SITE VISIT MINUTES
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO_doc_-_RFI_Format.doc | DOC document | |
| AT-OPSEC_REQUIREMENTS.pdf | ||
| FBO_-_solicitation_provisions_ _clauses.pdf | ||
| Statement_of_Requirment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
179 AW/MSC 06 September 2016
SITE VISIT MINUTES
PROJECT: Bead Blast Booth
Location: 179 AW, Mansfield Ohio Air National Guard
1. The site visit was conducted on 31 August 16 @ 1:00pm. The following were in attendance:
a. Capt Kiet Chung, 179AW/DBCE (COR)
b. Krista Boling, 179AW Environmental Office
c. Adam Giles, 179AW Bio-Environmental Office
d. Scott Pagenkopf, AFG
e. Harley Beatty, N.T. Rudduck
f. Jerry Gooden, Blast-One
g. Gordon Strom, Base Contracting Officer
2. All proceeded directly to building new bead blast booth will be installed in; all were welcomed, signed attendance sheet, and hand-outs were provided (slide brief). The following was also noted:
a. Contractors walked building interior/viewed current bead blast booth exterior and interior.
b. Contractors were reminded of requirement to have existing pit below current blast booth filled with concrete
***Government Action Item***: need all concrete related work/materials specified and provided to contractors
Contractors shall price material and labor related to this aspect of project as a separate line item
c. Contractor inquired as to viability/necessity of an Air Shower
Contractors shall price this item separate from Base bid requirements, for consideration
3. There was nothing else discussed of pertinence; this concluded site visit for Bead Blast Booth project.
4. Contractors are reminded to ensure all questions are submitted no later than the date and time noted in solicitation. Extension to bid closing due date/time will only occur if contractor’s effort to submit a viable proposal is impeded by the Government (i.e. through delay getting answers to RFI’s returned in a timely manner, etc.); requested extensions will be taken into consideration on a case-by-case basis.
SITE VISIT MINUTES – BEAD BLAST BOOTH
5. Any questions or concerns related to these minutes shall be forwarded to the undersigned.
Note: If there are any questions related to these minutes or any aspect of this project, please contact Gordon Strom at 419-520-6390 or via email gordon.m.strom.mil@mail.mil .
GORDON STROM,
Mansfield Ohio ANG