18QA013_Atch_1a_PWS_Atch_1.pptx
PPTX presentation 52 KB Posted
- Attached to
- Update/Modigy Energy Management Control System (EMCS) Federal contract opportunity
- Solicitation number
- FA2521-18-Q-A013
About this file
18QA013_Atch#1a PWS Atch 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18QA013_Atch_8_Response_Question_.pdf | ||
| 18QA013_Atch_9_Drawings_Q&A_Response.pdf | ||
| 18QA013_Atch_5_SiteVisit_RulesoOfEngagement.pdf | ||
| 18QA013_Atch_2_SCA_07112018.pdf | ||
| 18QA013_Atch_4_Q&A_Template.pdf | ||
| 18QA013_Atch_6_Revised_Pricing_Data_Worksheet.xlsx | XLSX spreadsheet | |
| 18QA013_Atch_1b_PWS_Atch_2.pdf | ||
| 18QA013_Atch_1_PWS,_EMCS_2018.pdf | ||
| 18QA013_Atch_3,_InstallationAccessListRequestTemplate.docx | DOCX document | |
| 18QA013_Atch_7_J&A_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1500 PAFB
Building Level Network Control (BLNC)--SmartStructure 821 and 822 PAFB Building Level Network Control (BLNC)--SmartStructure 415 and 424 PAFB Building Level Network Control (BLNC)--SmartStructure Fiscal Year 2018 Project# Building Automation System Upgrade Attachment 1
533 PAFB
Building Level Network Control (BLNC)--SmartStructure
Provide Back-up of Existing UNC for development of new Automation Server Database Upload and back-up all current AHU, Chiller, and VAV Box DDC Controllers for use in development of Automation Server database (Qty. 1) Unitary Network Controller (UNC)-520 system repair and upgrade to SmartStruxure Automation Server (Qty. 1) Chiller Screen Graphics (Qty. 1) Air Handler Unit (AHU) Screen Graphics (Qty. 17) Variable Air Volume (VAV) Screen Graphics (Qty. 1) Exhaust Fan Control with CO2 sensor, cycle fan in the occupied mode (Qty. 2) AHU Micro-Zone DDC Controllers repair and upgrade to MNL-800 Controllers for AHU-1 and Chiller (Qty. 17) LonWorks VAV Terminal Boxes with existing Direct Digital Control (DDC) Controller convert for use in SmartStruxure Automation Server
Building 1500 Golf Course Specialized Service to Upgrade, Furnish and install; check out all devices Attachment 1a
Existing UNC Network Controller decommission and remove all control logic and graphics associated with Building 821 and Building 822.
Provide new Automation Server complete with Power Supply and back plate with (1) 10/100 Ethernet Port, (2) RS-485 ports, (1) built-in I/O bus port, integrated LonWorks functionality, BACnet/IP and BACnet MS/TP networks functionality, Modbus RS-485 master and slave configuration functionality, and Web Browser Support All graphics for the Building Level Network Controllers (BLNC) will be configured on the SmartStruxure Enterprise Server Workstation located in Bldg 1060 PAFB, FL.
(Qty. 1) SmartStruxure Automation Server located in Building 821 including: provide back-up of existing UNC program logic for development of new Automation Server Database. Upload and back-up all current Building 821 and 822 DDC Controllers for use in development of Automation Server database.
(Qty. 3) Air handler Unit (AHU) and Chiller Graphics Building 821 (Qty. 20) Variable Air Volume (VAV) Graphics Building 821 (Qty. 3) Fan Coil Unit (FCU) Graphics Building 822 (Qty. 3) AHU-1, Chiller, and Cooling Tower Micro-Zone DDC Controllers repair and upgraded to MNL-800 Controllers (Qty. 20) VAV MNL-FLO DDC Controllers repair and upgraded to MNL-V2R3 LonWorks controllers (Qty. 1) Underground communication cable between Buildings 821 and 822 (Qty. 3) FCU micro-zone/Packaged Equipment Module (PEM) DDC controllers repair and upgrade to MNL-800/mnL-200 Controllers
Buildings 821/822 Specialized Service Upgrade, furnish and install; check out all devices Attachment 1b
Attachment 1c Buildings 415/424 Specialized Service Upgrade, Furnish and Install and checkout devices
Provide back-up of four (4)existing DDC Controller for Chillers CH-1, CH-2, CH-3, and Cooling Tower Provide four (4) new MNL wall mount enclosure and back plane.
Provide four (4) new I/A Series MicroNet 800 Fully Programmable, Interoperable, LonWorks Based Card.
All graphics for the Building Level Network Controllers (BLNC) will be configured on the SmartStruxure Enterprise Sever Workstation located in Bldg 1060 PAFB, FL.
(Qty. 1) UNC-520 system upgrade to SmartStruxure Automation Server (Qty. 14) AHU screens for graphical user interface.
(Qty. 3) DX Split System screens for graphical user interface.
