AF 3052 Contractor.xls
XLS spreadsheet 43 KB Posted
- Attached to
- Runway Rubber Removal Federal contract opportunity
- Solicitation number
- F3N7A01017A001
About this file
This is the correct cost estimate breakdown to be used for this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ.docx | DOCX document | |
| PPI Reference List.docx | DOCX document | |
| Schedule of Material Submittals.xls | XLS spreadsheet | |
| R-653-01.pdf | ||
| R-653-02.pdf | ||
| 09-1025 Specs English.pdf | ||
| R-653-03.pdf | ||
| R-653-04.pdf | ||
| 09-1025 Specs Spanish.pdf | ||
| R-653-05.pdf | ||
| PPI Questionnaire.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktr Base Bid
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RUBBER REMOVAL - FY11/ELIMINACION DE CAUCHO - AF11 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 09-1025 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LINE | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BASE BID: RUBBER REMOVAL | ||||||||||
| OFERTA BASICA: ELIMINACION DE CAUCHO | ||||||||||
| 1 | Rubber removal. | |||||||||
| Eliminación de caucho. | m2 | 41,356.62 | ||||||||
| Total | ||||||||||
| Total | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT (EUROS) | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&R&"Times New Roman,Regular"Page &P of &N
Ktr Option Bid Item #1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RUBBER REMOVAL - FY11/ELIMINACION DE CAUCHO - AF11 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 09-1025 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LINE | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION BID ITEM #1: PAINT MARKINGS | ||||||||||
| OFERTA OPCION ITEM #1: PINTAR SEÑALES | ||||||||||
| 1 | 2 runway designation markings (02 & 20) | |||||||||
| 2 señales designadoras de pista (02 y 20) | m2 | 184.75 | ||||||||
| 2 | Outline of 2 runway designation markings (02 & 20) | |||||||||
| Rebordeado de 2 señales designadoras de pista (02 y 20) | m2 | 35.40 | ||||||||
| 3 | 38 stripes of runway centerline marking | |||||||||
| 38 trazos de señal de eje de pista | m2 | 513.00 | ||||||||
| 4 | Outline of 10 stripes of runway centerline marking | |||||||||
| Rebordeado de 10 trazos de señal de eje de pista | m2 | 89.51 | ||||||||
| 5 | 2 threshold markings | |||||||||
| 2 señales de umbral | m2 | 1,728.00 | ||||||||
| 6 | Outline of 2 threshold markings | |||||||||
| Rebordeado de 2 señales de umbral | m2 | 1,798.92 | ||||||||
| 7 | 16 circles of aircraft arresting system marking | |||||||||
| 16 círculos de señal de sistema de frenado de aeronaves | m2 | 113.10 | ||||||||
| 8 | Stretch of taxiway centerline marking | |||||||||
| Tramo de señal de eje de calle de rodaje | m2 | 21.46 | ||||||||
| Total | ||||||||||
| Total | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT (EUROS) | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&R&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .