Consolidated_Q&_A_-_Answers.pdf

PDF 112 KB Posted

Attached to
Replace Lift Station 725, PAFB FL Federal contract opportunity
Solicitation number
FA2521-19-B-0001
Issued by
Department of the Air Force Space Command

About this file

Consolidated Q & A Responses

View the file

Other files for this federal contract opportunity

Other files attached to Replace Lift Station 725, PAFB FL, newest first.
File Type Posted
19B0001_Abstract_of_Offers.pdf PDF
FA252119B0001_Amendment_3.pdf PDF
FA2521-19-B-0001_02_(Amendment_2).pdf PDF
Acknowledgement_of_Amendments.pdf PDF
FA2521-19-B-0001_01_(Amendment_1).pdf PDF
Attendees_List_-_Copy_Redacted.pdf PDF
Attach_3_C102_As-built.pdf PDF
Attach_2_Area_7_Map.pdf PDF
Attach_1_Area_6_Map.pdf PDF
FA252119B0001.pdf PDF
FA252119B0001.pdf PDF
Attach_9_Site_Visit_Badge_Request.pdf PDF
Attach_4_DBWD_FL180001.pdf PDF
Attach_1_SXHT_16-1100_Drawings.pdf PDF
Attach_5_GPP_Certification.pdf PDF
Attach_8_Visit_Rules_of_Engangement.pdf PDF
Attach_2_SXHT_16-1100_Specs.pdf PDF
Attach_3_Statement_of_Work.docx DOCX document
Attach_7_Q_&_A_Template.doc DOC document
Atch1RuleofEngagement.pdf PDF
Atch3Q&A.doc DOC document
Atch2BadgeRequest.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13

FA2521-19-B-0001

SXHT 16-1100

Replace Lift Station 725 Patrick AFB, FL

CONSOLIDATED QUESTIONS AND ANSWERS

Contractor Name: Danus Utilities Inc

POC: Raymond Rogers

Question #1:

RFP Section: N/A Paragraph: N/A

SOW Paragraph :N/A

Other (Specify) Question for Clarification

Is a dewatering permit required for this project?

Answer #1: Yes

Question #2:

RFP Section: N/A Paragraph: N/A

SOW Paragraph :N/A

Other (Specify) Question for Clarification

Where can the dewatering system be discharged to on site? (i.e. storm basin / retention pond)

Answer #2: Dewatering can only be discharged to groundwater in the general area of the site (i.e. grass area). Dewatering cannot be discharge to surface water conveyances (i.e. storm sewers or swales). See below for further details and location maps attached (Attach 10_ Area 6 & Attach 11_ Area 7).

PFOS/PFOA impacted areas (in the grassy area of F705 and the two tanks or the grassy area to the south of 750 ‐ both areas attached). We would prefer the area around F705, due to its already high concentrations. A DewateringPlan by the contractor with the discharge location and estimated discharge volume would get us all on the same page to ensure we do not potentially redistribute PFOS/PFOA to non‐impacted areas. Also, there should not be PFOS/PFOA related soil impacts above the water table within the footprint of the lift station install, however, we do not know if there are soil impacts at the water table or deeper, so that soil would need to be retained in the hole or staged and properly sampled for disposal.

Question #3:

RFP Section: N/A Paragraph: N/A

SOW Paragraph :N/A

Other (Specify) Question for Clarification

Is the contractor responsible for hauling any excess dirt off-site; or is there a location on the base that dirt is stored?

Answer #3: Yes, the contractor is responsible for hauling excess dirt off-site.

Question #4:

RFP Section: N/A Paragraph: N/A

SOW Paragraph :N/A

Other (Specify) Question for Clarification

Is the building that this station services staying in use during the replacement making a by-pass pump system a requirement?

Answer #4: The lift station on serves two restrooms, which will be out of service during the project. A by-pass pump system will not be required.

Contractor Name: Cremer Global Services, Inc.