(Qty. 1) CEP Graphic Screens (Qty. 14) AHU Micro-Zone DDC Controllers repair and upgrade to MNL-800 Controllers (Qty. 3) DX Split System DDC Controllers repair and upgrade to MNL-200 Controllers (Qty. 1) CEP Micro-Zone DDC Controllers Repair and Upgraded to MNL-800 Controllers
Provide Back-up of Existing UNC for development of new Automation Server Database Provide back-up of twenty (20) existing DDC Controller and convert database for use in SmartStruxure Automation Server Convert MicroZone II controller logic to new WorkPlace Tech program for new MNL-800 controllers.
Test operation of control logic to include all inputs, outputs, graphics, and connectivity back to SmartStruxure Enterprise Server Workstation located in Bldg 1060 PAFB, FL.
(Qty. 1) UNC-520 Upgrade to SmartStruxure Automation Server including (Qty. 3) FCU and DX Split System DDC Controllers Repair and Upgraded to MNL-200 Controllers (Qty. 6) AHU screens for graphical user interface.
(Qty. 1) Fan Coil Unit (FCU) Graphics (Qty. 2) DX Split System screens for graphical user interface.
(Qty. 6) AHU Micro-Zone DDC Controllers repair and upgrade to MNL-800 Controllers for AHU-1 and Chiller (Qty.10) new MNL wall mount enclosure and back plane.
(Qty. 10) new I/A Series MicroNet 800 Fully Programmable, Interoperable, LonWorks Based Controller Card.
Attachment 1d Buildings 533- Specialized Service Upgrade, Furnish and Install: checkout devices
Attachment 1f
Specialized service details of requirements Provide new Building Level Network Control (BLNC) complete with power supply and back plate with (1) 10/100 Ethernet Port, (2) RS-485 ports, (1) built-in I/O bus port, integrated LonWorks functionality, BACnet/IP and BACnet MS/TP networks functionality, Modbus RS-485 master and slave configuration functionality, and Web Browser Support Provide back-up of existing DDC Controllers. Disconnect and remove existing Schneider Electric UNC Network Controller. Safeguard 120vac power, LonWorks communication cable, and Ethernet network cabling for reconnection to new building level network controller.
Configure new BLNC for connection to the SmartStruxure Enterprise Server.
Re-program all information for BLNC taken from UNC global logic, Time of Day Schedules, and Alarms as required BLNC will allow completion of Graphical User Interface Screens onto SmartStruxure Enterprise Server.
Program all inputs, outputs, set-points, and occupancy commands for use in graphical user interface screens.
Test operation of control logic to include all inputs, outputs, graphics, and connectivity back to Central Server. One (1) Year Warranty to include service labor on site. Upgrade controllers of applicable Air Handlers, Direct Expansion Split Systems (DX) , Chillers and Cooling Towers to MNL-800 Controllers Provide new MNL wall mount enclosure and back panes.
Provide new I/A Series MicroNet 800 Fully Programmable, Interoperable, LonWorks Based Controller Card. Connect all field device cables and 24vac power as required.
Provide control relay and current switch for applicable exhaust fan start/stop and status control.
Provide applicable space CO2 sensors to cycle exhaust fan in the occupied mode.
Convert applicable controller logic to new WorkPlace Tech program for new MNL-800 controllers.
Upgrade all applicable VAV MNL-FLO to MNL-V2R3 LonWorks Controllers Install new burial LonWorks cable inside existing underground conduit between applicable facilities.
Provide communication surge protection devices on each end of applied underground communication cables Upgrade any existing Fan Coil PEM DDC Controllers to MNL-800/mnL-200 Controllers. Install new LonWorks communication cables applied between new MNL-800 controllers and new Automation Servers.
Upgrade applicable DX Split system controllers to MNL-200 Controllers.
Re-connect all field device cables, communication cable, and 24vac applied power as required.
Provide new I/A Series MicroNet 800 hardware with: Fully Programmable, Interoperable, LonWorks Based Controller Cards Save and convert controller database of applicable terminals, devices and existing controllers for use in SmartStruxure Automation Server All removed UNC and controllers shall be returned to the Air Force.
Any defective device found needing repaired will be reported to Air Force shops for corrective action.
LIST OF SENSORS & CONTROLS AFFECTED BY BUILDING LEVEL NETWORK CONTROLLER integral with Snyder Electric software.
Variable Frequency Drives with analog controls on SF, RF, Pumps Speed of VFD Fault Control Air - Compressors Hot Water Supply Sensors Hot Water Return Sensors Pumps - On/Off Status of Pumps Boilers - On/Off Status of Boiler Humidifier - On/Off Chiller On/Off Status of Chiller Diverting Valves CW Pumps - On/Off Status of Pumps DX Units Dry Coolers Chilled Water Supply Chilled Water Return Radiant Heater - On/Off Status of Radiant Heaters Unit Heaters - On/Off Status of Unit Heaters
Attachment 1g
Mixed air Discharge air Return air Outside air Humidity Sensors Hot Decks Cold Decks Static Pressure Duct Pressure High Static Alarm CFM Flow Air Quality Supply Fan start/stop Status of Supply Fan Return Fan start/stop Status of Return Fan Freezestats Exhaust Fan start/stop Status of Exhaust Fan All Dampers - Outside, Return, Mixed, Relief, Face & Bypass, Zones, etc Heating Valves Cooling Valves Zone Valves DX Coil - On/Off Status of DX Coil
File details come from the government source that posted it.