2_-_1423_DIDs.pdf
PDF 1 MB Posted
- Attached to
- Humidity Generator Federal contract opportunity
- Solicitation number
- FA2263-19-R-A003
About this file
CDRLs - data requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1_-_PD_Rev4_19M-290A-TE_ATCH.pdf | ||
| Solicitation_-_FA226319RA003.pdf | ||
| 5_-_Section_M_Evaluation_Basis_for_Award_LPTA.docx | DOCX document | |
| 4_-_Section_L_Proposal-Requirements_LPTA_Commercial.pdf | ||
| 3_-_Anticipated_Delivery_Locations.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
( 1 Data Item) OM8 No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and compktting af'ld reviewing the collection of information. Sand comments regarding this burden estimate or any other aspect of this collection of tnformation, including suggestions for reducing the burden, to the Oepartmant o1 Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. li•ted in Block E.
A. CONTRACT LINE ITEM NO. 8. EXHIBIT C. CATEGORY:
A(FY 19) TDP TM X OTHER
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F.CONTRACTOR
Humidity Generator
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
AOOl Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.) I 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-86-01 PD 19M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA
D
ASREQ
SUBMISSION Draft
See BLK 16 Reg Repro
16. REMARKS
BLK 8: The Government has 30 calendar days to review the preliminary draft. The 1.AFMETCAL contractor has 10 calendar days after receipt of Government comments to prepare Attn; Kathy Vaccaro 1 and deliver revised data. Criteria for approval shall meet the Government 813 Irving-Wick Drive W Honoo Bldg comments. Refere;nce the contract number in all correspondence. Final approval Heath. Ohio 43056 after first producti,on acceptance.
BLK 9: The following statement shall be included on the manuals:
DISTRIBUTION STATEMENT D: DoD and US DoD �ontractors only
Blk 12: No later tb.an 120 days after contract award, 1 copy(ies) of the final manual Ship to addressee 1 is(are) required on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a. If manuals are available electronically, the file or web link may be sent to kathryn.vacarro@us.af.mil. Reference contract number in all correspondence.
Blk 13: No later t�an 30 days after first production unit is accepted, 1 copy(ies) of the final manual is required. Manual shall be on CD/DVD in indexed Portable 1 Document Format (iPDF). Ship to addressee #1 listed in BLK 14a.
Blk 13: Concurrent with delivery of production units contractor shall furnish and Ship with unit 21 pack one (1) set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit.
Blk 13: No later than 180 days after contract award, concurrent with delivery of Ship with unit 1 first production units, the contractor shall furnish and pack 1 set of manuals with each of the first production units. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
15.TOTAL 0 25 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
CAPUANO.FRAN =��=-R140320965 2/6/19 SKINNER.KEVIN ��:1��1::fu1102•22122 2/6/19 K.R.1403209658 8 .L.11.1024227223 �ate, 2019.020610o42o01--05'00' Date: 2019.02.06 09:51:43-05'00'
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of 5 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Attachment 2
(1 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY 19) TOP TM X OTHER --- - -
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
Humidity Generator
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80798C PD 19M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
B. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA
D
ASREQ
SUBMISSION Draft
See BLK 16 Reg Repro
16. REMARKS
Blk 12: Concurrent with delivery of production unit contractor shall furnish and Ship with unit 22 pack one (1) calibration certificate with each unit.
15. TOTAL 0 22 0
G. PREPARED BY H.DATE I. APPROVED BY J. DATE
CAPUANO.FRAN
Digitally signed by SKINNER.KEVIN ��;����
;ii ;:,:t,,102•22122
CAPUANO.FRANK.R.140320965 216119 216/19
K.R.1403209658 8 .L.11.1024227223 � ••• 201902.061043,09--05"00"
Date: 2019.02.06 09:59:15-05'00'
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 5 Pages
17. PRICE GROUP
18. ESTIMATED
CONTRACT DAT A REQUIREMENTS LIST Form Approved (2 Data Items) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188}. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:B(FY 20) TDP
TM
OTHER
D. SYSTEM/ITEM
I E. CONTRACT/PR NO. F. CONTRACTORHumidity Generator 1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B001 Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-86-01 PD 19M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See Blk 16
b. COPIES8. APP CODE D 11. AS OF DATE 13. DATE Of SUBSEQUENTSUBMl§�g�Jk 16
a. ADDRESSEE Final
NIA ASREQ Draft Reg Repro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall Ship with unit 17furnish and pack one (I) set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specificquantities will be identified by issuance of a modification to exercise option quantities.
15.TOTAL 0 17 0 1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B002 Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.} , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-QCIC-80798C PD l9M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See Blk 16 b . COPIES8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final SUBMISSION Draft
NIA ASREQ See Blk 16 Reg Repro
18. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 17 and pack one ( l ) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition. Specificquantities will be identified by issuance of a modification to exercise option quantities.
15. TOTAL 0 17 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
CAPUANO.FRAN
Digitally signed by
SKINNER.KEVIN ��,��k &ig
K�l�LIL102422722 CAPUANO.FRANK.R.140320965 2/6/19 2/6/19 K.R. 1403209658
.L.11.1024227223 � ••• 20190206104420--05"00" Date: 2019.02.06 09:58:57 -05'00'
DD FORM 1423-2. AUG 96 PREVIOUS EDITION MAY BE USED. Page L of __i_ Pages
17. PRICE GROUP
I 18. ESTIMATED TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED TOTAL PRICE
The public reporting burden for this collectKm of information is estimated to average 220 hours per response, including the time for reviewing instructions, searchtrlg existing data sources, gathering and maintaining the data needed, and completing and reviewing the collectKJn of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704·0188). Respondents should be aware that notwi1hstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collectton of informatton if rt does not display a currently valid 0MB control number. Pteaae do not return your form to the above organization. Send compteted form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C(FY 21) TDP
TM
OTHER
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F.CONTRACTOR
Humidity Generator
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
COOl Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-86-01 PD I 9M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See Blk 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT o. ADDRESSEE Final
NIA ASREQ SUBMl§�g�lk 16 Draft Rog Repro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall Ship with unit 18 furnish and pack one (1) set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
16. TOTAL 0 18 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
C002 Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80798C PD l 9M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See Blk 16 b. COPIES B. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT o. ADDRESSEE Final
SUBMISSION Draft NIA ASREQ See Blk 16 Rog Repro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 18 and pack one (I) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
15. TOTAL 0 18 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
CAPUANO.FRAN Digitallysigl'l8d by SKINNER.KEVIN ��i� aJ ig K�l�Lll 102422722 CAPUANO.FRANK.R.140320965 2/6/19 2/6/19 K.R.1403209658 8
.L.11.1024227223 �.,., 201902.0610 45'22-05"00' Data: 2019.02.06 10:00:25-05'00'
DDFORM1423�.AUG96 PREVIOUS EDITION MAY BE USED. Page L of _5_ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
CONTRACT DAT A REQUIREMENTS LIST Form Approved
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents sho1.1ld be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMS control number. Please do not return yow- form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D(FY 2 2) TOP
TM --- OTHER
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F.CONTRACTOR
Humidity Generator
1. DATA ITEM ND. 2. TITLE OF DAT A ITEM 3. SUBTITLE
DOOi Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-8 6-01 PD 19M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
NIA
REQUIRED ASREQ See Blk 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA ASREQ SUBMl§�13lk } 6 Draft Rog Repro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall Ship with unit 2 1 furnish and pack one (1) set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquis_ition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
15. TOTAL 0 21 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
D002 Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
D1-QCIC-80798C PD l 9M-290A-TE Atch AFLCMC/WNMM
7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED
ASREQ See Blk 16 NIA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
SUBMISSION Draft NIA ASREQ SeeB1k16 Reg Repro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 21 and pack one (I) calibration certificate with each unit.
The liste_d number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
15. TOTAL 0 21 0
G. PREPARED BY H. DATE I. APPROVED BY J.DATE
CAPUANO.FRAN Digitally signed by
SKINNER.KEVIN ��=���,::\11102•22122 CAPUANO.FRANK.R.140320965 2/6/1 9 2/6/19
K.R.1403209658 8
.L.11.1024227223 �alee 20190206104602.QS"OO" Date: 2019.02.0610:00:25-0S'OO'
DD FORM 1423-2. AUG 96 PREVIOUS EDITION MAY BE USED. Page L of __i_ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TM-86-0lQ 27 Oct 2017 1-01: AF TMSS Linear TMs
Air Force Technical Manual Contract Requirements (TMCR) for
AIR FORCE CALIBRATION AND METRO LOGY (AFMETCAL} PROGRAM
Humidity Generator
ATTACHMENT DD FORM 1423, TO CORL SEQUENCE NUMBER 001, EXHIBIT A REQUEST FOR
PROPOSAUCONTRACT:
Date: 16 January 2019
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing, additional tailoring to the Technical Order Manager Agency/ Agent (TOMA), Government Program Manager (PM), and Procuring Contracting Officer (PCO) for consideration. The tailored TMCR shall be attached to the Contract Data Requirements List (CDRL) for Technical Order (TO) delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal Statement Of Work (SOW). Air Force (AF) TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Management, located at http://www.tinker.af.mil/Home/Technical0rders.aspx. A copy may also be obtained from the Program TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The Contractor shall develop and deliver technical manuals in accordance with (IA W) this TMCR that supports the AFMETCAL requirements for technically usable manuals. The technical manuals will include Operation and Maintenance Instructions, Illustrated Parts Breakdown, and Calibration Process/Procedure in a Portable Document Format (PDF). PDF TO Publications may be produced and distributed as physical media (Paper/CD) or electronically via Enhanced Technical Information Management System (ETIMS) electronic TO Viewer (eTOV).
3. Commercial Manuals. Contractors shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to Government review and approval. Contractors shall use Data Item Description (DID) DI-TMSS-80067C, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment (CF AE/CFE) Notices, to provide recommendation data. A copy is available through ASSIST at http://quicksearch.dla.miVqsSearch.aspx.
3 .1. The AF requests the ability to electronically store, print, distribute, update and decollate the commercial manual to allow for printing. Commercial manuals shall be delivered as Portable Document Format (PDF) unless otherwise specified.
3.2. Approved Commercial-Off-The-Shelf (COTS) Manuals shall be delivered with an Identifying TO Publication Sheet (ITPS), IAW MIL-PRF-32216, Performance Specification: Evaluation Of Commercial Off-The-Shelf (COTS) Manuals And Preparation Of Supplemental Data. All PDF files of commercial data shall be non-password protected to allow the AF to decollate the manual for printing.
TM-86-01 Q 27 Oct 2017 1-01: AF TMSS Linear TMs
3.3. If the proposed COTS data is found to be in�ufficient after review by the Government, the Contractor shall prepare supplemental data for the COTS manual as required IA W Military Standard (MIL-STD)-38784. If the COTS data cannot be supplemented sufficiently the Contractor may be tasked to develop new TM data IA W the applicable TMSS listed in Section 2, Table 1.
4. Technical Manual Specifications and Standards (TMSS) Tailoring. The contractor shall develop all TMs IAW most current version of applicable TMSS for the type manual being developed and comply with the Specification/Standard Interface Records (SIRS) provided within Section 3.
5. Subsequent TO/Data Requirements. (Deleted)
6. TO Development. TOs shall be written to a scope and ·depth of coverage to support the AFMETCAL operations and maintenance concepts.
6.1. Standard Generalized Markup Language (SGML) tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, Graphics Format Guidelines. For assistance with illustration requirements contact AF TMSS via ( e-mail: SGMLSupport@us.af.mil).
6.2. (Deleted)
7. TO Numbering. (Deleted)
8. Data Rights. Contractors shall comply with 10 U.S.C. 2320 and cognizant Defense Federal Acquisition Regulation Supplement (DF ARS) provisions and clauses in providing Unlimited Rights for all source data, TO publications, and TO updates prepared specifically for the contract. Government rights in data are specified in the DFARS, 252.227-7013, Rights in Technical Data, Noncommercial Items, 252.227- 7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, and 252.227-7015, Technical Data-Commercial Items. The Government shall be given · Unlimited Rights for all Government-funded business rules (tailoring and application methods and procedures) and documented business processes developed under the contract for the purpose of TO development. For all data delivered to the Government with other than Unlimited Rights, the Contractor shall assert their data rights IA W DF ARS 252.227-7017, Identification and Assertion of Use, Release, or Disclosure Restrictions. The Contractor shall pass through and enforce all requirements in this TMCR to all sub-Contractors.
9. Classification, Distribution, Destruction, Disclosure, Export Control Notices, and Cyber Security.
Contractors shall recommend the correct markings and controls for classified and restricted distribution data and TOs IA W the program's Security Classification Guide (SCG) and Department of Defense Manual (DODM) 5200.01, Department of Defense Instruction (DODI) 5230.24, Department of Defense Directive (DODD) 5230.25, Air Force Instruction (AFI) 16-1404, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or https://assist.dla.mil/online/start/index.cfm). The markings and notices shall be reviewed during In-Process Reviews (IPR). The Contractor shall also apply policy and procedures for Cyber Security Protection IA W AFI 33-200, Information Assurance (IA) Management, AFMAN 17-1301, Computer Security (COMPUSEC), and MPTO 00-33B-5008, Remanence Securityfor Information Systems. NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
10. TO Quality. Contractor proposals shall describe how the Government will be allowed to interact with the Contractor's TO development team. The Contractors shall ensure prepared TOs are: a) technically accurate and safe; b) written to a scope and depth of coverage to support the operations and maintenance concepts; c) properly classified and marked with export control and distribution limitation statements.
11. TO Delivery. TO file delivery requirements are located in Section 2, Table 3 of this document.
11.1. MIL-SPEC (SGML) Tagged Files. The Contractor shall parse all SGML files required for the TOs prior to Government delivery and shall verify the SGML is compliant with the appropriate DTD.
NOTE: The Government will parse the files prior to acceptance using the public domain SGML parser (http://www.iclark.com/sp/).
12. Source Data Maintenance. (Deleted)
13. TO Maintenance. (Deleted)
14. Schedules. (Deleted)
15. Time Compliance Technical Orders (TCTOs). (Deleted)
SECTION 2. TM TYPE AND DELIVERY REQUIREMENTS
NOTES:
• Mark the TM Type Selection Tables indicating the applicable TO types and related specifications.
(NEW DEVELOPMENT) LINEAR TM TYPE (PUBLICATION) SELECTION TABLES.
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(Humidity Generator)
Title or Type of Manuals Specification
1. Inspection TOs MIL-DTL-5096
a. Inspection and Maintenance Requirements (-6) Manual
b. Acceptance and Functional Check Flight (FCF) Procedures (-6CF) Manual
c. Acceptance and Functional Check Flight (-6CL) Checklist
d. Inspection Workcards (-6WC)
e. Maintenance/Operations Checklists
2. Cargo Aircraft Loading and Offloading TOs MIL-DTL-5288
a. Loading Instructions Manual
b. Nuclear Weapon Cargo Loading Manual
c. Checklists
3. Weight and Balance (Aircraft) MIL-DTL-5920
a. Loading Data Manual
b. Sample Basic Weight Checklists
4. Flight Manuals MIL-DTL-7700
a. Flight Manual
b. Performance Data Manual
c. Mission Crew Manual
d. Supplemental Manual
e. Abbreviated Flight Crew Checklist
7. Munitions/Weapons Loading Procedures, Non- nuclear and Nuclear TOs MIL-DTL-9977
a. Nuclear Weapons Basic Information and Loading Procedures
b. Nuclear Weapons Loading Procedures
c. Non-nuclear Munitions Basic Information
d. Non-nuclear Loading Procedures
e. Non-nuclear Munitions Loading Standard Data Packages (SDPs)
f. Loading Procedures Checklist
g. Single Loading Procedures Checklist
h. Integrated Loading Procedures Checklists
i. Family Group Loading Procedures Checklist
j. Nuclear Weapons Loading Procedure Checklists
k. Functional Check Procedures Checklist
l. NATO Stage B Cross-Servicing Checklists
Required
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D D D D
D
D D D D D
m. End of Runway (EOR) Procedures Checklist
8. Space Operations and Support Documentation TOs
- -·-·--·---.. -· D ___
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(Humidity Generator)
Title or Type of Manuals
-- MIL-SPEC (Intercontinental Ballistic Missiles) -- MIL-SPEC (Space)
a. Operations Manual
b. Operations Checklists
c. Technical Manuals and Related Checklists
9. Nuclear and Non-nuclear Weapon Delivery and Aircrew Procedures Manuals and Checklists
Specification
MIL-PRF-38311
MIL-PRF-38314
MIL-DTL-38384
Required o D D D D
a. Non-nuclear Weapon Delivery Manual D
b. Aircrew Nuclear Bomb Delivery Manual (Strategic Bomber Aircraft) D
c. Aircrew Nuclear Missile Delivery Manual (Strategic Bomber Aircraft) D
d. Aircrew Nuclear Bomb Delivery Manual (Tactical Aircraft) D
e. Non-nuclear Weapon Delivery Checklist D
f. Nuclear Weapon Delivery Checklist (Strategic Bomber Aircraft) D
g. Aircrew Nuclear Bomb Delivery Checklist (Tactical Aircraft) D
_____ h._�on-nuclear Weapon Delivery Source p-��acka es ----------·--M··--·- _______
D -·
10. Work Unit Code Manual MIL-DTL-38769
a. Standard WUC Manual
b. Two Chapter Manual
c. Three Chapter Manual
11. Calibration Procedures
12. Time Compliance Technical Orders (TCTOs)
a. TCTO -· ___ b. TCTO Supplement
13. Aircraft Battle Damage Assessment and Repair TOs
14. Illustrated Parts Breakdown
15. On-Equipment Organizational Maintenance Manual Set
a. General Equipment (GE) Manual
b. General System (GS) Manuals
c. Combined GE & GS Manual
d. Job Guide (JG) Manuals
e. Fault Reporting (FR) Manual
f. Fault Isolation (FI) Manual
g. Wiring Data (WD) Manual
h. Schematic Diagram (SD) Manual
MIL-DTL-38793
MIL-DTL-38804
D D D
D D
MIL-DTL-87158 0
MIL-DTL-38807
MIL-DTL-83495
D
D
D
D
D
D
D
D
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(Humidity Generator)
Title or Type of Manuals Specification Required
16. Operation and Maintenance Instructions in Work Package Format MIL-DTL-87929
a. Maintenance Manuals
(1) Organizational Maintenance IX!
(2) Intermediate Maintenance D
(3) Depot Maintenance D
(4) Combined (l&D) Maintenance D
(5) On Condition Maintenance D
b. Operation & Maintenance Instruction Manuals IX!
C. Special Manuals
(1) Aircraft Engine Testing and Trending Procedures D
(2) Aircraft Power Package Testing Procedures D
(3) Static Firing of Missile Motors D
(4) System Peculiar Corrosion Control D
(5) Nondestructive Inspection (NDI) D
(6) Aircraft Structural Integrity Program (ASIP) D
(7) ATE Operator Test Procedures D
(8) Special Requirements for Storage and Maintenance Procedures; D AUR Munitions/Launchers and Associated Support Equipment, Conventional Components and CMBR Agents
(9) Parachute Packing Procedures D
(10) Operators Instructions (Hand-Held Flight Computers) D
(11) Installation-Engineering Facility (Ground C-E Equipment) D
d. Checklists (IA W MIL-DTL-5096) D
e. With Illustrated Parts Breakdown D
17. Commercial Manuals (Evaluate according to MIL-PRF-32216) IX!
18. Aircraft Cross-servicing Guide MIL-DTL-22202 D
TM-86-01 Q 27 Oct 2017 1-01: AF TMSS Linear TMs
NOTES:
TABLE 3 - LINEAR TM DELIVERY REQUIREMENTS
FOR THE AFMETCAL
Humidity Generator
• For Paper media delivery indicate required quantity
DELIVERY SCHEDULE
Event ¢Number of days data required prior Technical First Administrativ( to event¢ Review(s) Article/First (Logistics)
(120 DACA) Production (30 Unit DAFAOK)
(30 DACA)
-0-Enter physical mailing address, electronic Legend: DACA - After Contract Award
Final TO Distribution (Ship With Prod Units)
(90
DAFAOK)
delivery location or web access point -0- OAF AOK - Days after First Article accepted (passes Acceptance testing)
Engineering (Draft) Copy
IPDF / 1 IPDF/ IPDF / !PDF/
AFLCMC/WNMRP/ AFMETCAL Division
ATIN: Kathy Vaccaro kathryn. vaccaro@us.af.mil 813 Irving Wick Drive West, Bldg 2 Heath, Ohio 43056 First Production Copies ( ship w / l st Prod.)
Bionetics Transportation
IPDF / IPDF / 1 IPDF/ IPDF /
ATNN: Carol Cooperrider 813 Irving Wick Drive West, Bldg 4, Door 15 Heath, Ohio 43056 Administrative (Logistics) Copies AFLCMC/WNMRP/ AFMETCAL Division
IPDF / IPDF / IPDF / 1 IPDF /
A TIN: Kathy Vaccaro kathryn. vaccaro@us.af.mil 813 Irving Wick Drive West, Bldg 2 Heath, Ohio 43056
Final (Production) Copies (ship w/ unit) IPDF / IPDF / IPDF / IPDF / 14 Bionetics Transportation
ATNN: Carol Cooperrider 813 Irving Wick Drive West, Bldg 4, Door 15 Heath, Ohio 43056
Total Paper Copies Required: 1 1 1 77
SECTION 3. DELETED
DATA ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE/REPORT
Number: DI-QCIC-80798C
AMSC Number: F9766
DTIC Applicable: No
Approved Date: 20170123
Limitation: N/A
GIDEP Applicable: No
Preparing Activity: 36 Project Number: QCIC-2017-003
Applicable Forms: N/A Use/Relationship: The Calibration Certificate/Report documents calibration certificates or reports accompanying the calibrations performed on Department of Defense (DoD) test, measurement, and diagnostic equipment.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable to contracts requiring calibration of test equipment prior to delivery.
This DID is consistent with ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, requirements for calibration reports or certificates.
(Copies of this document are available online at http://www.iso.org.)
c. This DID supersedes DI-QCIC-80798B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The calibration certificate or report shall include:
a. Title (e.g., calibration certificate or calibration report);
b. The name and address of the laboratory and the location where the calibrations were carried out, if different from the address of the laboratory;
c. Unique identification of the calibration certificate or test report (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the calibration certificate or test report;
d. The name and address of the client or customer;
e. Identification of the method used;
f. A description of, the condition of, and the unambiguous identification of the item(s) tested or calibrated;
g. The date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
D1-QCIC-80798C
h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. The test or calibration results with, where appropriate, the units of measurement;
j. The name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the calibration certificate or test report;
k. Where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
I. The conditions (e.g., environmental) under which the calibrations were made that have an influence on the measurement results;
m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. Evidence that the measurements are traceable.
End of D1-QCIC-80798C.