Q A_and_Revision_1.docx

DOCX document 14 KB Posted

Attached to
Weapon Storage Facility Construction Integration Support Federal contract opportunity
Solicitation number
FA2360-16-R-8045
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

About this file

Q A and Revision 1 to the Combined Synopsis/Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Weapon Storage Facility Construction Integration Support, newest first.
File Type Posted
Attachment_6_-_Provisions_dated_17_Aug_16.docx DOCX document
Attachment_1_-_PWS_dated_17_Aug_16.docx DOCX document
Attachment_1_-_PWS.docx DOCX document
Attachment_1_-_PWS.docx DOCX document
Attachment_6_-_Provisions.docx DOCX document
Attachment_4_-_Schedule_of_Services.docx DOCX document
Attachment_5_-_Clauses.docx DOCX document
Attachment_2_-__DD_254.pdf PDF
Attachment_7_-_DOL_Wage_Determination.pdf PDF
Attachment_3_-_CDRLs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A and Revision 1 to the Combined Synopsis/Solicitation for FA2360-16-R-8045, Weapons Storage Facility Construction Integration Support

QUESTION and ANSWER

1. Question: Attachment 4 – Services Summary does not include an ODC CLIN. Where should travel costs be priced? What are the details for trip duration and location?

Answer: Travel costs should be included in CLINS X001, X002, and X003 as annotated in each CLIN description. PWS paragraph 3.5.1. specifies the estimated number of trips for each CLIN. At this time we can’t specify exact location of the trips but they will all take place CONUS (contiguous US). Each trip is estimated to be two days in length, not including travel. Attachment 1 – PWS will be revised to identify trip length.

REVISION 1 to the COMBINED SYNOPSIS/SOLICITATION

1. Attachment 1 – PWS, Paragraph 3.5.1 Travel is hereby revised as follows to clarify average trip length:

FROM: 3.5.1 Contractor employees may have occasion under this contract to travel from their regular duty location to various CONUS temporary duty locations. (CDRL A003)

Estimated Trips per year per PWS paragraph

3.1 Integration Support – 12 trips per year

3.2 Schedule Support – 6 trips per year

3.2 Administrative Support – 2 trips per year

TO: 3.5.1 Contractor employees may have occasion under this contract to travel from their regular duty location to various CONUS (contiguous US) temporary duty locations. Average trip length is 2 days, not including travel. (CDRL A003)

Estimated Trips per year per PWS paragraph

3.1 Integration Support – 12 trips per year

3.2 Schedule Support – 6 trips per year

3.3 Administrative Support – 2 trips per year

2. “Attachment 1 – PWS dated 10 Aug 16”, is hereby replaced with Attachment 1 – PWS dated 15 Aug 16.”

3. All other terms and conditions remain unchanged.