Schedule of Material Submittals.xls
XLS spreadsheet 135 KB Posted
- Attached to
- Runway Rubber Removal Federal contract opportunity
- Solicitation number
- F3N7A01017A001
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ.docx | DOCX document | |
| AF 3052 Contractor.xls | XLS spreadsheet | |
| R-653-05.pdf | ||
| PPI Questionnaire.docx | DOCX document | |
| PPI Reference List.docx | DOCX document | |
| R-653-01.pdf | ||
| R-653-02.pdf | ||
| 09-1025 Specs English.pdf | ||
| R-653-03.pdf | ||
| R-653-04.pdf | ||
| 09-1025 Specs Spanish.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||||||||||||||||||||||
| QUUG 09-1025 | PROJECT TITLE | |||||||||||||||||||||||
| RUBBER REMOVAL - FY11 | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| SECTION 01011 | ||||||||||||||||||||||||
| 1 | Progress Schedule | 4 | Commencing+5 | |||||||||||||||||||||
| 2 | Mobility Plan | 4 | Commencing-5 | |||||||||||||||||||||
| 3 | Project sign | 4 | Site fencing+1 | |||||||||||||||||||||
| 4 | Quality Control Plan | 4 | Commencing-5 | |||||||||||||||||||||
| 5 | Waste & construction debris management | 4 | Final Inspection | |||||||||||||||||||||
| 6 | As-Built drawings | 4 | FI+15 | |||||||||||||||||||||
| 7 | Personel listing | 4 | Commencing-5 | |||||||||||||||||||||
| 8 | Safety Program | 4 | Commencing-5 | |||||||||||||||||||||
| 9 | Warranty letter | 4 | FI+30 | |||||||||||||||||||||
| SECTION 02684 | ||||||||||||||||||||||||
| 10 | Paint | 4 | 4 | 4 | 4 | Award+15 | ||||||||||||||||||
| 11 | Glass Spheres | 4 | 4 | 4 | Award+15 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||||||||||||||||||||||
| QUUG 09-1025 | TÍTULO DE PROYECTO: | |||||||||||||||||||||||
| ELIMINACION DE CAUCHO - AF11 | SOLICITACIÓN / CONTRATO NO. | |||||||||||||||||||||||
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | ||
| APROBADO | DESAPROBADO | |||||||||||||||||||||||
| SECCIÓN 01011 | ||||||||||||||||||||||||
| 1 | Programa de avance de obras | 4 | Comienzo+5 | |||||||||||||||||||||
| 2 | Plan de movilización | 4 | Comienzo-5 | |||||||||||||||||||||
| 3 | Cartel informativo de obra | 4 | Vallado+1 | |||||||||||||||||||||
| 4 | Plan de control de calidad | 4 | Comienzo-5 | |||||||||||||||||||||
| 5 | Gestión de residuos y escombros | 4 | Inspección final | |||||||||||||||||||||
| 6 | Planos As-Builts | 4 | IF+15 | |||||||||||||||||||||
| 7 | Listado de personal | 4 | Comienzo-5 | |||||||||||||||||||||
| 8 | Plan de seguridad | 4 | Comienzo-5 | |||||||||||||||||||||
| 9 | Carta de garantía | 4 | IF+30 | |||||||||||||||||||||
| SECCIÓN 02684 | ||||||||||||||||||||||||
| 10 | Pintura | 4 | 4 | 4 | 4 | Adjudicacion+15 | ||||||||||||||||||
| 11 | Reflectorizador | 4 | 4 | 4 | Adjudicacion+15 |
&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .