Questions and Answers - 15 June 2020.docx
DOCX document 13 KB Posted
- Attached to
- Recycling Baler Federal contract opportunity
- Solicitation number
- F3YCAG0009A0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers - 17 June 2020.docx | DOCX document | |
| Control Panel with Electric Supply to Baler.pdf | ||
| Baler Control Panel.pdf | ||
| Conveyor Chute Bolted to Infeed Conveyor.pdf | ||
| F3YCAG0009A001 - CSS - 12 June 2020.doc | DOC document | |
| Entire Baler.pdf | ||
| Questions and Answers - 12 June 2020.docx | DOCX document | |
| Platform to Remove Bales from Baler.pdf | ||
| Bale and Conveyor Inside Building.pdf | ||
| F3YCAG0009A001 - CSS - BALER.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers 15 June 2020
1. How wide is the building? Bldg. 40ft wide
2. How far is it from the wall to the hopper? Electric side to the center conveyor is 16ft 4 inches, 1ft 10 inches is the wall from the bailer on the power side, output side from the bailer to the wall is 10ft
3. Can the conveyor be relocated to accommodate the new baler? Yes, is can be accommodated for the new bailer
4. Would they be open to changing the bale cross section of the unit? Yes, we will be willing to
5. Can we get a detailed drawing of the machine and conveyor? If not would there be a chance to visit the facility to pull measurements before shipping unit? No there are no detailed drawing of the machine in the building. Yes, before shipping unit will defiantly need to visit
6. Is there a facility layout drawing of the baler and conveyor? If not could rough dimensions be supplied of the overall length of the unit from rear of HPU to front of Bale table, distance from the rear of the hopper (side facing the HPU) to the wall of the facility? 320 7/8 inches overall size, 60 13/16 inches is the feed chute size from the center of the chute to the wall, Electric side to the center of chute is 16ft 4 inches
7. Is the power unit required to be on the rear of the Baler, could it be mounted on the floor? We can mount it on the floor