Turn-Key_Mobile_Telemetry_Requirements_Documnet.pdf
PDF 97 KB Posted
- Attached to
- Turn-Key Mobile Telemetry System Federal contract opportunity
- Solicitation number
- FA2521-17-Q-Z003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mobile_Telemetry_Combined_Synopsis-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mobile Telemetry System Procurement Requirements Document
10 August 2017
1. The 45th Range Management Squadron has a requirement for a turn-key mobile telemetry system which will augment existing Eastern Range (ER) telemetry (TLM) systems that provides limited off-the-pad coverage for current and future ER launches. The system must receive, record, and process rocket telemetry formats in use on Cape Canaveral Air Force Station and provide the capability to be field-configurable to support emergent telemetry formats.
The TLM system shall consist of all hardware and software components that are fully configurable to support existing and known future telemetry formats listed in paragraph two, while providing seamless integration into ER communications infrastructure for transport of telemetry streams. The mobile system shall consist of an antenna system capable of remote deployment/operation and a self-contained, mobile, tri-band telemetry system.
This acquisition will procure a Commercial Off-The-Shelf (COTS), self-contained TLM system to meet or exceed the technical requirements identified in paragraph two. The delivery will include operator training, maintenance and engineering documentations, initial spare, and a recommended spare parts list.
2. Distinguishing, salient characteristics and performance requirements:
a. The mobile telemetry system shall, at a minimum, meet the following requirements:
1) Tri-band (L, S, C)
2) Modulation: PCM-FM (BPSK, QPSK, A/O/U/SO QPSK); Multi-h CPM
(IRIG 106-13 Tier III Multi-h CPM) Forward Error Coding (FEC) (LDPC, Viterbi)
3) Adaptive equalization to reduce effects of multipath 4 links
4) Direct digital recording of IF/RF signals
5) Digital recording of telemetry data
6) TLM distribution over IP: TMoIP (UDP/Ch10)
7) Remotely controlled auto-track antenna system (trailer mounted)
8) Infra-Red optical tracking capability
9) Separate, deployable, trailered, auto-tracking antenna system capable of independent, remote operation
10) Self-contained, environmentally controlled equipment van such as a
“sprinter van” or “panel van” to accommodate two operators and equipment.
11) Equipment van shall include sufficient power generation capability to power all systems, including telemetry, comm, antenna and environmental systems.
b. IA compliance
Mobile Telemetry System Procurement Requirements Document
10 August 2017
1) The COTS system must be capable of being cyber-certified for operation on an Air Force network and perform/provide the following:
2) Contractor will coordinate/work with/etc. 45 SW representatives to select Risk Management Framework (RMF) controls using NIST SP 800-53 current revision.
3) Contractor shall deliver network topography drawings that depict the system authorization boundaries and physical network configuration upon system delivery
4) Contractor shall provide Security Technical Implementation Guide (STIG) Applicability List for hardware and software
5) Contractor shall perform and provide STIG compliance scans.
6) Contractor shall perform and provide vulnerability scans same as above
(all scans and reports of the results shall be provided)
7) Contractor shall provide Security Assessment Reports that documents the findings from the STIG compliance scans IAW RMF controls
8) Contractor shall provide support for authorization and accreditation
c. Inspections and Acceptance Testing
1) Perform one check-out test upon delivery.
2) Perform one demonstration test on or near CCAFS during a live launch after delivery (two days, to be scheduled after delivery)
d. Deliverables:
1) System IA compliance/compliance capability report in format as specified by the Government after award.
2) COTS technical manuals.
3) COTS maintenance manuals.
4) Initial spares, as recommended by the OEM.
5) Engineering documentation.
3. The turn-key mobile telemetry system and deliverables shall be delivered NLT 120 days from contract award.
File details come from the government source that posted it. Updated .