F4F3F49143AG03_Fire_Structural_Rebuild_Questionnaire.pdf
PDF 88 KB Posted
- Attached to
- Fire Dept Structural Trainer Rebuild Federal contract opportunity
- Solicitation number
- F4D3D49143AG03
About this file
Government Responses to Questions received on 21 Aug 2019.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Stuctural_Trainer_Rebuild_RFQ.xlsx | XLSX spreadsheet | |
| Stuctural_Trainer_Rebuild_RFQ.xlsx | XLSX spreadsheet | |
| Salient_Characteristics.pdf | ||
| Stuctural_Trainer_Rebuild_RFQ.xlsx | XLSX spreadsheet | |
| Structural_Trainer_Rebuild_Combo.pdf | ||
| Atch2_SCA_WD_2015-5647_Rev.8_dtd_20190802.pdf | ||
| Atch1_Structual_Rebuild_PWS_20190810.pdf | ||
| Strucural_Pictures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F4F3F49143AG03 Fire Structural Rebuild Questionnaire
21 Aug 2019
Q1. Is it the Government’s intent to remove the current LPG operating system and add a new Fireblast Global LPG control system as this operating system has an output of 4.2 million BTU’s for each interior prop along with new training props?
A1. The Fire department request that a fire scene be built using what is on the PWS specs. LPG System currently in place is functional and may be used. The fire blast system is a template for contractor.
Q2. Is it the intent of the Government to have the same awarded contractor repair the structural trainer and install the new requested LPG System and Props?
A2. The awarded contractor will install the system to fully functional. Also the contractor will warranty work on the system installed as stated in the PWS
Q3. Is the Thermal Lining System in place for all burn rooms?
A3. Yes
Q4. Is it in satisfactory condition?
A4. Yes current system in place is functional with no major issues. Burns are currently being conducted.
File details come from the government source that posted it.