DD1423_A_B_DIDS_285A_B.pdf
PDF 2 MB Posted
- Attached to
- Acoustic Calibration Standard Upgrade Federal contract opportunity
- Solicitation number
- FA2263-16-R-0002
About this file
Section J - Attachment 1 - Data Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S1_4_(005).pdf | ||
| FA2263-16-R-0002.docx | DOCX document | |
| 16-R-0002_P00001.docx | DOCX document | |
| Anticipated_Delivery_Locations.doc | DOC document | |
| SGFP_V5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DAT A REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 11 O hours per response , including the time for reviewing _instru.ctions, searc~ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information . Send comments regarding this burden estimate or any otlier aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate 10704-01881 . Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information ii it does not display a currently valid OMB control number. Pleau do not return your form to the abovo org1nizatlon. Send completed form to the Government Issuing Contrecting Officer for the Contract/PR No. listed in Bfoci: E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY 16) TDP TM x OTHER --- - -
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
Acoustic Calibration Standard Upgrade
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
AOO! Commercial-Off-The-Shelf (COTS) Manual Part A
4 . AUTHORITY (Data Acqvisirion Docvmenr No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-TMSS-80527C PD 16M-285A-SO Atch AFLCMC/WNMEM
7. OD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
B. APP CODE 11. AS OF DATE 13 . DATE OF SUBSEQUENT o. ADDRESSEE Final
NIA D
ASREQ
SUBMISSION Draft See BLK 16 Rag Repro
16. REMARKS
BLK9: The following information shall be included on the manuals: I. AFMETCAL
DISTRIBUTION STATEMENT D: DoD and US DoD contractors only. Attn: Kathy Vaccaro
813 Jrving· Wicl1 Drive W H0J1on Bldg
Heath, Ohio 43056
Blk 13: No later than 90 days after first prod. ok , concurrent with delivery of production units, the contractor shall furnish and pack 1 set of manuals with Ship with Unit ?
each of the production units. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
/) /' 15. TOT* 0 2 0
G. PREPARED BY H. DATE
I. AL~~:Y/2,10
J, DATE
~~;:J1<1J~ OJ 17/ ,~- l1!~/5- DD FORM 1423-t FEB 2001 PREVIOUS EDITION MAY BE USj'D. Page of Pages
I
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 11 O hours per response, including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information . Send comments regarding this burden estimate or any ether aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense , Executive Services and Communications Directorate (0704·0188) . Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does net display a currently valid OMB control number . Please dp not return your form to the above organization. Send completed form to the Government luulng Contracting Officer for the Contract/PR No. llated in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY 16) TOP TM x OTHER --- --
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Acoustic Calibration Standard Upgrade
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Software User Manual Part A
4. AUTHORITY !Data Acquisition Document No .} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81443A PD 16M-285A-SO Atch AFLCMCIWNMEM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
8 . APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA D
ASREQ
SUBMISSION Draft See BLK 16 Reg Re pro
16. REMARKS
I. Ship with unit 2 Blk 13 : Concurrent with delivery of production unit contractor shall furnish and pack 1 set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit.
/\ /') 15~TOTAL 0 2 0
G. PREPARED BY H.DATE '·r;r:yz& J. DATE
~?A~ - q f 17 /Ir) i;J. /~IS DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE U¥0. Page of • Pages --- ---
17. PRICE GROUP
CONTRACT DA TA REQUIREMENTS LIST Form Approved (2 Data Items} OMB No. 0704-0188
I The public repo1ting burden fOf this cofl1ction of informetion it estimated to 1verage 220 hours per response, including the tim• for reviewing tn11ruetion•. 1earcliing exiating da11 scurc ... gathering and maintaining the .d•t• .needed, and completing and reviewi"11 tha collection of information. Send commentl re~ordlng thi5 burden ollimato or .•ny
I o~t'ter upect of this collectJon of informatlOI'\, 1ncludin~ .suggestions for reducing the burden, to the Oepanment of Oefenae, E~eet.mve Services and Commun1ca11on1 Directorete 10704·0188) . Respondents •hould be aware t et notwithstanding 1nv other provision of low. no person •hall be subject 10 anv penalty for felling 10 complv with• collection of inform1tion if it does not diaplay a currently valid OMB control number. Pl•••• do not retutn your form to the above organization. Send completed form to the Government luuing Contreo!lng Officor for the Controct/PR No, fitted In Block E.
I A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B{FY17) TDP TM2_ OTHER
0 . SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR I
Acoustic Calibration Standard Upgrade
I 1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
8001 Commercial-Off-The-Shelf (COTS) Manual Part A
I
4. AUTHORITY /Dota Acquisition Docvment No .} , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
I DI-TMSS-80527C PD l6M-285A-SO Atch AFLCMCIWNMEM
7. DO 250 REQ 9. DIST ST A TEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
I NIA REQUIRED
ASREQ See BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT 1 . ADDRESSEE Final I NIA ASREQ SUB~t~~LK 16 Draft Reg Re pro
18. REMARKS I Blk 13: Concurrent with delivery of production unit contractor shall furnish and Ship with unit 3 pack 1 set of the manuals with each unit. Manual shall be on CD/DVD in indexed I Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific I quantities will be identified by issuance of a modification to exercise option
I quantities.
I I I
15. TOTAL .
0 3 0 I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
I B002 Software User Manual (SUM) Part A
I 4. AUTHORITY tOata Acqui$illon Oacvmt1nt No.} , 5. CONTRACT REFERENCE 8 , REQUIRING OFFICE I
Dl-IPSC-81443A PD l 6M-285A-SO Atch AFLCMCIWNMEM I 7 . DD 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See BLK 16 b. COPIES I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final I
ASREQ
SUBMISSION Oral!
NIA Sec: BLK 16 Reg Ropto I
16. REMARKS I
Blk 13: Concurrent with delivery of production unit contractor shall furnish and Ship with unit 3 I pack I set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit.
I The listed number of copies is the maximum amount for the acquisition. Specific I quantities will be identified by issuance of a modification to exercise option quantities.
I I I I
/) .... mi. TOTAL ,.. 0 3 0
I G. PREPARED BY H. DATE
'·~::v{!Zfit
J . DATE
~~ ~ ~f/7/lr;- ~/~/~~ DO FORM 142~ -2, AUG 96 PREVIOUS EDITION MAY BE USE!lV Page __ 0, __ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
(2 Data Items) OMS No. 0704-0188
The public reporting .burden for .this. C;OUoction of Information is estimated to average 220 houre per response , Including the time f0< rev iewing instructions, se1rehino exittif\Q dat. :so\oltcea, gath~t1ng and ~•inteming tht _data , noed~d, lt'ld compl•tin" ind rov.i•wing the collection of information . Sond eommentil ro~ard ing t~i • burden estimate or _any o~her aspect of th11 collection of information, including sugge1t1ons or reducing the bUtde'r\, to the Department of D•f•nse. E);ocuttv• Services and Commu"icat1ons DirectQfate 10704-0188), Respondents should be aware that notwithstonding any other provision of law, no person shall be sublect to any penalty for failing to comply with a collection of information if ~ does not display • cun•ntly valid OMB control number. PIH•• do not return your fonn to the obove orgenlzatlon. Send completed form to the Government luuing Contracting Officer for the Contract/l'R No. liated In Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: I · C(FY18) TOP TM~ OTHER ---
I o. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Acoustic Calibration Standard Upgrade ·
I 1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
COOl Commercial-Off-The-Shelf (COTS) Manual Part A
I
4. AUTHORITY (Data Acquisition Docum<>nt No. } , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
I Dl-TMSS-80527C PD l6M-285A-SO Atch AFLCMC/WNMEM
7. DO 260 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. OISTRISUTION
I NIA REQUIRED
ASREQ See BLK 16 b. COPIES
8. APP CODE D 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final I NIA ASREQ sua~e~O§LK 16 Draft Rog Re pro I
HI . REMARKS
I Blk 13: Concurrent with delivery of production unit contractor shall furnish and Ship with unit 2 pack l set of the manuals with each unit. Manual shall be on CD/DVD in indexed I Portable Document Format (iPDF). Ship with unit. .
I The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option I quantities. I
I
I I
15. TOTAL 0 2 0 I
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
I C002 Software User Manual (SUM) Part A
4. AUTHORITY (Data Acquisition Document No.} I s. CONTRACT REFERENCE 6 . REQUIRING OFFICE I DI-IPSC-81443A PD 16M-285A-SO Atch AFLCMC/WNMEM
I 7. OD 260 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. OATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See BLK 16 b. COPIES
I B. APP CODE D 11, AS OF DATE 13. DATE OF SUBSEQUENT • · ADDRESSEE Final SUBMISSION Draft
NIA ASREQ See BLK 16 Rog Repro
I 16. REMARKS
Blk 13: Concurrent with delivery of production unit contractor shall furnish and Ship with unit 2 I pack 1 set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit. I The listed number of copies is the maximum amount for the acquisition. Specific !
quantities will be identified by issuance of a modification to exercise option I I quantities.
I I i I
I
/1 .... 15JCITAL 0 2 0
I I
\WD~
H. DATE
''tfJ.":~~ TJ:(,Jl, J. DATE I
I q(/7dlJ 21w1s-n DD FORM 1421!-2. AUG 96 PREVIOUS EDITION MA y BE us~.
Page_·_ of' __ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DA TA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing th• collection of inform1tion . Send comments regarding this burden estimate or any other aspect of this collection ot in tormation , including suggestions for reducing tho burden, to the Oepairtment of Defense . Executive Services and Communica~ions Directorate (0704-01 BB) . Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing 10 comply w11h a collec1ion of information if it does not display a currently valid OMB control number. Pfease do not return your form to tho above orgahization . Send completed form to the Government l11uing Contrecting Officer for the Contract/PR No. listed in Block E.
A . CONTRACT LINE ITEM NO. B. EXHIBIT
A(FY 16)
C. CATEGORY:
TOP __ _ TM_X_ OTHER
D. SYSTEM/ITEM I E. CONTRACT IPR NO.
Acoustic Calibration Standard Upgrade
F.CONTRACTOR
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
AOOl Commercial-Off-The-Shelf (COTS) Manual Part B
4 . AUTHORITY (Data Acquisition Document No .) 6, REQUIRING OFFICE
DI-TMSS-80527C 1
5. CONTRACT REFERENCE
PD l 6M-285B-SO Atch AFLCMC/WNMEM
7. DO 250 REQ
NIA
8 . APP CODE
NIA
16. REMARKS
9 . DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
ASREQ
12. DATE OF FIRST SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
BLK 9: The following infonnation shall be included on the manuals:
DISTRIBUTION STATEMENT D: DoD and US DoD contractors only.
Blk 13: No later than 180 days after contract award, concurrent with delivery of first production units, the contractor shall furnish and pack 1 set of manuals with each of the first production units. Manuals shall be on CD/DVD in Indexed Portable Document Fonnat (iPDF). Ship with unit.
Blk 13: No later than 60 days after Contract Award, 1 copy(ies) of the final manual is required. Manual shall be on CD/DVD in indexed Portable Document Fonnat (iPDF). Ship to addressee #1 listed in BLK 14a.
14. DISTRIBUTION
b . COPIES a . ADDRESSEE Final Draft
Rog Ra pro
I. AFMETCAL
Attn: Kathy Vaccaro 813 ln·ing-Wick Dr. W Honon BLDG
Heath. Ohio 43056
Ship with unit
See blk !4a 1
/1 15. TOTAL 0 2 0
G. PREPARED BY J.DATE
#riW11~ 26""µf'/F DD FORM 14~3-1 ! FEB 2001 PREVIOUS EDITION MAY BE Usi{:>. Page of Pages
I
I I
I
17. PRICE GROUP
(1 Data Item} OMB No. 0704-0188
The public reporting burden for this collection of informat ion is estimated to average 11 O hours per response, including the time for reviewing instructions, searchina existing data sources , gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reg_arding t~is burden estimat~ or .any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense , Executive Services and Communications Directorate 10704-0188) . Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with• collection of information if it does not display a currently valid OMB control number . Pleeae do not return your form to the above organization . Send completed form to the Government luuing Contracting Offlcor for tho Contract/PR No. liatod in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY 16) TOP TM x OTHER --- --
D. SYSTEM/ITEM E. CONTRACT/PR NO. F.CONTRACTOR
Acoustic Calibration Standard Upgrade
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Software Test Plan Part B
4. il\UTHORITV (Data Acquisition Document No .) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81438A PD 16M-285B-SO Atch AFLCMCIWNMEM 7 . OD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
8 . APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA D SUBMISSION Draft ASREQ See BLK 16 Reg Repro
16. REMARKS
BLK 12: No later than 90 days after contract award 1 copy of the software test I. AFMETCAL plan is required. Test plan shall be on CD/DVD in Indexed Portable Document Attn: Kathy Vaccaro 1 Fonnat (iPDF). Ship to addressee #1 listed in BLK 14a. 813 lrvinv·Wid: Dri ve W Horton Bldg
Heath, Ohio 43056
/) ./) 15. TOTAL 0 1 0
G. PREPARED BY H.DATE
't;_~~ED v ?~ J.DATE
~/J-- t1ltrJ.r~ ~IJ,{/l(,\ ?~>¥/J DD FORM 1423-h, FEB 2001 PREVIOUS EDITION MAY BE U~ ....... Page of Pages --- ---
I
I
I
I
I I I
I I I
17. PRICE GROUP
I 18. ESTIMA TEO
I TOTAL PRICE
I
I I I I I
(2 Data Items) OMB No. 0704-0188
The public reporting burden for this collection of informat ion is est imated to average 220 hours per response, including the time for reviewing _instru.ctions, searc~ing exist ing data sources , gathering and maintaining the data needed, and complet ing and reviewing the collection of information. Send comments regarding this burden estimate: or .any other aspect of th is collect ion of information, including suggestions for reducing the burden, to the Department of Defense , Executive Services and Commun1cat1ons Directorate (0704·01BBI. Respondents should be aware that notwithstanding any other provision of law, no ·person shall be subject to any penalty for failing to comply with a collect ion of information if it does not display 1 currently val id OMB control nurnber, P1ea1e do not return your form to the above organization . Send completed form to the Government luuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY16) TOP TM " OTHER --- -
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Acoustic Calibration Standard Upgrade
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Software User Manual (SUM) Part.13
4. AUTHORITY (Data Acquisition Document No .) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81443A PD 16M-285B-SO Atch AFLCMC/WNMEM
7. OD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. OATE OF FIRST SUBMISSION t4. DISTRIBUTION
NIA REQUIRED
ASREQ See BLK 16 b. COPIES
B. APP CODE D 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final NIA ASREQ suB~;b~LK 16 Draft
Rog Re pro
16. REMARKS
Blk 13: Concurrent with delivery of production unit contractor shall furnish and Ship with un it 1 pack I set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit.
15. TOTAL 0 1 0
1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE
A004 Acceptance Test Plan PartJ3
4. AUTHORITY (Data Acquisition Document No .) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC~80553A PD l 6M-285B-SO Atch AFLCMC/WNMEM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED NIA ASREQ See BLK 16 b. COPIES 8 . APP CODE D 11 . AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA
SUBMISSION Draft
ASREQ See BLK 16 Reg Ro pro
16. REMARKS
BLK 12: No later than 90 days after contract award 1 copy of the acceptance test I . AFMETCAL 1 plan is requi red. Test plan shall be on CD/DVD in Indexed Portable Document Attn : Kathy Vaccaro Format (iPDF). Ship to addressee #1 listed in BLK 14a. llll lrvlnK·Wick Drive W Horton 81dii
Heath, Ohio 43056
/) - 15. TOTAL 0 1 0
G. PREPARED BY H.DATE
l.r;;::·v;z~
J.DATE
~~~A'.PH. 9/,2.//ir l;?~Sc-)1 ;5 DD FORM 1423-Z, lruG 96 PREVIOUS EDITION MA y BE usW. Page __ of __ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
DATA ITEM DESCRIPTION
Title: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
Number: DI-TMSS-80527C Approval Date: 20110812 AMSC Number: 9207 Limitation: No DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: TM
Applicable Forms: None
Use/relationship: Commercial Off-the-Shelf Manuals may be used as is or with supplementation to support COTS equipment used by DOD. This DID is used to:
a. Acquire sample COTS manuals for evaluation.
b. Acquire COTS manuals which have been evaluated and found to be acceptable.
c. Acquire associated supplemental data, if required.
This DID contains format, content, and intended use information for the data deliverable(s) resulting from the work described in MIL-PRF-32216.
This DID supersedes DI-TMSS-80527B, dated 17 Oct 2006.
Requirements:
1. Content. The manual shall contain all technical information on the assembly, installation, operation, parts, and maintenance of commercial equipment.
2. Evaluation. The manual shall be evaluated using the criteria found in MIL-PRF-32216.
3. Supplementation. The manual may be supplemented with additional data to comply with contract. Supplemental data shall be prepared in accordance with MIL-PRF-32216.
4. Format. The basic manual shall be in the contractor's format. Supplemental data shall be in the format specified by the contracting activity.
5. Digital files. Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals.
6. PDF Files. PDF files shall be searchable, capable of having links added, and have fonts embedded.
7. IETMs. IETMs shall meet the general style and format and user interface requirements in MIL-PRF-87268 or MIL-STD-40051-1 (Army only) or MIL-STD-3031 (Army only).
8. Paper manuals. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.
DATA ITEM DESCRIPTION
Title: Acceptance Test Plan
Number: DI-QCIC-80553A Approval Date: 14 Nov 2006 AMSC Number: 7641 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship: The Acceptance Test Plan details the criteria, performance objectives and list of tests to be performed by the contractor for acceptance tests on systems and equipments.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable to contracts requiring preparation of an acceptance test.
This DID supersede DI-QCIC-80553.
Requirements:
1. Reference documents. None.
2. Format. The plan shall be in contractor’s format.
3. Contents. The plan shall contain the following:
3.1 Overview. Consists of a brief description of the objectives of the acceptance test plan, including flow diagrams, milestones, personnel participation, and security requirements. This section shall include the following:
3.1.1 Flow diagram. A functional description of the acceptance test program using a block diagram portrayal of the functions that must be met to satisfy the total acceptance program. Functions shall be numbered 1.0, 2.0, 3.0, etc…
3.1.2 Milestones. Identifies the start and expected completion dates of each test to be performed.
3.1.3 Participation. Identifies the Government and Contractor participation roles and responsibilities.
DI-QCIC-80553A
3.1.4 Security. Identify and state briefly any security measures of guidelines to be observed.
3.2 Master test list. Lists all test to be accomplished in the order they are to be performed. Separated listings for each location shall be provided. This listings shall be include the following:
3.3 Facility. Location where the acceptance test is to be performed.
3.4 Item number. Number for each piece of equipment or item, test will be performed.
3.5 Test description. Name and brief description of test to be performed.
3.6 Parameters. The number of cycles the test will be performed and selected parameters to be observed.
3.7 Equipment location. Current location of equipment to be tested or used in the acceptance test.
3.8 Special tests. Provides a list of special or unusual tests and examinations necessary to verify satisfactory equipment performance to specifications.
4. Equipment list. The equipment list shall list all equipment to be used in the acceptance test. The listing shall include the following:
4.1 Test equipment. List all test equipment by:
a. Description.
b. Nomenclature.
c. Serial number.
4.2 Support equipment. List all support equipment by.
a. Description.
b. Nomenclature.
c. Serial number.
4.3 Special test equipment. List all special test equipment required to be designed or constructed for use on the program by:
a. Description.
b. Nomenclature.
c. Date required.
5. Validation procedure. An overview of the procedures that the contractor will use to validate the test results.
6. END OF DI-QCIC-80553A
| DD1423 A_B_DIDS 285A_B |
| DD1423 A_B |
| DIDS |
| Acceptance Test Plan.pdf |
| DATA ITEM DESCRIPTION |
| Requirements: |
1423 A001 Part B
File details come from the government source that posted it. Updated .