FA_CDRL.pdf

PDF 101 KB Posted

Attached to
EXCITER, RADIO FREQUENCY Federal contract opportunity
Solicitation number
SPRHA5-20-R-0449
Issued by
Defense Logistics Agency Aviation

About this file

This Contract Data Requirements List (CDRL) outlines two required data items for the federal contract opportunity SPRHA5-20-R-0449 for the procurement of radio frequency exciters. The contractor must submit a First Article Qualification Test Plan a minimum of 30 days prior to first article testing, with re-submittals due no later than 15 days after government comments. Following first article testing, the contractor is required to deliver a First Article Test Report no later than 15 days after testing, with re-submittals due 15 days after receipt of any government comments. Both data items are to be marked and handled at the Destruction Notice level and electronically submitted to the 415th Supply Chain Management Squadron at Tinker Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to EXCITER, RADIO FREQUENCY, newest first.
File Type Posted
MQR.pdf PDF
SPI.pdf PDF
SPRHA520R0449.pdf PDF
SOW.pdf PDF
CPP.pdf PDF
EDR.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved 0MB No. 0704-0 188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TOP

TM

OTHER N1T1

D. SYSTEM/ITEM

AN/TPT-T1(V), UMTE

E. CONTRACT/PR NO.

FD20202000449

F. CONTRACTOR

1. DATA ITEM NO.

AOO 1

2. TITLE OF DATA ITEM

First Article Qualification Test Plan

3. SUBTITLE

First Article Test Procedure

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81307A

5. CONTRACT REFERENCE

USAF AFMC 260 Block 9C

6. REQUIRING OFFICE

415 SCMS/GUEA

7. DD 250 REQ

DD

9. DIST STATEMENT

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Changes to names and office symbols, when necessary, shall be made by letter through the CO/ACO without revision to this CDRL.

Block 9: Data submittal shall be marked with the following on the cover page:

Destruction Notice: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.

Block 12: The Contractor shall deliver the First Article Test Plan a minimum of 30 days prior to first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.

Block 14a: Electronic submission is acceptable. Addresses are:

peter.pham.2@us.af.mil 415SCMS.EN@us.af.mil

415 SCMS/GUEA

FB2029 1

415 SCMS/EN

15.TOTAL 0

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

First Article Test Report

4. AUTHORITY (Dora Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

USAF AFMC 260 Block 9E

6. REQUIRING OFFICE

415 SCMS/GUEA

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSIOIN/A Draft Final

16. REMARKS

Changes to names and office symbols, when necessaly, shall be made by letter through the CO/ACO without revision to this CDRL

Block 9: Data submittal shall be marked with the following on the cover page:

Destruction Notice: Destroy by any means that will prevent disclosure ofthe contents or reconstruction of the document.

Block 12: The Contractor shall deliver the First Article Test Report NLT 15 days after first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.

Block 14a: Electronic submission is acceptable. Addresses are:

engineerus.af.mil

41SSCMS.EN@us.af.mil

415 SCMS/GUEA

FB2029 1

415 SCMS/EN

15.TOTAL 0 1 2

G. PREPARED BY

Engineer 415 SCMS/GUEA PHAM PETER H 1230957769 ge Uy e,,dbyi'i9996PET6iULi23 957769

H. DATE

2020 01 29

I. APPROVED BY

Bryson Kent 415 SCMS/GUEA

KENTBRYSON C 1385517986 ON 38557989

J.DATE

2020 01 30

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DO FOKM 14Z -Z, AUG 96 PREVIOUS EDITION MAY BE USED. Page of

Pages Adobe Professional 8.0

File details come from the government source that posted it. Updated .