhere, the specific requirements shall control. The Contractor shall comply with all applicable local, state, federal, and Air Force environmental regulations. These items include, but are not limited to the following:

a. Vehicles and other powered equipment shall meet all applicable air quality regulations for emissions. Equipment shall be mechanically sound and have all seals, grease rings, and other containment systems in place to prevent leakage. Drip pans shall be maintained such that overflow and spills do no occur. Associated waste shall be handled in accordance with all applicable regulations. There shall be no activities for equipment maintenance including oil changes, filter replacements, or hydraulic equipment repair performed on base without prior approval by the Contracting Officer.

b. All solid waste shall be collected and disposed of on a daily basis. There shall be no accumulation of solid waste unless properly containerized or put within a fenced area to prevent material from being blown about by the wind. No liquids shall be put into base dumpsters. This includes paints, oils, chemicals, compressed gas, pesticides, and other similar materials. Dried paint cans will be allowed in dumpsters only if such cans contain no lead, chromium, cadmium, or other hazardous materials.

c. All Hazardous wastes such as sandblast media, chlorinated solvents, paint, paint thinners, cleaners, and fuels shall be labeled and an inventory management system will be initiated to ensure timely removal and proper disposal. No on-base disposal will be allowed.

(1) All drums shall be labeled with a hazardous waste label. The label shall include the proper DOT shipping name, UN or NA, EPA waste number, generator information, and accumulation start date. The label shall be placed on the side of the drum.

(2) All drums used to store hazardous waste shall be nonleaking and safe to handle.

Drums that are rusted, dented, or leaking shall be overpacked. Drums and/or overpacks shall be provided by the Contractor. All containers shall be DOT approved containers.

(3) Storage of drums will be approved by the Hazardous Waste Branch of the

Environmental Management Directorate (AFDTC/EMCW) prior to the generation of hazardous waste. The Contractor shall document inspection of drums for leaks on a daily basis or if not working in the area daily, then a weekly inspection will suffice. A drum shall be disposed within 90 days of the first drop in the container. A copy of the inspection checklist shall be kept in a log on site.

(4) Hazardous waste drums shall be stored at an approved accumulation site. A sign listing emergency telephone numbers and identifying the site as an accumulation site with two points of contact shall be placed in a highly visible location.

GENERAL ENVIRONMENTAL PROTECTION 01 35 43-2

(5) Hazardous waste transportation and disposal shall be coordinated through EMCW. The transporters and disposal facilities will be approved by EMCW prior to their use. Manifests will be signed only by EMCW.

d. Hazardous Materials: The Contractor shall submit to the contracting officer a list of all hazardous materials to be brought onto Eglin AFB property prior to the onset of any work.

The list shall include all paints, solvents, POL products, pesticides, etc. to be used during the duration of the contract. All newly identified requirements for hazardous materials shall be coordinated with and approved by the Compliance Division of the Environmental Management Directorate (EMC) prior to bringing the material on Eglin property.

e. Fuel storage shall be limited to 110 gallons and shall be contained in a government approved portable tank. Siting of the tanks shall be approved by the Contracting Officer.

f. Storage of oils, greases, chemicals, or other liquids shall require a fully contained facility for spill prevention and security. A minimum of 40 pounds of absorbent material per 44 gallons of chemical/oil/grease shall be on hand for spill control.

g. All spills shall immediately be reported by calling 911. Information as to spill location, type of material, and estimated time when the spill occurred shall be provided. The Contractor shall ensure appropriate personnel training in spill response and personnel protective equipment (PPE) is available to take care of spill cleanup and handling of residues of materials under their control.

h. Spray painting shall be conducted by using low-volatile organic chemical (VOC) paint technology or water base paints. See Section 09900 PAINTING for restrictions on spray painting.

i. Contractor sites (i.e. trailer and storage sites) shall be properly maintained at all times.

Repair of all damage due to improper erosion control shall be the responsibility of the Contractor. Release of the site by the Contractor will be accomplished by a final Contractor site review, at which time site deficiencies will be noted. The Contractor shall have 14 calendar days (beyond the contract completion date if necessary) to correct all deficiencies. The contract completion date will not be changed due to any of the required site review actions.

j. Asbestos: If the Contractor encounters unforeseen site conditions including, but not limited to suspected asbestos containing materials during the performance of this contract, the Contractor shall cease operations in the suspect area, immediately evacuate all personnel, and notify the Contracting Officer and the construction inspector.

Samples will be taken and analyzed by the government. See section "Engineering Control of Asbestos Containing Material".

k. Banned Ozone Depleting Chemicals: All equipment using any Class 1 ozone depleting chemicals (ODCs) for a fire suppressant, refrigerant or solvent is banned from acquisition or use unless it has an Air Force waiver. This includes, but is not limited to systems using Class 1 ODCs such as halon 1211, halon 1301, R-11 (trichlorofluoromethane), R- 12 (dichlorofluoromethane), R-113 (trichlorotrifluoroethane), R-114 (dichlorotetrafluoroethane), R-115 (chloropentafluoroethane), and all azeotropic mixtures containing controlled chemicals such as CFC 500, 501, 502, and 504.

l. Ground Contamination: If suspected contamination is encountered during excavation activities (often indicated by unusual colors or odors), the Contractor shall contact the Contracting Officer immediately.

GENERAL ENVIRONMENTAL PROTECTION 01 35 43-3

m. Environmental Training: Specific Contractor personnel may be required to attend Hazard Communications (HazCom) Training and Hazardous Waste Seminars held bi-annually at Eglin AFB at no cost to the Contractor. If the Contractor has a HazCom and Hazardous Waste Handling Programs in place and can provide proof of such program, then the HazCom Training can be waived. Proof of existing HazCom and Hazardous Waste Handling Programs shall be provided to the environmental management representative at the pre-construction meeting and updated annually.

END OF SECTION 01 3 5 43

ENVIRONMENTAL PROTECTION 01 35 44-1

SECTION 01 35 44 - ENVIRONMENTAL PROTECTION

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. The publication shall be the most current issue.

CODE OF FEDERAL REGULATIONS (CFR)

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 403 General Pretreatment Regulations for Existing and New

Sources of Pollution

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials, Tables, and Hazardous Materials Communications Regulations

ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA PL 96-510 Comprehensive Environmental Response Compensation and Liability Act

1.2 DEFINITIONS

1.2.1 Sediment

Soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.2 Solid Wastes

Rubbish, debris, and other discarded solid materials, except hazardous waste as defined in paragraph entitled, "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.

1.2.3 Rubbish

Combustible and noncombustible wastes including paper, boxes, glass, crockery, metal, lumber, cans, and bones.

1.2.4 Debris

Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.

1.2.5 Chemical Wastes

Salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

ENVIRONMENTAL PROTECTION 01 35 44-2

1.2.6 Sanitary Wastes

a. Sewage: Waste characterized as domestic sanitary sewage.

b. Garbage: Refuse and scraps resulting from consumption of food.

1.2.7 Hazardous Wastes

Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.

1.2.8 Oily Wastes

Petroleum products and bituminous materials.

1.2.9 Hazardous Substances

As defined in EPA PL 96-510.

1.2.10 Hazardous Materials

As defined in DOT Regulation 49 CFR 171 and listed in 49 CFR 172.

1.3 SUBMITTALS

Submit the following in accordance with Section 01340, "SHOP DRAWINGS, PRODUCT DATA AND

SAMPLES:"

1.3.1 SD-08, Statements

a. Solid Wastes Disposal Permit: Submit one copy of a state or local permit or license showing such agency's approval of the disposal plan before transporting wastes off Government property.

1.3.2 QUALITY ASSURANCE

1.3.3 Environmental Protection Requirements

Provide and maintain, during the life of the contract, environmental protection as specified. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances and noise pollution.

1.4 HISTORICAL AND ARCHAEOLOGICAL RESOURCES

Protect in-place and report to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Stop work in the immediate area of the discovery until directed by the Contracting Officer to resume work.

ENVIRONMENTAL PROTECTION 01 35 44-3

1.5 SOLID AND SANITARY WASTES

Pick up solid wastes, and place in containers which are regularly emptied. Prevent contamination of the site and other areas when handling and disposing wastes. On completion, leave the areas clean.

Control and dispose of wastes.

1.5.1 Disposal of Solid Wastes

Dispose of solid wastes in accordance with the requirements specified.

a. Removal from Government Property: Remove solid wastes from Government property.

b. Removal to a Government Landfill: Dispose of solid waste at Government landfill site indicated or specified. Cover deposited material after each day's operation. Contractor shall submit one copy of a state or local permit or license showing such agency's approval of the disposal plan.

1.5.2 Garbage Disposal

Place garbage in approved containers; the Contractor shall provide pickup and disposal service.

There will be no accumulation of solid waste unless properly containerized or put within a fenced area to prevent material being blown about by the wind. No liquids will be put into base dumpsters. This includes paints, oils, chemicals, compressed gas, or pesticides. Only dried paint cans will be allowed in dumpsters.

1.5.3 Sewage, Odor, and Pest Control

Dispose of sewage through connection to a municipal, district, or station sanitary sewage system. If sanitary sewage system is not available, use chemical toilets. Empty wastes into a municipal, district, or station sanitary sewage system, or construct and maintain an approved type of sanitary convenience for the use of persons employed on the work. Provide pest control and elimination of odors. Do not dispose of substances which will interfere with treatment plant operations in accordance with 40 CFR 403.

1.6 HAZARDOUS WASTES

1.6.1 Petroleum Products

Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation. Dispose of lubricants and excess oils.

1.6.2 Other Hazardous Wastes

All hazardous wastes such as sandblast media, chlorinated solvents, paint thinners, and fuels will be labeled and an inventory management system initiated to ensure timely removal and proper disposal.

There will be no on-base disposal allowed, including use of drains (sanitary, storm, or industrial).

a. All drums must be labeled with a hazardous waste label. The proper DOT shipping name, UN or NA, EPA waste number, generator information, and accumulation start date on the label must be filled out. The label must be placed in the upper third of the drum.

b. All drums used to store hazardous waste must be nonleaking and safe to handle. Drums that are rusty, dented, or leaking should be overpacked. Drums and/or overpacks must be purchased by the Contractor. All drums purchased by the Contractor must be DOT

ENVIRONMENTAL PROTECTION 01 35 44-4

specification numbers 5B, 17E, or 17H. The specification numbers are stamped on the bottom of the drum.

c. Drums filled with hazardous waste must be inspected weekly for leaks. The Contractor will obtain from Environmental Flight (CEV), Building 696, and fill out a generator's inspection checklist each week the drums are in storage (up to 90 days). Completed checklists must be forwarded to CEV every Friday until drums are properly disposed of by the Contractor.

d. Hazardous waste drums must be stored in an area authorized by CEV. In general, the area must have a containment system, be secure, and have signs placed around it that say: "Hazardous Waste. No Trespassing."

e. Hazardous waste drums can only be stored for 90 days after the accumulation start date.

Drums will be kept closed except when adding or removing waste.

1.7 DUST

Keep dust down at all times, including during nonworking periods. Sprinkle or treat the soil at the site, haul roads, and other areas disturbed by operations with dust suppressants. Do not use dry power brooming. Vacuuming, wet mopping, wet sweeping, or wet power brooming is acceptable. Air blowing will be permitted only for cleaning non-particulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not shake bags of cement, concrete mortar, or plaster.

1.8 ODC'S

The release of ODC's is prohibited. All refrigerants will be recycled or recovered in accordance with EPA standards.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .