Q A_-_30_Aug_2016.pdf

PDF 9 KB Posted

Attached to
Ventilation Upgrade Federal contract opportunity
Solicitation number
F3QCCM5338A001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Answers to questions - 30 Aug 2016

View the file

Other files for this federal contract opportunity

Other files attached to Ventilation Upgrade, newest first.
File Type Posted
SOW_-_2_Jun_2016.pdf PDF
Q A_-_26_Aug_2016.pdf PDF
Wage_Determination_2015-2139_Rev_4_Dated_8_Jul_2016.pdf PDF
Appendix_C.pdf PDF
CDRL_A004-Signed.pdf PDF
CDRL_A003-Signed.pdf PDF
CDRLs_A001-A002-Signed.pdf PDF
RFQ.doc DOC document
dust_collector_layout.pdf PDF
Images_Reference.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - F3QCCM5338A001

30 Aug 2016

Q1: Looking through the SOW , I do not see where any T&B or controls is required . Please clarify?

A1: The supply fan controls are addressed in the last bullet of section 2.2 (1) of the SOW. The new fan controls need to utilize the existing control cabinet for the current fans. The dust collectors controls are addressed in the last couple bullets of section 2.2 (2) of the SOW. The dust collectors fans are to be controlled by an integrated control panel. These panels need to be tied into the existing control cabinet.

Q2: I am a supplier of the products required on this project. Is there a website I can view that lists the specifications for the project? All I have received is the RFQ document from several of the contractors.

A2: The SOW is now on FBO. Due to this error, the Government has extended the due date of responses to noon on Tuesday, 6 September 2016.

File details come from the government source that posted it. Updated .