Pricing Schedule - Basic Yr.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Basewide Floor Covering Indefinite Delivery/Indefinite Quantitiy (IDIQ) Federal contract opportunity
- Solicitation number
- F3Q2AD9220A002
About this file
Pricing Schedule - Basic Yr
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing Schedule - Opt Yr 4.xls | XLS spreadsheet | |
| Statement of Work.pdf | ||
| Pricing Schedule - Opt Yr 1.xls | XLS spreadsheet | |
| Appendix C.pdf | ||
| Pricing Schedule - Opt Yr 2.xls | XLS spreadsheet | |
| Pricing Schedule - Opt Yr 3.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| UHHZ 090327 - BASEWIDE FLOOR COVERING IDIQ | ||||||||||
| (BASIC YEAR - DATE OF AWARD THROUGH 12 CALENDAR MONTHS) | ||||||||||
| PRICE SCHEDULE | ||||||||||
| ABBREVIATIONS: | ||||||||||
| SY = Square Yard WH = Working Hours | ||||||||||
| SF = Square Foot NWH = Non Working Hours | ||||||||||
| LF = Linear Foot HR = Hour | ||||||||||
| EA = EACH NTE = Not to Exceed | ||||||||||
| Government Required Delivery to be cited on each Individual Delivery Order. | ||||||||||
| Ship Destination to be cited on each Individual Delivery Order. | ||||||||||
| ALL CLINs MUST HAVE A UNIT PRICE TO BE CONSIDERED RESPONSIVE TO THE RFQ | ||||||||||
| ID | Sort | Type | Contract Line Item Number (CLIN) | Unit Line Number | Description - Supplies or Services | NTE Unit Price | Est. Qty. | Unit | Sub-Total | |
| REMOVAL | ||||||||||
| 1021 | Normal | 0001 | 013113200120 | Remove glued down carpet or carpet tile, jute or synthetic, hard or soft back. Disposal of materials to be made by Contractor. | 5,000 | SY | $0.00 | |||
| 1022 | Normal | 0002 | 013113200260 | Remove glued down cushion-backed carpet or carpet tile. Disposal of materials to be made by Contractor. | 1,000 | SY | $0.00 | |||
| 1023 | Normal | 0003 | Remove tackless carpet. NOTE: If carpet installed by the tackless method has been installed on padding cemented to the floor, the charge for removing both carpeting and padding shall be the same as the charge for removal of cushion backed carpet. | 1,000 | SY | $0.00 | ||||
| 1024 | Normal | 0004 | Remove vinyl or vinyl composition tile (not asbestos-containing) to include remaining adhesive. Disposal of materials to be made by Contractor. | 1,200 | SY | $0.00 | ||||
| 1025 | Normal | 0005 | Remove existing rubber, vinyl or carpet base, including smoothing and cleaning of surface. | 1,000 | LF | $0.00 | ||||
| 1026 | Normal | 0006 | Remove rubber tile or flooring to include remaining adhesive. Disposal of material to be made by Contractor. | 500 | LF | $0.00 | ||||
| 1027 | Normal | 0007 | Remove sheet vinyl to include remaining adhesive. Disposal of materials to be made by Contractor. | 5,000 | SY | $0.00 | ||||
| 1028 | Normal | 0008 | Remove plywood or other wood underlayment (not structural subfloor). | 1,000 | SF | $0.00 | ||||
| 1029 | Normal | 0009 | Disposal of Waste Material in Reclamation Centers. Amount to be added to traditional disposal procedures. | 1,000 | SY | $0.00 | ||||
| 1030 | Normal | UNDERLAYMENT | ||||||||
| 1031 | Normal | 0010 | 013113200120 | Install 1/2 inch plywood 4' x 8' sheet. | 50 | EA | $0.00 | |||
| 1032 | Normal | 0011 | 013113200260 | Install 5/8 inch plywood 4' x 8' sheet. | 50 | EA | $0.00 | |||
| 1033 | Normal | 0012 | Install 5/8 inch premium plywood underlayment, tongue and groove, 4' x 8' sheet. | 50 | EA | $0.00 | ||||
| 1034 | Normal | 0013 | Install 3/4 inch plywood 4' x 8' sheet. | 50 | EA | $0.00 | ||||
| 0014 | Install 3/4 inch OSB, tongue and groove, 4' x 8' sheet. | 50 | EA | $0.00 | ||||||
| FLOOR PREPARATION | ||||||||||
| 0015 | 013113200120 | Prime chalky or dusty surface. | 100 | SY | $0.00 | |||||
| 1035 | Normal | 0016 | 013113200260 | Floating and patching of uneven floor to include scratch coat and skim coat of latex underlayment. | 1,000 | SF | $0.00 | |||
| 0017 | Smoothing of uneven concrete floors, to include grinding with power finishing machine to reduce bumps or ridges. | 1,000 | SF | $0.00 | ||||||
| INSTALLATION | ||||||||||
| 0018 | 013113200120 | Install carpets glue down (less than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. WH | 200 | SY | $0.00 | |||||
| 0019 | 013113200260 | Install carpets glue down (more than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. WH | 1,000 | SY | $0.00 | |||||
| 0020 | Install carpets glue down (less than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. NWH | 200 | SY | $0.00 | ||||||
| 0021 | Install carpets glue down (more than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. NWH | 500 | SY | $0.00 | ||||||
| 0022 | Install carpets, tackless (less than 200 square yards). Includes removal and replacement of tack strip and invisible edge securing strip as requested. WH | 200 | SY | $0.00 | ||||||
| 0023 | Install carpets, tackless (more than 200 square yards). Includes removal and replacement of tack strip and invisible edge securing strip as requested. WH | 500 | SY | $0.00 | ||||||
| 0024 | Install carpets, tackless (less than 200 square yards). Includes removal and replacement of tack strip and invisible edge securing strip as requested. NWH | 200 | SY | $0.00 | ||||||
| 0025 | Install carpets, tackless (more than 200 square yards). Includes removal and replacement of tack strip and invisible edge securing strip as requested. NWH | 500 | SY | $0.00 | ||||||
| 0026 | Install carpet tiles (less than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. WH | 200 | SY | $0.00 | ||||||
| 0027 | Install carpet tiles (more than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. WH | 500 | SY | $0.00 | ||||||
| 0028 | Install carpet tiles (less than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. NWH | 200 | SY | $0.00 | ||||||
| 0029 | Install carpet tiles (more than 200 square yards). Include adhesive required for installation as per manufacturer's instructions. NWH | 500 | SY | $0.00 | ||||||
| 0030 | Install carpet tiles (more than 200 square yards) over existing carpet installation. Include dry-mesh adhesive required for installation as per manufacturer's instructions. NWH | 200 | SY | $0.00 | ||||||
| 0031 | Supply and install carpet cove base, including cove cap filet strip, and removal of old base or carpet cove. | 100 | LF | $0.00 | ||||||
| 0032 | Installation of carpet on stairs to include tread and risers | 100 | LF | $0.00 | ||||||
| 0033 | Install walk-off matting including reducer strip edges and appropriate backing for carpet-to-carpet or carpet-to-vinyl placement. | 200 | SF | $0.00 | ||||||
| 0034 | Repair and altering (including rotation and replacement of carpet tiles, repairing seams, restretching or regluing beyond warranty period). Minimum labor and trip charge. | 10 | EA | $0.00 | ||||||
| 0035 | Custom Work - Borders per square foot for each color or pattern. | 100 | SY | $0.00 | ||||||
| 0036 | Custom Work (including upholstering altars and stages, logos or inset patterns involving intricate cuts). Written quote to be supplied after site visit. | 100 | SY | $0.00 | ||||||
| 0037 | Install sheet vinyl. Minimum order 40 square feet. | 100 | SF | $0.00 | ||||||
| 0038 | Install sheet vinyl heat weld. Minimum order 40 square feet. | 100 | SF | $0.00 | ||||||
| 0039 | Cove sheet vinyl including metal or vinyl cove cap, wood support strip under coved area and metal outside corners, include removal of old base, any type. Minimum order 40 lineal feet. | 100 | LF | $0.00 | ||||||
| 0040 | Install rubber floor tile. Minimum order 40 square feet of floor tile. | 100 | SF | $0.00 | ||||||
| 0041 | Install vinyl or composition tile. Minimum order 40 square feet of floor tile. | 100 | SF | $0.00 | ||||||
| 0042 | Supply and install hammered metal naplock edge stripping. Silver or gold. | 100 | LF | $0.00 | ||||||
| 0043 | Supply and install rubber reducer strip. | 100 | LF | $0.00 | ||||||
| 0044 | Supply and install vinyl reducer strip. | 50 | LF | $0.00 | ||||||
| 0045 | Supply and install metal track with vinyl insert, any color and style as requested. | 100 | LF | $0.00 | ||||||
| 0046 | Supply and install wood shoe mold, stained or painted to match existing wall or base. | 100 | LF | $0.00 | ||||||
| 0047 | Supply and install vinyl cove base molding 4 inches high, 5/8 inches toe or no toe, and 1/8 inch thickness, any color 4' or continuous roll as requested, to include pre-molded outside corners. | 1,000 | LF | $0.00 | ||||||
| 0048 | Supply and install vinyl cove base molding 6 inches high, 5/8 inches toe or no toe, and 1/8 inch thickness, any color 4' or continuous roll as requested, to include pre-molded outside corners. | 500 | LF | $0.00 | ||||||
| 0049 | Supply and install rubber cove base molding 4 inches high, 5/8 inches toe or no toe, and 1/8 inch thickness, any color 4' or continuous roll as requested, to include pre-molded outside corners. | 1,000 | LF | $0.00 | ||||||
| 0050 | Supply and install rubber cove base molding 6 inches high, 5/8 inches toe or no toe, and 1/8 inch thickness, any color 4' or continuous roll as requested, to include pre-molded outside corners. | 1,000 | LF | $0.00 | ||||||
| 0051 | 013113200120 | Supply and install rubber stair treads to include removal of old tread material. Provide Manufacturer and Pattern: . | 2,000 | SY | $0.00 | |||||
| 0052 | 013113200120 | Supply and install rubber riser 7 inches high with cove. Includes removal of existing riser material. Provide Manufacturer and Pattern: . | 1,000 | SY | $0.00 | |||||
| 0053 | 013113200260 | Supply and install rubber stringers 10 inches high, 6' long to include removal of existing stringers. Provide Manufacturer and Pattern: . | 2,000 | SY | $0.00 | |||||
| 0054 | Supply and install bullnose metal stair nosing. Provide Manufacturer and Pattern: . | 1,000 | SY | $0.00 | ||||||
| MISCELLANEOUS | ||||||||||
| 0055 | 013113200120 | Furniture moving and replacement. Areas such as libraries and laboratories are not covered here. Systems and modular furniture are not covered here. Normal furniture moving will be based on the average person having 100 SF of floor space. A typical workspace will have a desk, file cabinet (1 or 2), credenza, bookcase, chairs (1 or 2). An executive office may have a conference table and chairs in addition to the typical office furniture. | 5,000 | SY | $0.00 | |||||
| 0056 | 013113200260 | Lifting of systems furniture vertically without dismantling prior to installation of new carpet tile (method not possible for broadloom carpet). Personnel must be trained in such lifting procedures and approved by the systems furniture manufacturer. Disconnection of wiring not required under this method. | 1,000 | SY | $0.00 | |||||
| 0057 | Removal of existing asbestos containing material. Includes but not limited to: Mastic under floor tile containing asbestos containing material. | 1,000 | SF | $0.00 | ||||||
| 0058 | Removal and reinstallation of existing bolted-down seating (i.e. chapel pews, theatre seating, etc.). Storage of existing bolted-down seating to be included. | 100 | EA | $0.00 | ||||||
| 0059 | Move vending machines, water coolers, refrigerators, etc. | 100 | EA | $0.00 | ||||||
| 0060 | Remove, cut off and refill bottom rail wood door maximum width 4'-6", to include rehanging (metal doors not included). | 100 | EA | $0.00 | ||||||
| 0061 | Receiving and storing carpet prior to installation | 1,000 | SY | $0.00 | ||||||
| 0062 | 013113200260 | 20 CY Dumpsters Rental. Price includes service to deliver and pick-up of dumpster, hauling of debris, rental of dumpster and disposal fee. Use on delivery orders with large demolition requirements. | 1 | EA | $0.00 | |||||
| 0063 | 013113200260 | 40 CY Dumpsters Rental. Price includes service to deliver and pick-up of dumpster, hauling of debris, rental of dumpster and disposal fee. Use on delivery orders with large demolition requirements. | 1 | EA | $0.00 | |||||
| PRODUCTS | ||||||||||
| 0064 | 013113200120 | Carpet Type I, 28 oz., broadloom. Provide Manufacturer and Pattern: | ||||||||
| . | 2,000 | SY | $0.00 | |||||||
| 0065 | 013113200120 | Carpet Type II, 26 oz, carpet tile. Provide Manufacturer and Pattern: | ||||||||
| . | 2,000 | SY | $0.00 | |||||||
| 0066 | 013113200260 | Carpet Type III, 50 oz., entrance tiles. Provide Manufacturer and Pattern: | ||||||||
| . | 2,000 | SY | $0.00 | |||||||
| 0067 | 12 x 12 Vinyl Composition Tile, 1/8 inch standard grade. Provide Manufacturer and Pattern: . | 200 | SF | $0.00 | ||||||
| 0068 | 12 x 12 Vinyl Composition Tile, 1/8 inch premium grade. Provide Manufacturer and Pattern: . | 500 | SF | $0.00 | ||||||
| 0069 | 12 x 12 Conductive Solid Vinyl Tile, 1/8 inch thick. Provide Manufacturer and Pattern: . | 200 | SF | $0.00 | ||||||
| 0070 | 12 x 12 Conductive Solid Vinyl Tile, 1/8 inch luxury grade. Provide Manufacturer and Pattern: . | 1,000 | SF | $0.00 | ||||||
| 0071 | Vinyl Composition Sheet Goods. Provide Manufacturer and Pattern: | |||||||||
| . | 500 | SY | $0.00 | |||||||
| 0072 | Solid Vinyl Sheet Goods. Provide Manufacturer and Pattern: | |||||||||
| . | 250 | SY | $0.00 | |||||||
| 0073 | Raised Disc or Square rubber floor tiles. Provide Manufacturer and Pattern: | |||||||||
| . | 1,000 | SY | $0.00 | |||||||
| 0074 | Raised Disc or Square rubber stair tread. Provide Manufacturer and Pattern: | |||||||||
| . | 1,000 | LF | $0.00 | |||||||
| 0074 | Recycled Content Material. Amount to be added to traditional material costs. Alternate schedule for line items using recycled content material may be submitted in lieu of additive unit cost. | 1,000 | SY | $0.00 | ||||||
| TOTAL Evaluated | ||||||||||
| Price (TEP) | $0.00 |
File details come from the government source that posted it. Updated .