About this file
DD 1423 for Secondary Vib Cal System
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed_1423_B.pdf | ||
| Anticipated_Delivery_Locations_201A_B.doc | DOC document | |
| MLWARR5_Aug_08.doc | DOC document | |
| 15-Q-0014_Schedule_B.docx | DOCX document | |
| TM-86-01N_13M-201A-VI_(Secondary_Vibration_Calibration_System).docx | DOCX document | |
| PD__13M-201A-VI_Secondary_Vibration_Calibration_System_and_Accelerometer.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and review ing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information , including suggestions for reducing the burden, to the Department of Defense , Executive Services and Communications Directorate (0704-0188) . Respondents should be aware that notw ithstanding any other prov ision of law, no person shall be subject to any penalty for failing to comply w ith a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization . Send completed form to the Government Issuing Contracting Officer for the Contract/PR No . listed in Block E.
A . CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A(FY 15) TOP TM x OTHER --- --
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Secondary Vibration Calibration System
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
AOOl Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM 86-01 N PD 13M-201A-VI Atch AFLCMC/WNMEM 7 . DD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final SUBMISSION Draft NIA ASREQ See BLK 16 Reg Re pro
16. REMARKS 1. AFMETCAL
BLK 8: The Government has 30 calendar days to review the preliminary draft. Ann: Kathy Vaccaro
The contractor has J 0 calendar days after receipt of Government comments to 813 Irving-Wick Drive W Bldg. 2 prepare and deliver the final data. Criteria for approval shall meet the Government Heath, Ohio 43056 comments. Reference the contract number in all correspondence.
Blk 12: No later than 30 days after contract award, J copy(ies) of the draft manual is( are) required on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a. If manuals are available electronically, the file I or web link may be sent to kathryn.vaccaro@us.af.mil. Reference contract number in all correspondence.
Blk J 3: No later than 60 days after after contract award, J copy(ies) of the final manual is required. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Manual shall be in an editable forn1at to allow for technical order number assignment. J
Blk 13: Concurrent with delivery of production units contractor shall furnish and pack J set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship with unit. Ship with unit 16
Blk 13 : No later than 60 days after contract award, concurrent with delivery of first production units, the contractor shall furnish and pack 1 set of manuals with each of the first production units. Manuals shall be on CD/DVD in Indexed
Ship with unit I Portable Document Format (iPDF). Ship with unit.
./"\ 15.TOTAL 1 18 0
G. PREPARED BY H. DATE (jlROVEO "O 1 L J . DATE
~~~ l.fJPi/IP\ /7 fipf /~ DD FORM 1~23-1, FEB 2001 PREVIOUS EDfTION MAY BEU~.
, Page of Pages -- --
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved ( 1 Data Item) OMS No. 0704-0188
The public reporting burden for this collection of information is estimated to average 11 O hours per response, including the time for review ing instructions , searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense , Executive Services and Communications Directorate (0704·0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return y our form to the above o rganizat ion . Send completed form to the Government Issuing Contracting Officer for the Contract /PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B(FY 16) TOP TM x OTHER --- --
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Secondary Vibration Calibration System
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3 . SUBTITLE
BOO ! Technical Manual Contract Requirements (TMCR)
4 . AUTHORITY (Data Acquisition Document No.) , 5. CONTRACT REFEREN CE 6 . REQUIRING OFFICE
TM 86-01 N PD !3M-201A-Vl Atch AFLCMC/WNMEM
7. DD 250 REQ 9 . DIST STATEMENT 10 . FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED NIA ASREQ b. COPIES
8. APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA SUBMISSION Draft NIA NIA Reg Re pro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall Ship with uni t 5 furnish and pack I set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Fom1at (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
/) ~TOTAL 0 5 0
G. PREPARED BY H. DATE ''.JlVED BY (/!~
J. DATE
~~~ t, /I I:) Jl~'" 17 ll/}f /J-'C)( ........ ~ DD FORM 1423J1. FEB 2001 PREVIOUS EDITION MAY BE USED/ \...-'" Page of ' Pages --- ---
17 . PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of info rmat ion is estimated to average 110 hours per response , including the time for review ing instructions , searching existing data sources, gathering and maintaining the data needed , and completing and review ing the collect ion of info rmation. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reduc ing the burden, to the Department of Defense , Execut ive Serv ices and Communicat ions Directorate (0704-0188 ). Respondents should be aw are that notw ithstanding any other provision of law, no person shall be subject to any penalt y for failing to comply w ith a collection of information if it does not display a currently valid OMS cont rol number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No . listed in Block E.
A. CONTRACT LINE ITEM NO. C. CATEGORY: B. EXHIBIT
C(FY 17) TOP ___ TM _ X_ OTHER
F. CONTRACTOR D. SYSTEM/ITEM IE. CONTRACT/PR NO.
Secondary Vibration Calibration System
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3 . SUBTITLE
COOl Technical Manual Contract Requirements (TMCR)
4 . AUTHORITY (Data Acquisition Docum ent No.)
5 . CONTRACT REFERENCE 6 . REQUIRING OFFICE
TM 86-01 N
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY
NIA
REQUIRED ASREQ
8. APP CODE 11. AS OF DATE
NIA ASREQ
16. REMARKS
PD 13M-201A-VI Atch
12. DATE OF FIRST SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Blk 12& 13: Concurrent with delivery of production units, the contractor shall furnish and pack I set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF) . Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities .
AFLCMC/WNMEM
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final Draft
Reg Repro
Ship with Unit 11
/) / "f'!\. TOTAL 0 11 0
G. PREPARED BY H. DATE J. DATE
1711-Pf IF DD FORM 1423-1, FEB 2001 PREVIOUS ED ITT ON MAY B E USEiy'" ~ Page of ' Pages
17 . PRICE GROUP
CONTRACT DAT A REQUIREMENTS LIST Form Approved ( 1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources , gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188) . Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMS control number. Please do not return your fo rm to t he above organization. Send completed form to the Government Issuing Contracting Office r for the Contract/PR No . listed in Block E.
A. CONTRACT LINE ITEM NO . B. EXHIBIT C. CATEGORY:
D(FY 18) TOP TM x OTHER --- --
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
Secondary Vibration Calibration System
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
DOO l Technical Manual Contract Requirements (TMCR)
4. AUTHORITY (Data Acquisition Document No.} , 5. CONTRACT REFERENCE 6 . REQUIRING OFFICE
TM 86-01 N PD 13M-20 1A-VI Atch AFLCMCIWNMEM
7. DD 250 REQ 9 . DIST STATEMENT 10. FREQUEN CY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED ASREQ See BLK 16 b. COPIES
8 . APP CODE 11. AS OF DATE 13 . DATE OF SUBSEQUENT a. ADDRESSEE Final SUBMISSION Draft NIA ASREQ See BLK 16 Reg Repro
16. REMARKS
Blk 12&13 : Concurrent with delivery of production units, the contractor shall furnish and pack 1 set of manuals with each unit. Manuals shall be on CD/DVD in Indexed Portable Document Fornrnt (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific Ship with Unit 12 quantities will be identified by issuance of a modification to exercise option quantities.
/) 15 . .J.QTAL 0 12 0
G. PREPAF.lED BY H. DATE l. tjf'° ·y~_(l J . DATE
~~I t<xJ Alf\// ?if tr/ Uf 1741/ IS- DD FORM 14123-1, FEB 2001 PREVIOUS EDITION MAY BE usw Page of1 Pages --- ---
17. PRICE GROUP
18 . ESTIMATED
File details come from the government source that posted it. Updated .