Area X QAV1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Area X Fiber Upgrade Federal contract opportunity
- Solicitation number
- F2BDBD9210A001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Area X QA.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation Area X Fiber Upgrade v1.docx | DOCX document | |
| HBSA Area X Fiber Locations v1.pptx | PPTX presentation | |
| B1614 SOW Area X__10 April 2020_V1.docx | DOCX document | |
| Combined Synopsis Solicitation Area X Fiber Upgrade v1.docx | DOCX document | |
| B1614 SOW Area X_New area config.docx | DOCX document | |
| CLSExport_FA283520P0009.pdf | ||
| HBSA Area X Fiber Locations.pptx | PPTX presentation | |
| Combined Synopsis Solicitation Area X Fiber Upgrade.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Q&A Area X Fiber Upgrade 29 May 2020 | ||
| Contractor Question | Government Answer | |
| 1 | Are Contractors to supply and install the racks mentioned in the scope, or will the fiber be installed in existing racks? | The racks are in place and the contractor does not need to provide them. |
| 2 | There is mention of a "Phase 0 Data Room." Is that room located in the drawing provided? If so, can it be defined? | For security reasons, the Phase 0 Data Room is not on the drawing, but the approximate length is on the SOW. |
| 3 | Are the 6 port locatons to be surface mounted on each modular desk? Will the Contractor need to install raceway or can they use internal modular raceway? | The 6 port locations on the modular desk can be routed within the modular furniture. |
| 4 | Solicitation states offers are due Monday, 5 June 2020. Please confirm due date, as 5 June is a Friday. | Offers are due Friday, 5 June 2020. |
| 5 | How many 6 port duplex faceplates/drops in each cubicle are required? What is the total number of fibers per cubicle? | There are 33 workstations, each workstation will get a 6 port duplex faceplate. 6 port duplex = 12 strands of fiber per workstation. |
| 6 | Does Main Area Distribution Rack MA/R2 & War Room Rack WR/R1 connect to each other? | Yes install and connect MA/R2 to WR/R1 |
| 7 | Does Main Area Distribution Rack MA/R2 connect to Phase 0 Data Room? | Yes install and connect MA/R2 to Phase 0 Data Room |
| 8 | The "Fiber Layout Spec" drawing counts 61, however the description says 68 6 port/12 fiber. Please confirm if 61 or 68. | Correct number is 61; typo on description |