Schedule of Material Submittals.xls

XLS spreadsheet 135 KB Posted

Attached to
Runway Rubber Removal Federal contract opportunity
Solicitation number
F3N7A01017A001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Runway Rubber Removal, newest first.
File Type Posted
RFQ.docx DOCX document
AF 3052 Contractor.xls XLS spreadsheet
R-653-05.pdf PDF
PPI Questionnaire.docx DOCX document
PPI Reference List.docx DOCX document
R-653-01.pdf PDF
R-653-02.pdf PDF
09-1025 Specs English.pdf PDF
R-653-03.pdf PDF
R-653-04.pdf PDF
09-1025 Specs Spanish.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 09-1025PROJECT TITLE
RUBBER REMOVAL - FY11SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01011
1Progress Schedule4Commencing+5
2Mobility Plan4Commencing-5
3Project sign4Site fencing+1
4Quality Control Plan4Commencing-5
5Waste & construction debris management4Final Inspection
6As-Built drawings4FI+15
7Personel listing4Commencing-5
8Safety Program4Commencing-5
9Warranty letter4FI+30
SECTION 02684
10Paint4444Award+15
11Glass Spheres444Award+15

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 09-1025TÍTULO DE PROYECTO:
ELIMINACION DE CAUCHO - AF11SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01011
1Programa de avance de obras4Comienzo+5
2Plan de movilización4Comienzo-5
3Cartel informativo de obra4Vallado+1
4Plan de control de calidad4Comienzo-5
5Gestión de residuos y escombros4Inspección final
6Planos As-Builts4IF+15
7Listado de personal4Comienzo-5
8Plan de seguridad4Comienzo-5
9Carta de garantía4IF+30
SECCIÓN 02684
10Pintura4444Adjudicacion+15
11Reflectorizador444Adjudicacion+15

&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal