Attachment-1-SOW.pdf

PDF 139 KB Posted

Attached to
Replace Parade Ground Irrigation System, Fort MacArthur Federal contract opportunity
Solicitation number
FA2816-09-R-0059
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

Attachment 1 - SOW

View the file

Other files for this federal contract opportunity

Other files attached to Replace Parade Ground Irrigation System, Fort MacArthur, newest first.
File Type Posted
RFI's.pdf PDF
FA2816-09-R-0059-0002.pdf PDF
ft_mc_irrgation specification_final.pdf PDF
Fa2816-09-R-0059-0001.pdf PDF
FA2816-09-R-0059.pdf PDF
Attachment 4 - Specifications.pdf PDF
Attachment 2 -Wage Determination CA080033.pdf PDF
Attachment 9 - Section 01010 - Environmental Requirements.pdf PDF
Attachment 3 - Design Documents.pdf PDF
Attachment 5 - Warranty Letter Example.pdf PDF
Attachment 7 - PastPerformanceQuestionnaire.pdf PDF
Attachment 8 - Section 07000 - Landscape Specifications.pdf PDF
Attachment 6 - AF Form 66 Replace Parade Ground.xls XLS spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Requester: 61 CELS/CLCD, Sean McNeil ph.(310) 653-5494 CE Project Engineer: 61 CELS/CEPM, Sean McNeil ph.(310) 653-5494 Project Title: Replace Parade Grounds Irrigation System, Fort MacArthur Project Number: HHEK 081036 Work Order: # [51636] Date: 06/01/09 Revision: [0]

1. SITUATION

This project is located on the Parade Ground located on Fort MacArthur, Ca. The current irrigation system has been designated to be replaced. This project is a Construction Project.

2. DEFINTIONS

61 CELS: Los Angeles Air Force Base Civil Engineer and Logistics Squadron

61 CONS: Los Angeles Air Force Base Contracts Squadron

Architect-Engineer (A-E): The Architect-Engineer for the project.

Beneficial Occupancy Date (BOD): Date when the building in part or whole is complete and turned over by the Contractor to the Government.

CE Inspector: The onsite (or field) Government representative during the construction phase of the project.

CE Project Engineer (PE): The Government technical lead for the project.

Contract Administrator (CA): The Government contractual interface for the project.

Contract Documents: The drawings, specifications, and other supporting documentation developed during the Design Phase of the project to be used in the Construction Phase of the Project.

Contracting Officer (CO): The Government contracts representative with authority over the Contract.

Contractor: The entity entering into a contract agreement directly with Government to perform the work under this Statement of Work

Issued for Construction (IFC): The Contract Documents that are ready to be turned over to the

Contractor for execution of the Construction Phase of the project

Notice to Proceed (NTP): The written notification from the Contracting Officer directing the Contract to proceed with project/phase of the work.

Subcontractor: A lower tier contractor entering into a contract agreement with a higher tier contractor

3. SCOPE OF WORK

3.1. General Scope of the Project to be

performed includes but is not limited to the following:

3.1.1. The contractor shall provide all

necessary equipment, labor and materials to complete the attached IFC Irrigation design and demolition of existing and new irrigation system located at the Parade Grounds on Fort MacArthur.

3.2. Detailed Scope of Work: The Contractor is

responsible for the construction of this project based on the documents listed in the Schedule of Contract Documents (Appendix A).

4. PROPOSAL PROCEDURE

4.1. Construction Project: This project will be

awarded as a Construction project. The Contractor’s Proposal documents shall be submitted and received in accordance with 61 CONS requirements. The Contractor submitting a proposal on this project shall be required to submit a proposal that encompasses all construction related costs.

These costs shall reflect all associated costs (i.e. overhead, profit, subcontractors, etc.) of the construction. This project shall comply with all federal, state, and local regulations and ordinances, including the appropriate Unified Facility Criteria (UFC) documents.

Costs shall reflect compliance with these regulations.

[HHEK 081036] [06/01/2009 – Revision 0] 1

5. GENERAL

5.1. Period of Performance: This includes all

phases of the project including Construction, and Close-out Phases including all required Government review time.

5.2. Project Schedule: The Contractor shall

provide, for approval, an AF Form 3064 or a prior approved alternative, progress schedule to the Contract Administrator within five (5) working days after NTP. Schedule shall be detailed enough to identify all submittals and phases of work including but not limited to design, site mobilization, demolition and excavation activities, construction, hardscape installation, landscaping finishes, clean-up, demobilization, training of service personnel, closeout documents, Operations and Maintenance Manuals and any and all other related activities .

5.3. Submittals: Contractor shall submit all items

listed in AF Form 66, Schedule of Submittals, (Appendix B) for review and approval utilizing the AF Form 3000 as a cover sheet/transmittal.

5.3.1. Text Documents: All text document

submittals shall be provided in both hardcopy and electronic formats as noted in AF Form 66. Hardcopies shall include a loose-leaf copy and all additional copies shall be bound volumes. Electronic text document files shall be submitted on CDs or DVDs in the native file format (MS Word, MS Excel, MS Project, etc.) and in a pdf version of the original.

5.3.2. Drawing Documents: All drawing

document submittals shall be provided in both hardcopy and electronic formats as noted in AF Form 66. Hardcopies shall include one full-size set of bound drawings and all additional copies shall be half-size sets of bound drawings.

Electronic files shall be submitted on CDs or DVDs and include the AutoCAD files as noted in Section 6.2 and a pdf version of each half-size drawing file..

5.4. Permits & Certificates: The Contractor

shall obtain and provide to the Government, prior to commencing work, all permits and certificates as required by Federal, State, and/or Local Government agencies

5.5. Conferences / Meetings: Coordination

conferences / meetings will be held from time to time as required. The Contractor may request such conference when it is deemed necessary by both parties to clarify the work or expedite the preparation of plans and specifications.

5.5.1. The Contractor shall be responsible

for making memorandums of record of any conversations and minutes of any meetings with Government personnel concerning this project and forward one copy of these memorandums/minutes to each party concerned and one copy to the Contract Administrator within five

(5) working days of event. Each memorandum shall be numbered consecutively and chronologically, and signed by the Contractor’s authorized representative.

5.6. Code Compliance: Unless otherwise stated

all construction and related activities shall comply with the most stringent applicable federal, state, and local laws, codes, ordinances, and regulations to include, but not limited to, the Department of Defense Unified Facilities Criteria (UFC) 1-200-01 and applicable occupation health and safety standards. Code deficiencies shall be corrected at the expense of the Contractor by repair or replacement as directed and approved by the Contracting Officer (CO).

5.7. Work Hours:

5.7.1. Normal Hours: All work shall be

accomplished in such a manner that minimum inconvenience shall be caused to the Government. All work shall be accomplished during normal duty hours of 0730 to 1600 hrs, excluding weekends and Federal holidays. The Contractor shall obtain written approval from the Contracting Officer for any changes to these hours.

5.7.2. Change to Normal Hours: The

Government reserves the right to change hours of operation.

5.7.3. Restricted Access: During the

course of the contract, certain areas may be restricted or closed to Contractor personnel. The Contractor shall comply with requirements for entry to include

[HHEK 081036] [06/01/2009 – Revision 0] 2 signing in or securing an entry badge and or wait for an escort.

5.7.4. Military Exercises: Occasionally, Government forces will conduct various disaster or contingency exercises.

Should the Contractor be in an area subject to control, he shall immediately comply with the directions of Security Forces personnel. This may include stoppage of work and immediate departure from the area. The Government is not responsible for any costs associated with these exercises.

The Contractor or his designated representative shall immediately inform the CE Inspector and await a clearance to return to the work area.

5.8. Personnel:

5.8.1. Project Manager: The Contractor

shall provide a fully qualified Project Manager/Alternate Work Supervisor who shall be available and can be contacted between the hours of 7:00 a.m. to 4:30 p.m., Monday through Friday, except for legal federal holidays.

The Contractor shall notify the Contract Administrator (CA) in writing at time of NTP of the names and contact information (i.e. office phone, work cell phone, email, etc) of the Project Manager and his designated representatives. The Project Manager and alternate(s) must be able to read, write, speak and understand English.

5.8.2. Appearance: All construction site

Contractor employees shall present a neat appearance and shall wear clothing bearing the company name to be easily recognized as a Contractor employee while on Los Angeles Air Force Base property. Reflective construction vest and personal protective equipment shall be worn by all field personnel and field visitors.

5.8.3. Restriction of employees: The

Contracting Officer (CO) may restrict the employment under the contract of any Contractor employee, or prospective contract employee, who is identified as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population.

5.8.4. Security: All aspects of the work

and personnel involved shall comply with Los Angeles Air Force Base security requirements, including unescorted access. Personnel shall have their own base pass available at all times while working on base. Contractor (this includes himself, employees, contractors, subcontractors, suppliers, etc.) shall be on site at all times when work on this project under their control is being preformed.

5.8.5. Area Clearances/ID: The

Contractor shall provide the Contract Administrator a detailed list of all employees (both prime and sub) requiring access to restricted areas for unescorted access. This list shall include the employee’s full name (as it appears on their Driver’s License/state valid picture identification), citizenship, date of birth, location of birth, social security number, driver’s license number, current vehicle registration, and proof of vehicle insurance. These items shall be in their possession at all times to gain entry into the installation.

Contractor shall be responsible for obtaining entrance for all workers, contractor, subcontractor, suppliers, etc.

The Government and/or its representatives will not sponsor workers, subcontractors, suppliers, etc on to the base.

5.8.6. Photography: No photographs of

any type shall be taken at any time without the prior written authorization of the Government.

6. CONSTRUCTION PHASE

6.1. Contractor: The Contractor shall construct

the project based on IFC Contract Documents. The Contractor shall have a valid Class B Contractor license with the State of California Licensing Board. All lower tier Subcontractors shall also have valid and appropriate contractor license with the State of California Contractors Licensing Board. The Contractor shall submit to the Contract Administrator (CA) proof of compliance for the Contractor and all Subcontractors for this item prior arrival on site.

[HHEK 081036] [06/01/2009 – Revision 0] 3

6.1.1. Contractor Responsibility: The

Contractor shall be responsible for inspection and verification of all field conditions, inspect related work and adjacent areas prior to bidding and/or commencing work of said contract. All work to be coordinated with CE Inspector prior to the start of any activity. Contractor must report conditions preventing proper execution of work to the Contract Administrator (CA). Any condition(s) that would require deviation from this specification should be reported to the Contract Administrator (CA). The Contractor shall have supervisory staff on site at all times during the execution of work.

6.1.2. Contractor Means and Methods:

The Contractor shall be responsible for construction means, sequences, and appropriate procedures in accordance with acceptable construction practices resulting in a final, complete and useable product.

6.1.3. Commencement of work on site:

The Contractor shall not commence with any portion of the construction services until directed by the Contracting Officer.

6.1.4. Work Clearance Request: The

Contractor shall request from the CE Inspector a Base Civil Engineering Work Clearance Request (AF Form 103) prior to starting any field work. The AF Form 103 will be initiated and completed by the CE Inspector.

Additionally, at the request of the Contractor, notification requirements with local agencies, utility companies, dig alert and/or adjacent properties shall be coordinated with CE Inspector.

6.1.5. Welding, Cutting and Brazing

Permit: The Contractor shall request from the CE Inspector an USAF Welding, cutting and Brazing Permit (AD Form 592) prior to starting any work covered by the permit. The AF Form 592 will be initiated and completed by the CE inspector.

6.1.6. Conditions of Work: All efforts

shall be made to allow complete access of the work area to the Contractor(s) and subcontractor(s) and maintain the area free of traffic to personnel. Temporary facilities constructed by the Contractor to prevent interruption of normal work activity are subject to approval by Contracting Officer (CO). The Contractor is required to notify the CE Inspector of any drive blocking or street access restrictions at least five (5) working days prior to modifications.

6.1.7. Interruption of Utility Services, Fire Alarm Systems, Fire Sprinkler, and Intrusion Detection Systems:

Utility, communication services, and/or fire security systems are not to be interrupted under any circumstances to make, or relocate connections for any other purpose without the approval of the base Fire Chief and the Contracting Officer (CO). Impairments requests must be made a minimum of fifteen (15) working days in advance and shall be properly coordinated so as to limit the time of disruption to affected occupants.

Circumstances may require the interruption be performed after working hours or over a weekend period. Plans shall be submitted for relocation of any fire protection/detection equipment identifying present and proposed location.

6.1.8. Unforeseen Environmental Issues:

The Contractor is responsible to notify Government on urgent basis for any unforeseen conditions not previously described, especially environmentally unfriendly conditions so that Government can act upon immediately and minimize construction downtime.

6.2. Construction Submittals:

6.2.1. Work Phasing Plan: Contractor

shall submit a preliminary work phasing plan which includes existing facility access, egress, and loading routes. This plan is intended to supplement the project schedule and shall provide the Contractor’s preliminary means to maintain facility function throughout the construction period.

6.2.2. Construction Material and Shop

Drawing Submittals: At the start of the Construction Phase, the Contractor shall submit a schedule/log listing all of the material and shop drawings that will

[HHEK 081036] [06/01/2009 – Revision 0] 4 be utilized in the construction of the project. The Contractor shall submit material data / samples and shop drawings for approval at enough time in advance to allow the Government the opportunity to review and concur before the Contractor commits to purchasing / fabricating the material.

6.3. Environmental:

6.3.1. Environmental Compliance: The

Contractor shall comply, and ensure that all subcontractors comply with all applicable and latest federal, state, county, and local environmental laws and regulations to include, but not limited to: general and specific permit conditions; Air Force Instructions (AFI), policies, guidelines, compliance documents, and management plans. The Contractor shall comply with applicable portions of the latest Environmental Construction Requirements Specification Section 01010. The submittals listed in this document are mandatory requirements for environmental management compliance.

6.3.2. Asbestos/Lead Abatement: Los

Angeles Air Force Base will provide lead/asbestos survey results to Contractor, where necessary. This survey will be conducted under separate contract. Contractor shall comply with applicable portions of the latest Asbestos Abatement Specification Section 02085 and Lead-Based Paint Abatement Specification Section 02086 and will be monitored by the Environmental Section of 61 CELS for compliance.

6.4. General

6.4.1. Site Security: The Contractor shall

be responsible to provide security for the project site. Means of access shall to be furnished to the CE Inspector.

6.4.2. Fire Prevention: All aspects of the

work shall comply with fire regulations, which are available through the CE Inspector. If determined necessary by the base Fire Chief, Contractor shall provide fire watch & provide labor for covering and/or protection of all fire alarm devices as required.

6.4.3. Safety: The applicable Occupational

Safety and Health Act (OSHA) standards are incorporated into this contract. The Contractor shall provide 5 working days prior to commencement of work on site a project specific Safety Plan. The Contractor shall provide temporary closures, covers, barricades, signs, and other resources required for the safety of building occupants, construction personnel, base personnel, and visitors. Upon request of the CE Inspector, all safety deficiencies shall be handled by the Contractor in a timely fashion. The Site Safety Plan submitted by the Contractor shall address all of these items. The Government reserves the right to order an immediate stop work notification on a portion and/or the entire construction work site should this person determine that an unsafe work site condition exists.

6.4.4. Sanitary Facilities: The Contractor

is responsible for providing adequate sanitation facilities for their employees.

The Contractor shall provide an appropriate number of portable restroom facilities, wash stations, and trash receptacles for all employees on site.

The Contractor is responsible for providing regularly scheduled maintenance, cleaning, and restocking of the facilities. The Contractor is to coordinate location of these facilities during the Pre-Construction meeting. If the Contractor is not allowed to use portable facilities, Contractor personnel may use the nearest sanitary facility.

The location will be identified at the preconstruction meeting. The Contractor shall not use facilities in controlled or restricted areas in accordance with security regulations.

6.4.5. Utilities: All reasonable quantities of

utilities will be made available to the Contractor without charge. Any temporary connections or lines that may be required shall be installed, maintained, and removed by the Contractor at his expense but must be approved prior to work by the Contracting Officer (CO).

6.4.6. Water Usage:

[HHEK 081036] [06/01/2009 – Revision 0] 5

6.4.6.1. Main Los Angeles Air Force

Base, El Segundo: Water from Los Angeles Air Force Base fire hydrant system is not available for use by the Contractor and for construction. The Contractor may utilize water, if available, from an existing nearby facility or from an available irrigation connection upon approval of the CE Inspector. If neither of these options is available, the Contractor will be allowed to bring in water to be stored on the construction site.

6.4.6.2. Fort MacArthur, San Pedro:

At Fort MacArthur the Base fire hydrant system is available for use by the Contractor.

6.4.7. Repair/Care: Contractor shall

exercise due care to protect existing installations and monuments from damage. During performance of the work, the Contractor shall maintain clean project area(s) daily at his/her expense and at the end of each work day and upon completion of the job. Any damage to the construction site during the project is the responsibility of the Contractor to repair to original condition. This is to include travel paths to the project site. All damaged items are to be replaced with in kind item unless prior approval is obtained from the Contracting Officer (CO).

6.5. Construction:

6.5.1. Material: Unless otherwise specified

or noted on drawings or Scope of Work, all material associated to scope of contract shall be new. All damage during or after delivery, installation, and before final inspection shall be the responsibility of the Contractor, and the Contractor, at no additional cost to the Government, shall replace any damaged materials.

6.5.2. Demolition: Contractor may be

required to remove or relocate some items not shown on drawings or indicated in the Scope of Work, depending on the equipment manufacturer’s specifications and/or recommendations. The cost for such work shall be included in the Contractors Scope.

6.5.3. Removal of Debris: The Contractor

is responsible for removal from the site of including but not limited to excavated soils, vegetation and all trash/construction debris associated with this project. All trash, debris, and refuse caused by the job shall be removed and disposed off base in compliance with State and Local ordinances and shall be deposited in an approved receptacle or container furnished by the Contractor.

The job site shall be cleaned at the end of each workday. All debris removed from site shall be recorded and disposal tickets provided to the CE Inspector.

All debris should be recycled where possible.

6.5.4. Underground Utilities: All utilities

that are buried after installation are to be tested to maximum capacity possible in the presence of the CE Inspector before they can be buried. A 24 hour notice is required to be given to the CE Inspector before the test & inspection. In the case of electrical lines (conduit for electrical lines) only inspection of the conduit is necessary. All utility lines are to be laid on 1 foot of clean fill with 1 foot of clean fill covering. Tracer wire is to be taped to the top of non-metallic lines (water, sewer, storm drain, etc) and the proper caution tape is to be placed at least one foot above the line, on top of the top clean fill layer.

7. CLOSEOUT PHASE

7.1. Pre-Final Inspection: Once substantial

construction (90%) has been completed and the Contractor has performed his own in-house inspection with the Contractor’s subcontractors and remedied all deficiencies, the Contractor shall notify the Contract Administrator five (5) working days in advance requesting a pre-final inspection.

Final acceptance testing of components (i.e.

electrical, irrigation, etc) shall be required.

Contractor shall submit a final acceptance testing plan to be approved by the CE Inspector prior to final acceptance testing.

7.2. Final Inspection: Upon completion of the

findings in the pre-final punch list items a final inspection shall be requested. The

[HHEK 081036] [06/01/2009 – Revision 0] 6

[HHEK 081036] [06/01/2009 – Revision 0] 7

Contractor must notify the Contract Administrator (CA) requesting a final inspection.

7.3. Operations and Maintenance Manuals, and

Training: The contractor shall provide operations and maintenance manuals for all equipment installed under this contract that requires periodic maintenance as per AF Form 66. Training sessions conducted by the appropriate subcontractor shall occur within 30 days of BOD. The Contractor shall be responsible for videotaping the training and provide copies as per AF Form 66. The contractor shall provide notification to the CE Inspector five (5) working days prior to planed training session.

7.4. Equipment/Workmanship Warranty: The

Contractor must provide detailed written documentation of all warranty conditions for the completed job to include all parts, labor, and workmanship. Description of warranted labor, material, and/or equipment shall include manufacturer name, model and serial numbers. This documentation is to be provided to the Contract Administrator (CA) prior to final invoice. Faulty materials and/or unsatisfactory workmanship occurring during the warranty period shall be corrected and addressed to Contracting Officer (CO) as a warranty call at the Contractor’s expense.

Warranty period for all work, labor, and materials shall be a minimum of 1 year after issuance of the Beneficial Occupancy Date

(BOD).

7.5. DD 1354 Transfer and Acceptance of Real

Property: Per UFC-300-08 and the Category Code List (to be provided upon request by the Contractor) the Draft (new construction) or Interim (remodel construction and equipment modifications) DD-1354 shall be submitted twenty (20) days prior to BOD. The final DD-1354 shall be submitted within thirty (30) days of the BOD.

7.6. Construction Record Drawings: The

Contractor shall provide ‘red line’ hardcopies and AutoCAD files of drawings of any alterations, changes, additions, deletions, deviations, etc to the Issued for Construction (IFC) drawings during construction. The AutoCAD files shall be submitted as both live cad files and clip-bound versions of each of the drawing.

7.7. Additional Computer Aided Design

Documents: Contractor shall provide AutoCAD drawings for all custom or fabricated items provided or installed under this contract. Contractor shall provide CAD drawings from the manufacturer, if available.

(End of Statement of Work)

PROJECT TITLE: SOLICITATION / CONTRACT NO.:

D

O C

U M

EN

T

N U

M B

ER

D O

C U

M

EN

T D

A

TE

D O

C U

M

EN

T R

EV

IS

IO

N

U M

B

ER

REMARKS

1 1/9/2009 0 30 Pages

2 11/13/2008 0 23 Pages

3 6/15/2009 0 L0.0, L1.0, L2.1-L2.3, L3.0, L4.0, L5.0, M1.0, E1.0, S1.0, REF 1, REF 2

(13 Pages)

4 6/11/2009 0 62 Pages

Section 07000 - Landscape Specifications

Los Angeles Air Force Base, Fort MacArthur Parade Grounds Irrigation System, Project Number: HHEK081036 (Design Documents)

Repair Parade Grounds Irrigation System, Ft. MacArthur HHEK-081036 (S ifi ti )

PROJECT NUMBER:

HHEK081036 HHEK081036 - Parade Grounds Irrigation System

DOCUMENT TITLE

SCHEDULE OF CONTRACT DOCUMENTS

(Including Drawings, Specifications, and Design Analysis)

Section 01010 - Environmental Construction Requirements

4 6/11/2009 0 62 Pages(Specifications)

Schedule of Contract Documents 1 of 1 (11-17-08) Appendix A

LI

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

1 Project Manager and designated representatives contact information (SOW Sec 5.8.1) 2 1 At time of NTP

2 Project Schedule (SOW Sec 5.2)

2 1 NTP plus 5 working days - Updated weekly

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEk081036

PROJECT TITLE:

Parade Grounds Irrigation System weekly

3 Meeting Minutes (SOW Sec 5.5.1)

2 1 5 working days after event

4 Site Safety Plan (SOW Sec 6.4.3

2 1 5 working days prior to onsite work

5 Work Phasing Plan (SOW Sec 6.2.1)

2 1 5 working days after

NTP

6 Environmental Protection Plan (Spec Sec 01010 - Section 1.6)

2 1 5 working days prior to onsite work

7 List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7)

2 1 5 working days prior to onsite work

8 AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9)

2 1 5 working days prior to use

9 Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10)

2 1 As required

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 1 of 3 Appendix B

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEk081036

PROJECT TITLE:

Parade Grounds Irrigation System

10 Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11) 2 1

5 working days prior to onsite work

11 Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13)

2 1 As required

12 NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14) 2 1

5 working days prior to onsite work

13 Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 6.2.2) 2 1

At start of Construction

Phase - Updated weekly

14 AF Form 3000, Material Submittals (SOW Sec 6.2.2)

2 2 2 2 2 2 2 2 2 2 2 As required

15 Operations and Maintenance Manuals (SOW Sec 7.3)

2 2 30 days after

BOD

16 Operations and Maintenance Training Video (SOW Sec 7.3)

2 30 days after

BOD

17 Equipment/Workmanship Warranty Letter (SOW Sec 7.4)

2 2 30 days after

BOD

18 DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 7.5) 2 1 20 days prior to BOD

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 2 of 3 Appendix B

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEk081036

PROJECT TITLE:

Parade Grounds Irrigation System

19 DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 7.5)

2 1 30 days after

BOD

20 Construction Record Drawings (SOW Sec 7.6 and 7.7)

2 1 30 days after

BOD

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 3 of 3 Appendix B

Construction SOW1
Appendix A - Schedule of Contract Documents
Material Submittals Schedule
Appendix B - AF Form 66 Construction 5-22-09
Material Submittals Schedule

File details come from the government source that posted it. Updated .