POC: Matthew Conneen

Question #5:

RFP Section N/A Paragraph: N/A

SOW Paragraph: 1

Other (Specify) Spec Section 02 41 00

Please provide as-builts of the existing foundation of Bldg 750 at the lift station and were the new force main is to be installed.

Answer #5: The new force main is to be installed under the concrete apron. Attachment 12 is the as-built drawing of the new concrete apron pavement section. The drawing required a minimum of 8 inches of concrete, but the actual thickness was up to 13 inches thick.

Question #6:

RFP Section __________ Paragraph _________

SOW Paragraph ____2_______

Other (Specify) _Spec Section 01 57 19 3.3 / 31 00 00 1.3

Where will the contractor be allowed to stage ground water generated by the dewatering operation?

Answer #6: Yes, the contractor will be able to temporarily store ground water, but will need to be released back to the ground and not to surface water. See below for further details and location maps attached (Attach 10_ Area 6 & Attach 11_ Area 7).

PFOS/PFOA impacted areas (in the grassy area of F705 and the two tanks or the grassy area to the south of 750 ‐ both areas attached). We would prefer the area around F705, due to its already high concentrations. A DewateringPlan by the contractor with the discharge location and estimated discharge volume would get us all on the same page to ensure we do not potentially redistribute PFOS/PFOA to non‐impacted areas. Also, there should not be PFOS/PFOA related soil impacts above the water table within the footprint of the lift station install, however, we do not know if there are soil impacts at the water table or deeper, so that soil would need to be retained in the hole or staged and properly sampled for disposal.

Question #7

RFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) Question for Clarification

How many facilities are being serviced by this lift station?

Answer #7: Two, one men and one women restroom.

Question #8:

SOW Paragraph ___________

Other (Specify) Question for Clarification

May the contractor use the existing force main for by-pass?

Answer #8: No, by-pass is not need. Also, groundwater may contain PFOS & PFOA contaminants and cannot be released into the sanitary sewer system through the existing force main. See below for further details and location maps attached (Attach 10_ Area 6 & Attach 11_ Area 7).

PFOS/PFOA impacted areas (in the grassy area of F705 and the two tanks or the grassy area to the south of 750 ‐ both areas attached). We would prefer the area around F705, due to its already high concentrations. A DewateringPlan by the contractor with the discharge location and estimated discharge volume would get us all on the same page to ensure we do not potentially redistribute PFOS/PFOA to non‐impacted areas. Also, there should not be PFOS/PFOA related soil impacts above the water table within the footprint of the lift station install, however, we do not know if there are soil impacts at the water table or deeper, so that soil would need to be retained in the hole or staged and properly sampled for disposal.

Question #9:

RFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) _Drwgs E-101, E-504 & E-507

Drawings and specs show a SCADA system and mention a PLC. What SCADA do they require (brand or name of system)? Or is a PLC required?

Answer #9:

No SCADA system is currently present. Drawing E-502, General Note 1 is intended to have data to be transferred in the future via RF. Contractor is to provide a new remote terminal unit (Ethernet LAN System) for future connection of the control panel to the SCADA network. PLC is required, see Sheet E-504.

Question #10:

SOW Paragraph ___________

Other (Specify) Question for Clarification

Is there a design based manufacturer for items like the radio or UPS in the panel drawing?

Answer #10: No manufacturer is specified for the UPS or radio, see E 502, E-504, E-506.

Question #11:

SOW Paragraph ___________

Other (Specify) __Drwg E-101

Confirm the junction box outside of the lift station is to be explosion proof?

Answer #11: Junction box shall be explosion proof. See drawing E-501 for detail.

Question #12:

RFP Section __________ Paragraph _________

SOW Paragraph __2_________

Other (Specify) ___________________________

Is the contractor responsible to obtain an Airfield Construction Waiver?

Answer #12: Per Wing Safety, an airfield construction waiver per se is not required. However, if a crane is used, and the extended crane boom height is taller than the hangar – then 45 SW Flight Safety (494-3353) must be contacted so that airfield NOTAMS can be developed.