FA_CDRL.pdf
PDF 101 KB Posted
- Attached to
- EXCITER, RADIO FREQUENCY Federal contract opportunity
- Solicitation number
- SPRHA5-20-R-0449
- Issued by
- Defense Logistics Agency Aviation
About this file
This Contract Data Requirements List (CDRL) outlines two required data items for the federal contract opportunity SPRHA5-20-R-0449 for the procurement of radio frequency exciters. The contractor must submit a First Article Qualification Test Plan a minimum of 30 days prior to first article testing, with re-submittals due no later than 15 days after government comments. Following first article testing, the contractor is required to deliver a First Article Test Report no later than 15 days after testing, with re-submittals due 15 days after receipt of any government comments. Both data items are to be marked and handled at the Destruction Notice level and electronically submitted to the 415th Supply Chain Management Squadron at Tinker Air Force Base.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TOP
TM
OTHER N1T1
D. SYSTEM/ITEM
AN/TPT-T1(V), UMTE
E. CONTRACT/PR NO.
FD20202000449
F. CONTRACTOR
1. DATA ITEM NO.
AOO 1
2. TITLE OF DATA ITEM
First Article Qualification Test Plan
3. SUBTITLE
First Article Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-81307A
5. CONTRACT REFERENCE
USAF AFMC 260 Block 9C
6. REQUIRING OFFICE
415 SCMS/GUEA
7. DD 250 REQ
DD
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Changes to names and office symbols, when necessary, shall be made by letter through the CO/ACO without revision to this CDRL.
Block 9: Data submittal shall be marked with the following on the cover page:
Destruction Notice: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.
Block 12: The Contractor shall deliver the First Article Test Plan a minimum of 30 days prior to first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.
Block 14a: Electronic submission is acceptable. Addresses are:
peter.pham.2@us.af.mil 415SCMS.EN@us.af.mil
415 SCMS/GUEA
FB2029 1
415 SCMS/EN
15.TOTAL 0
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
First Article Test Report
4. AUTHORITY (Dora Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
USAF AFMC 260 Block 9E
6. REQUIRING OFFICE
415 SCMS/GUEA
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSIOIN/A Draft Final
16. REMARKS
Changes to names and office symbols, when necessaly, shall be made by letter through the CO/ACO without revision to this CDRL
Block 9: Data submittal shall be marked with the following on the cover page:
Destruction Notice: Destroy by any means that will prevent disclosure ofthe contents or reconstruction of the document.
Block 12: The Contractor shall deliver the First Article Test Report NLT 15 days after first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.
Block 14a: Electronic submission is acceptable. Addresses are:
engineerus.af.mil
41SSCMS.EN@us.af.mil
415 SCMS/GUEA
FB2029 1
415 SCMS/EN
15.TOTAL 0 1 2
G. PREPARED BY
Engineer 415 SCMS/GUEA PHAM PETER H 1230957769 ge Uy e,,dbyi'i9996PET6iULi23 957769
H. DATE
2020 01 29
I. APPROVED BY
Bryson Kent 415 SCMS/GUEA
KENTBRYSON C 1385517986 ON 38557989
J.DATE
2020 01 30
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DO FOKM 14Z -Z, AUG 96 PREVIOUS EDITION MAY BE USED. Page of
Pages Adobe Professional 8.0
File details come from the government source that posted it. Updated .