QA_(Combined).pdf

PDF 13 KB Posted

Attached to
Cathodic Repair and Maintenance Service Federal contract opportunity
Solicitation number
FA2521-18-Q-A022
Issued by
Department of the Air Force Space Command

About this file

Q&A for 27 and 28 Aug 2018

View the file

Other files for this federal contract opportunity

Other files attached to Cathodic Repair and Maintenance Service, newest first.
File Type Posted
Tank_948_Final_(Q&A_27_Aug).pdf PDF
PAFB_CP_Report_2018-SPBICL_(Q&A_28_Aug).pdf PDF
Combined_Synopsis_Solicitation.pdf PDF
Atch_2-SCA_15-4555_(Rev._-6)_11Jul18.pdf PDF
Atch_1-PWS_Cathodic_Protection_R&M.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cathodic Protection Repair and Maintenance Requirement

Q&A for FA2521-18-Q-A022

Aug 27, 2018:

1Q. Regarding the coating repair line items 10AA, 10AB, & 10AC: Is there an approximate quantity of surface area that is presently in need of repair or is that something that needs to be inspected during the initial maintenance survey? How should the proposal be laid out for the coating repair?

1A. The work required and estimates for CLIN 10AA,AB,&AC are based upon an estimate prepared and provided by CorrTech in March 2018. Approximate surface area was not provided or referenced in the estimate. That said, I will assume that a Pre-Inspection will be required to adequately determine the affected area.

I have additionally included the tank inspection report from January, 2018. This includes detailed descriptions of any discovered discrepancies, as well as high-resolution photos.

Considering the majority of these repairs are either on or in the tank bowl (which will require either a high-reach, or a harnessed climb), hopefully the report and photographs will be sufficient.

28 Aug 2018:

1Q. Can we be provided with a copy of the document referenced in the PWS: “1.1 INITIAL SYSTEM CONDITION REPORT. Prior to start of any repairs or maintenance, KTR will be provided a system assessment report"

1A. See Attached Files: PAFB CP Report 2018-SPBICL 2-5-18.pdf

2Q. Can a diagram of all Boat Davits be provided, and are these Davits in Brackish waters?

2A. Two aluminum alloy boat davits are installed south of the Marina Dock, Facility 600.

No drawings or records are available for the boat davits. A galvanic anode CP system comprised of four aluminum or zinc anodes has previously been installed on the submerged boat davit supports, but the anodes have completely dissipated and the CP system is no longer functional. The anode support cables and connections to the structure are still in place and the connections can be re-used with new anodes. Davits are located in Brackish waters.

3Q. For all ICCP systems, what is the AST and Elevated Tank construction (dimensions, capacities, submerged surfaces, and CP system diagram)?

3A. See Attached Files: PAFB CP Report 2018-SPBICL 2-5-18.pdf

4Q. What type of piping exists (bell & spigot ductile iron pipe with bonded joints, or non-metallic bell & spigot pipe with metallic fittings, such as 45 and 90-degree Elbows, Hydrants, PIVs and other ferrous components)?

4A. See Attached Files: PAFB CP Report 2018-SPBICL 2-5-18.pdf

5Q. Some drawings indicate Insulating Flange Kits (IFK) are they only where indicated, which means there are only two in the entire system, or will we find more, not listed?

5A. See Attached Files: PAFB CP Report 2018-SPBICL 2-5-18.pdf.